Contracts and spending
Who Eagle Mountain pays, for what, and how the vendor was chosen: every contract, bid award, change order, purchase, grant and land deal that came before the City Council, from the meeting minutes and packets.
- Contracts, purchases and land deals approved
- $637.4 million
- Line items
- 615
- Vendors
- 26
Every approval, newest first
| Date | Who and what | Amount |
|---|---|---|
| Tue, Oct 6 | No vendor named: Ranches Parkway improvements interlocal agreement with Utah County | — |
| Tue, Oct 6 | Smith's Food & Drug Centers, Inc.: Purchase agreement | — |
| Tue, Sep 15 | No vendor named: Change orders #6 and #7, 2025 Midvalley Road extension | — |
| Tue, Sep 15 | Utah Public Solutions LLC: Lobbying services | — |
| Tue, Sep 15 | Spring Run Parkway Partners II, LP: Reimbursement agreement | — |
| Tue, Sep 15 | No vendor named: First amendment to the fiscal 2026-27 annual budget | — |
| Tue, Sep 1 | No vendor named: White Hills 4 MG tank change order #3, final true-up costs | — |
| Tue, Aug 18 | No vendor named: Fiscal 2026-27 annual budget total | $364.0 million |
| Tue, Aug 18 | No vendor named: Projected added ad valorem property tax revenue above the prior year (69.81 percent), excluding new growth | $2.13 million |
| Tue, Aug 18 | MGC Contractors, Inc.: EMC 6.0 MGD wastewater treatment facility expansion, GMP-2 oxidation ditch and miscellaneous site improvements | — |
| Tue, Aug 18 | Terra Smith's Eagle Mountain LLC: Community reinvestment area participation agreement | — |
| Mon, Aug 10 | No vendor named: Community Development Block Grant annual action plan, program year 2026 | — |
| Thu, Aug 6 | No vendor named: Projected added ad valorem property tax revenue above the prior year (183.02 percent), excluding new growth | $5.59 million |
| Tue, Jul 7 | Legislative Executive Consulting, LLC: Legislative consulting renewal | — |
| Tue, Jul 7 | White Hills Water Company: Water tank reimbursement agreement, first amendment | — |
| Tue, Jul 7 | No vendor named: Citywide speed management study | — |
| Tue, Jun 16 | BHI: Change order #4, traffic signal at Eagle Mountain Boulevard and Pony Express Parkway | — |
| Tue, Jun 16 | West Coast Code Consultants: Building permit and inspection services | — |
| Tue, Jun 16 | MHTN Architects: City Hall and library feasibility study | — |
| Tue, Jun 16 | No vendor named: Third amendment to the fiscal 2025-26 budget | — |
| Tue, Jun 16 | No vendor named: Fiscal 2026-27 interim budget | — |
| Tue, Jun 2 | Building Code Solutions: Third-party permit, plan review and inspection | — |
| Tue, Jun 2 | Forged Fiber 37, LLC: Fiber franchise | — |
| Tue, Jun 2 | No vendor named: Sale of a portion of the parcel at $2.07 per square foot; total not stated | — |
| Tue, Jun 2 | No vendor named: Sales and use tax pledge for Redevelopment Agency sales tax and tax increment revenue bonds, Series 2026 | — |
| Tue, May 19 | CDBG funds: Maximum monthly utility assistance (50% of bill) | $75 |
| Tue, May 5 | Stokes Strategies: Lobbying services | — |
| Tue, May 5 | No vendor named: Belle Street booster power conduit replacement and SCADA, change order #2 | — |
| Tue, May 5 | No vendor named: Mid Valley West extension, change order #5 | — |
| Tue, May 5 | QTS: Reduced plan review fee, QTS Buildings 4 and 5 | — |
| Tue, May 5 | No vendor named: Fiscal 2026-27 tentative budget | — |
| Tue, Apr 21 | MGC Contractors, Inc.: Membrane filtration system equipment procurement, GMP 1, 6.0 MGD wastewater expansion | — |
| Tue, Apr 7 | SITLA: Land exchange in the Overland area | — |
| Tue, Apr 7 | No vendor named: Sale of a portion of the parcel at $2.07 per square foot; total depends on surveyed area | — |
| Tue, Mar 3 | Rino Construction: Change order #1, Pony Express parallel waterline | — |
| Tue, Mar 3 | BHI: Change orders #2 and #3, 2025 traffic signal at Eagle Mountain Boulevard and Pony Express Parkway | — |
| Tue, Mar 3 | The Church of Jesus Christ of Latter-day Saints: Property for Well #9 | — |
| Tue, Mar 3 | Economic & Planning Systems, Inc.: Market study for tax increment financing of off-site infrastructure | — |
| Tue, Feb 17 | Hemmco Consulting: Legislative advocacy and coordination services | — |
| Tue, Feb 17 | No vendor named: Second amendment to the fiscal 2025-26 budget | — |
| Tue, Feb 17 | GilmoreBell (firm presenting): Series 2026 water and sewer revenue bonds; maximum stated inconsistently as $220 million and $230 million | — |
| Tue, Jan 6 | MGC Contractors: Construction-manager/general-contractor for 6 MGD MBR wastewater expansion | — |
| Tue, Dec 16 | Eagle Quest LLC: Right-of-way agreement | — |
| Tue, Dec 16 | No vendor named: Mid Valley Road right-of-way ratification | — |
| Tue, Dec 16 | SITLA: Land exchange with SITLA | — |
| Tue, Dec 2 | Ultimate Home Lending, LLC: Mortgage Assistance Program contract amendments | — |
| Wed, Nov 5 | CDBG funds: Maximum forgivable loan per business, Commercial Affordability Program | $75,000 |
| Tue, Oct 21 | Stadion, LLC: Water and sewer fees for 125 additional acre-feet at current net present value | — |
| Tue, Oct 7 | Advanced Engineering and Environmental Services, LLC: Increase to wastewater treatment plant design agreement (6.0 MGD) | $1.94 million |
| Tue, Oct 7 | CDBG/HUD funds: Maximum forgivable loan per business, Commercial Affordability Program | $75,000 |
| Tue, Oct 7 | Horrocks Engineers, LLC: Change order #2, transportation master plan and Spring Run layout review | — |
| Tue, Oct 7 | No vendor named: First amendment to the fiscal 2025-26 budget | — |
| Tue, Oct 7 | No vendor named: Sale of about 0.02 acre at $3.44 per square foot | — |
| Tue, Oct 7 | Zayo Group, LLC: Fiber franchise in public right-of-way | — |
| Tue, Oct 7 | SummitIG Fiber, LLC: Fiber franchise in public right-of-way | — |
| Tue, Sep 16 | Probuild Construction, Inc.: EMC Scarlet 009 4 million gallon water tank | — |
| Tue, Sep 16 | No vendor named: Sale of about 0.02 acre at $95,000 per acre ($2.18 per square foot); total not stated | — |
| Tue, Sep 2 | No vendor named: Pressure-reducing valve cost sharing, one third each by the city, DAI and Browns Meadow | — |
| Tue, Aug 19 | No vendor named: Requested reduced rezone fee (from $1,350) | $760 |
| Tue, Jul 15 | No vendor named: City disposal of 2.15 acres in exchange for 2.32 acres (Parcel A, Phase 4) | — |
| Tue, Jul 15 | SITLA and Ivory Homes: Disposal of up to 20.35 acres in a land exchange | — |
| Tue, Jul 15 | Zayo Group, LLC: Fiber franchise in public right-of-way | — |
| Tue, Jul 1 | VCBO: Change order #1, commercial and multifamily design standards update | — |
| Tue, Jul 1 | SITLA and Ivory Homes: Proposed land exchange for up to 20.35 acres of bypass road land | — |
| Tue, Jul 1 | Zayo Group, LLC: Fiber franchise in public right-of-way | — |
| Tue, Jun 17 | Advanced Engineering and Environmental Services, LLC: Change order #1, wastewater treatment plant upgrade (4.8 MGD) | $1.94 million |
| Tue, Jun 17 | No vendor named: Seventh amendment to the fiscal 2024-25 budget | — |
| Tue, Jun 17 | No vendor named: Fiscal 2025-26 budget | — |
| Tue, Jun 3 | No vendor named: Additional funding requested for the Christmas village tree | $15,000 |
| Tue, Jun 3 | BHI: Change order #1, temporary traffic signals | — |
| Tue, May 20 | No vendor named: Ranches Golf Club minor site plan fee, reduced from $4,000 after a request for $250 | $2,000 |
| Tue, May 20 | Granicus: Software and mobile app services renewal | — |
| Tue, May 20 | Monday.com and XTIVIA: Project management software | — |
| Tue, May 20 | Monte Vista Ranch, L.C.: 4 million gallon tank site and access easement | — |
| Tue, May 20 | Sustainable Real Estate Solutions, Inc.: C-PACE program administration (no city financial obligation) | — |
| Tue, May 6 | Civil Science: Change order #6, Old Airport Road Phase 3 design | $47,930 |
| Tue, May 6 | No vendor named: Added to the special events line for UTV flexibility | $20,000 |
| Tue, May 6 | Bike Utah with Shapeshift Terrain Parks: Off-Highway Trails Plan | — |
| Tue, May 6 | MHTN: Parks, Trails and Open Space Master Plan update | — |
| Tue, May 6 | No vendor named: Sixth amendment to the fiscal 2024-25 budget | — |
| Tue, Apr 15 | No vendor named: Small business grants | $150,000 |
| Tue, Apr 15 | No vendor named: LMI yard cleanup | $36,163 |
| Tue, Apr 15 | No vendor named: ADA ramp and crosswalk at Fiona Street and Airport Road | $20,000 |
| Tue, Apr 15 | No vendor named: LMI utility assistance | $15,000 |
| Tue, Apr 15 | Tabitha's Way Food Pantry: Food pantry (Tabitha's Way) | $7,292 |
| Tue, Apr 15 | No vendor named: LMI cemetery services assistance | $5,000 |
| Tue, Apr 15 | No vendor named: LMI back-to-school drive | $5,000 |
| Tue, Apr 15 | No vendor named: Senior assistance program | $3,000 |
| Tue, Apr 15 | No vendor named: Reduced master development plan amendment fee (from $3,350) | $1,350 |
| Tue, Apr 15 | West Coast Code Consultants (WC3): Change order #1 | — |
| Tue, Apr 1 | Jones & DeMille Engineering: Well #8 design, first amendment | — |
| Tue, Apr 1 | Horrocks Engineers: Change order #2, traffic signal design at Pony Express Parkway and Eagle Mountain Boulevard | — |
| Tue, Mar 18 | LRB Public Finance Advisors: Long-term debt financing options discussed | — |
| Tue, Mar 18 | Valley Crossroads Chamber of Commerce: ShopFest Utah event agreement | — |
| Tue, Mar 4 | The Retail Coach, LLC: Second amendment, economic development consulting | — |
| Tue, Mar 4 | Eagle Mountain Farmers Market, LLC: Farmers market management renewal | — |
| Tue, Feb 18 | Jackson Engineering (per backup email): Change order #2, Firefly 4 million gallon tank excavation and replacement of native soil | $189,986 |
| Tue, Feb 18 | Z D Cattle Company, Inc.: Goat grazing for vegetation management in open space | — |
| Tue, Feb 18 | No vendor named: Right-of-way, booster station site, easement and option on a 10-acre facilities site near Old Airport Road and Harmony Way | — |
| Tue, Feb 18 | No vendor named: Fifth amendment to the fiscal 2024-25 budget | — |
| Tue, Feb 4 | LRB Public Finance Advisors: Public finance advisory services | — |
| Tue, Feb 4 | No vendor named: Change order #2 for the Firefly 4 million gallon tank | — |
| Tue, Feb 4 | Ivory Homes and SITLA: 20.99 acres for a future civic campus at $350,166.75 per acre | — |
| Tue, Jan 21 | ThinkUtah: One-year lobbying services | $60,000 |
| Tue, Jan 21 | Home Depot: Home Depot materials grant for the military garden | $10,300 |
| Tue, Jan 21 | Ivory Homes and SITLA: 2.038 acres of right-of-way for Mid-Valley Road | — |
| Tue, Jan 21 | Ivory Homes and SITLA: 20.99 acres for a future civic campus at $350,166.75 per acre | — |
| Wed, Jan 8 | No vendor named: Right-of-way purchases for Pony Express (stated by a Lehi representative) | $6.00 million |
| Tue, Jan 7 | Ultimate Home Lending LLC: Mortgage Assistance Program | — |
| Tue, Dec 3 | Ivory Land Corporation: Old Airport Road North right-of-way purchase | — |
| Tue, Dec 3 | The Web Development Group: Website maintenance | — |
| Tue, Dec 3 | Psomas Engineering: Water utility master plan and impact fee facilities plan | — |
| Tue, Dec 3 | Horrocks Engineering: Storm water master plan | — |
| Tue, Dec 3 | JWO Engineering: Wastewater master plan | — |
| Tue, Dec 3 | Horrocks Engineering: Transportation master plan | — |
| Tue, Dec 3 | No vendor named: Fourth amendment to the FY2024-25 budget | — |
| Tue, Nov 19 | Rush Creek Properties, LLC: Right-of-way for the Mid Valley Road extension | — |
| Tue, Nov 19 | QTS: Non-standard transportation impact fee along Hyperscale Way | — |
| Wed, Nov 6 | Impact Signs: Six wayfinding signs | — |
| Tue, Oct 15 | No vendor named: Total city budget after third amendment | $156.0 million |
| Tue, Oct 15 | No vendor named: Affordable housing dollars collected by the redevelopment agency | $2.07 million |
| Tue, Oct 1 | No vendor named: Maximum forgivable down payment loan per qualified public employee (raised from $15,000 in the draft) | $25,000 |
| Tue, Oct 1 | GSBS Architects: General plan update professional services | — |
| Tue, Oct 1 | Mountainland Association of Governments: Mid Valley Road feasibility study interlocal agreement | — |
| Tue, Oct 1 | W.W. Clyde and Co.: Settlement and mutual release | — |
| Tue, Oct 1 | Kenneth A. Brown, Jr.: Hearing examiner legal services | — |
| Tue, Sep 17 | Impact Signs: Six wayfinding signs | — |
| Tue, Sep 17 | Utah Department of Transportation: Traffic signal at Old Airport Road and SR-73 | — |
| Tue, Sep 3 | No vendor named: Total city budget after amendment | $112.3 million |
| Tue, Sep 3 | No vendor named: General Fund increase for technology, plan-review software and administration | $108,903 |
| Tue, Sep 3 | Eagle Mountain Airport LLC: Old Airport Road right-of-way (amended) | — |
| Tue, Sep 3 | Meadowbrook Properties LP: Old Airport Road right-of-way | — |
| Tue, Sep 3 | Star West: Office lease amendment | — |
| Tue, Aug 20 | MHTN Architects: Downtown Master Plan consulting services | — |
| Tue, Aug 20 | Legislative Executive Consulting, LLC: Legislative lobbying services, extended to Aug. 31, 2026 | — |
| Tue, Aug 20 | Holbrook HGS LC: Old Airport Road right-of-way | — |
| Tue, Aug 20 | Holbrook Long Ridge LC: Old Airport Road right-of-way | — |
| Tue, Aug 20 | Les Olson: Managed print services | — |
| Tue, Aug 6 | Utah Division of Wildlife Resources: Wildlife migration corridor fencing reimbursement, fiscal 2025 | — |
| Tue, Aug 6 | Utah County: Funding for Airport Road, Pony Express Parkway to SR-73 | — |
| Tue, Aug 6 | S&L Inc.: Smith Ranch Community Park change order #2 | — |
| Tue, Aug 6 | Big T Recreation: Smith Ranch Community Park change order #2 | — |
| Tue, Aug 6 | Adobe: Adobe Value Incentive Plan, three-year term | — |
| Tue, Jul 16 | Web Development Group: Total website contract including innovation budget | $135,000 |
| Tue, Jul 16 | Web Development Group: Website services change order #1 using the innovation buffer hours | — |
| Wed, Jul 10 | Colin Baenziger and Associates: City manager recruitment | — |
| Tue, Jul 2 | No vendor named: Mayor pay, primary-income option, per year, effective Jan. 1, 2025 | $119,800 |
| Tue, Jul 2 | No vendor named: Mayor pay, secondary-income option, per year | $30,470 |
| Tue, Jul 2 | No vendor named: Council member pay, per year, effective Jan. 1, 2025 | $18,100 |
| Tue, Jul 2 | REDKOR Brand Campaigns: Marketing plan, per month, month-to-month, not to exceed 14 months | $3,500 |
| Tue, Jul 2 | No vendor named: Mayor monthly transportation allowance | $600 |
| Tue, Jul 2 | Identity Signs: Six wayfinding signs | — |
| Tue, Jul 2 | Psomas: General plan update: future land use map and water use element | — |
| Tue, Jun 18 | Perry Land Investments, LLC: Old Airport Road right-of-way amendment | — |
| Tue, Jun 4 | Pony Express Events: Rodeo grounds operation and lease agreement amendment | — |
| Tue, Jun 4 | OnPointe Insights, Inc.: Public engagement surveys for the general plan update | — |
| Tue, May 21 | No vendor named: Allocation to offset future debt service in the capital projects fund | $65.0 million |
| Tue, May 21 | No vendor named: Target budget for combined city hall and library (about) | $30.0 million |
| Tue, May 21 | No vendor named: Recreation center funding moved to Unallocated Funds | $2.60 million |
| Tue, May 21 | No vendor named: Combined park fund: Silver Lake Amphitheater, bike park and Nolen Park | $1.00 million |
| Tue, May 21 | No vendor named: Capital projects fund reduction from removing monument signs and a community art piece | $220,000 |
| Tue, May 21 | Timpanogos Special Service District: Monthly cost increase from Timpanogos Special Service District rate changes | $67,115 |
| Tue, May 21 | No vendor named: Net General Fund increase | $38,500 |
| Tue, May 21 | No vendor named: Mini loader lease, three years | $15,000 |
| Tue, May 21 | No vendor named: Projected annual school tax per household in 2025 (falls to $88.34 by 2029) | $296 |
| Tue, May 21 | No vendor named: Merged City Center streetscape and medians line | — |
| Tue, May 21 | Holbrook HGS LC: Old Airport Road right-of-way | — |
| Tue, May 21 | Holbrook Long Ridge LC: Old Airport Road right-of-way | — |
| Tue, May 14 | No vendor named: Wages and benefits for 14 new positions | $930,413 |
| Tue, May 14 | No vendor named: Market and pay band midpoint adjustments (about) | $300,000 |
| Tue, May 14 | No vendor named: Public art | $100,000 |
| Tue, May 14 | No vendor named: Bike park improvement | $50,000 |
| Tue, May 14 | No vendor named: Financial software item | $15,000 |
| Tue, May 7 | No vendor named: Tentative fiscal 2024-25 budget | $112.5 million |
| Tue, May 7 | No vendor named: Water fund materials and supplies | $7.27 million |
| Tue, May 7 | No vendor named: Water fund personnel costs | $1.39 million |
| Tue, May 7 | No vendor named: Anticipated CDBG funds (about) | $250,000 |
| Tue, May 7 | No vendor named: Senior center bus (about) | $120,000 |
| Tue, May 7 | No vendor named: Downtown Master Plan request for proposals (estimated) | $50,000 |
| Tue, May 7 | No vendor named: Utility assistance program (about) | $44,000 |
| Tue, May 7 | D&B Cedar LLC: Old Airport Road right-of-way amendment | — |
| Tue, May 7 | Dragon Dynamite Displays: Fireworks display | — |
| Mon, Apr 29 | No vendor named: Potential school district bond discussed (not voted on) | $200.0 million |
| Mon, Apr 29 | MGT Consulting: Feasibility study on dividing the Alpine School District | — |
| Tue, Apr 16 | Perry Land Investments LLC: Old Airport Road right-of-way amendment | — |
| Tue, Apr 16 | Steven George Smith: Old Airport Road right-of-way | — |
| Tue, Apr 16 | Codale Electric: Rodeo arena lights change order #1 | — |
| Tue, Apr 2 | Brown's Amusements, Inc.: Carnival services addendum for Pony Express Days | — |
| Tue, Mar 26 | No vendor named: Recruitment consultants for city administrator search | — |
| Tue, Mar 19 | No vendor named: Diesel fuel storage tank for city well generators | $110,000 |
| Tue, Mar 19 | No vendor named: Net increase in budget amendment #4 | $57,636 |
| Tue, Mar 19 | No vendor named: Moved from hotel study to Mountainland Association of Governments growth study | $25,000 |
| Tue, Mar 19 | D&B Cedars LLC: Old Airport Road right-of-way | — |
| Tue, Mar 19 | Civil Science: Old Airport Road design change order #5 | — |
| Wed, Mar 6 | No vendor named: State appropriation for Cedar Valley Highway corridor preservation | $60.0 million |
| Wed, Mar 6 | LRB Public Finance Advisors: Total growth-related transportation construction cost in the impact fee analysis | $46.5 million |
| Wed, Mar 6 | No vendor named: Community Development Block Grant budget | $200,000 |
| Wed, Mar 6 | The Days of '47 Rodeo, Salt Lake Inc.: Used rodeo arena equipment | $62,500 |
| Wed, Mar 6 | Jason Walker and David Kitchen (recruitment consultants named in agenda): Recruitment consultants for city administrator search | — |
| Wed, Mar 6 | LSC Real Estate: Right-of-way purchase | — |
| Tue, Feb 20 | Property Reserve, Inc. (The Church of Jesus Christ of Latter-day Saints): Old Airport Road right-of-way | — |
| Tue, Feb 20 | Oquirrh Wood Ranch: Firefly water purchase agreement amendment | — |
| Tue, Feb 20 | VanCon, Inc.: Booster pumps change order #1 | — |
| Tue, Feb 20 | VanCon, Inc.: Wastewater headworks change order #4 | — |
| Tue, Feb 20 | CXT: Smith Ranch CXT restroom change order #2 | — |
| Tue, Feb 6 | No vendor named: Budgeted for 2024 for the signal upgrade | $17,000 |
| Tue, Feb 6 | Direct Communications: Upgrade per traffic signal box (about); 15 boxes | $1,500 |
| Tue, Feb 6 | Eagle Mountain Airport LLC: Old Airport Road right-of-way | — |
| Tue, Feb 6 | Perry Land Investments LLC: Old Airport Road right-of-way | — |
| Tue, Feb 6 | Zions Public Finance, Inc.: Public safety impact fee facilities plan and analysis | — |
| Tue, Jan 16 | Brightview: Settlement of amount owed | — |
| Tue, Jan 2 | No vendor named: Budget amendment #3 total | $325,380 |
| Tue, Jan 2 | No vendor named: Branding implementation | $166,985 |
| Tue, Jan 2 | Web Development Group: Website redesign | $135,000 |
| Tue, Jan 2 | No vendor named: Truck for the forester | $68,000 |
| Tue, Jan 2 | No vendor named: Forester personnel, partial year | $55,895 |
| Tue, Jan 2 | Comcast: Park fee in lieu from Comcast | $40,000 |
| Tue, Jan 2 | Retail Coach: Retail Coach renewal | $30,000 |
| Tue, Jan 2 | Retail Coach: Retail Coach annual renewal | $30,000 |
| Tue, Jan 2 | No vendor named: Forester equipment | $4,500 |
| Tue, Dec 5 | No vendor named: Fiscal 2023 project rollovers | $1.62 million |
| Tue, Dec 5 | No vendor named: One-time fiscal 2024 requests | $554,574 |
| Tue, Dec 5 | No vendor named: Operational increases | $287,580 |
| Tue, Dec 5 | No vendor named: Branding implementation (removed, to return in January) | $166,985 |
| Tue, Dec 5 | Comcast: Park fee in lieu proposed from Comcast | $30,000 |
| Tue, Dec 5 | No vendor named: Smith Ranch change orders | $25,000 |
| Tue, Nov 7 | White Hills Water Company Inc.: White Hills well upgrade agreement | — |
| Tue, Nov 7 | White Hills Water Company Inc.: Water tank reimbursement agreement | — |
| Tue, Oct 17 | Cartegraph: Asset management software services (Cartegraph through OpenGov) | — |
| Tue, Oct 17 | Oquirrh Wood Ranch, LLC: White Hills Well upgrade agreement | — |
| Tue, Oct 17 | Oquirrh Wood Ranch, LLC: Water tank reimbursement agreement | — |
| Tue, Oct 3 | ESRI: GIS subscription | — |
| Tue, Oct 3 | Sunset Mountain Machinery: Sunset Flats subdivision improvement punch list | — |
| Tue, Oct 3 | Bowen Collins and Associates: Water Reuse Plan update | — |
| Tue, Oct 3 | Grimshaw Drilling LLC: Well 8 drilling change order #2 | — |
| Tue, Sep 19 | No vendor named: Amended fiscal 2023-24 total budget | $540.5 million |
| Tue, Sep 19 | No vendor named: Fiscal 2023 project appropriations | $40.1 million |
| Tue, Sep 19 | No vendor named: New fiscal 2024 items | $408,000 |
| Tue, Sep 19 | No vendor named: Increase to fiscal 2023 projects | $75,100 |
| Tue, Sep 19 | Utah Division of Wildlife Resources: Cap on yearly city cost in years 2-5 of wildlife migration fence agreement (or 20% of grant, whichever is less) | $32,000 |
| Tue, Sep 19 | VanCon, Inc.: Wastewater treatment plant headworks change order #3 | — |
| Tue, Sep 19 | Wheeler Machinery: Caterpillar 926M loader | — |
| Tue, Sep 19 | OpenGov: OpenGov permitting and licensing software | — |
| Tue, Aug 15 | Ken Garff Ford: 2024 Ford F-250 truck | — |
| Tue, Aug 15 | Legislative Executive Consulting, LLC: Lobbyist services | — |
| Tue, Jul 18 | No vendor named: Expected annual city revenue from incremental property tax once the first six buildings are triggered (agenda estimate) | $140,000 |
| Tue, Jul 18 | Sunrise Engineering: 2 MG water tank design | — |
| Tue, Jul 18 | Jones and DeMille Engineering: Well 5 upgrade design | — |
| Tue, Jul 18 | Geneva Rock: 2023 Pony Express paving project change order #1 | — |
| Tue, Jul 18 | Paul Jerome: City administrator services agreement | — |
| Tue, Jun 20 | Paul Jerome: City administrator services agreement | — |
| Tue, Jun 20 | BCP Development: Well 8 property purchase, Parkway Fields | — |
| Tue, Jun 20 | Central Utah Water Conservancy District: Water supply agreement | — |
| Tue, Jun 20 | JWO Engineering: Tertiary treatment and algae control design | — |
| Tue, Jun 20 | Grimshaw Drilling LLC: Well 8 drilling change order #1 | — |
| Tue, Jun 6 | No vendor named: Performance wage placeholder increase from 3% to 6% | $300,000 |
| Tue, Jun 6 | No vendor named: Homeless shelter contribution, maximum | $275,000 |
| Tue, Jun 6 | No vendor named: Current homeless shelter contribution (about) | $112,000 |
| Tue, Jun 6 | No vendor named: Full-time executive assistant including benefits (about) | $90,000 |
| Tue, Jun 6 | Newman Construction: Walden Park road extension | — |
| Tue, May 16 | Morgan Pavement: 2023 spray applied seal coat project | — |
| Tue, May 16 | Spohn Ranch Inc.: Smith Ranch Park skatepark | — |
| Tue, May 16 | CXT Inc.: Smith Ranch Park restroom | — |
| Tue, May 16 | Eagle Mountain Chamber of Commerce: Ladder sign concession agreement amendment | — |
| Tue, May 2 | REDKOR Brands, LLC: Comprehensive marketing plan | — |
| Tue, May 2 | Oak Hollow Electric Company: Intersection improvements project | — |
| Tue, Mar 21 | No vendor named: Eagle Mountain roundabout portions, single bid received | $2.50 million |
| Tue, Mar 21 | No vendor named: Major Street signal, single bid received | $540,000 |
| Tue, Mar 21 | No vendor named: Utility turn-on fee | $50 |
| Tue, Mar 21 | Utah County: Election cost per ballot, cap | $2 |
| Tue, Mar 21 | Grimshaw Drilling: Well 7 drilling | — |
| Tue, Mar 7 | No vendor named: Smith Ranch Community Park skatepark grant request | $200,000 |
| Tue, Mar 7 | No vendor named: Cost to turn on a well | $9,000 |
| Tue, Mar 7 | State of Utah: American Rescue Plan Act funds agreement | — |
| Tue, Mar 7 | VanCon, Inc.: Wastewater treatment plant headworks, change order 1 | — |
| Tue, Feb 21 | No vendor named: Small area plan, Commercial Core, downtown redevelopment services | — |
| Tue, Feb 21 | No vendor named: Small area plan, Gateway Park, downtown redevelopment services | — |
| Tue, Feb 21 | No vendor named: Small area plan, Mid-Valley/Downtown, downtown redevelopment services | — |
| Tue, Feb 7 | Eagle Mountain Chamber of Commerce: Amended ladder sign concession agreement | — |
| Tue, Feb 7 | Wasatch Heating and Air: Well house HVAC design and installation | — |
| Tue, Jan 17 | No vendor named: Fee in lieu of additional open space and amenity points | $18,308 |
| Tue, Jan 3 | The Retail Coach: Retail strategy development and recruitment services | — |
| Tue, Jan 3 | Horrocks Engineers: Transportation master plan drafting, change order 2 | — |
| Tue, Dec 6 | No vendor named: Total budget after amendment | $160.6 million |
| Tue, Dec 6 | No vendor named: Matching grant for tertiary effluent treatment | $1.00 million |
| Tue, Dec 6 | No vendor named: Sewer fund request including headworks and taxes on 40-acre land purchase | $234,828 |
| Tue, Dec 6 | No vendor named: General fund increase | $140,149 |
| Tue, Dec 6 | No vendor named: Aqua Engineering change order 5 added to budget | $92,192 |
| Tue, Dec 6 | Aqua Engineering: Wastewater treatment plant expansion change order 5, not to exceed | $92,192 |
| Tue, Nov 15 | Galloway: Master facilities plan consulting services | $44,000 |
| Tue, Nov 15 | No vendor named: Accrued taxes on open space dedication, waiver requested | $9,580 |
| Tue, Nov 15 | Cohne Kinghorn: Civil legal services | — |
| Tue, Nov 15 | Ken Garff Ford: Three 2023 Ford F-250s and one F-350 | — |
| Tue, Nov 1 | No vendor named: City funds managed by Moreton Asset Management (about) | $43.0 million |
| Tue, Nov 1 | No vendor named: Investment yield | $778,200 |
| Tue, Nov 1 | CrossTek: Wildlife crossing detection system | — |
| Tue, Nov 1 | MHTN Architects: Smith Ranch Community Park design services, change order 2 | — |
| Tue, Oct 18 | Aqua Engineering: Wastewater treatment plant change order 5 | $23,048 |
| Tue, Oct 4 | No vendor named: First amendment to fiscal year 2022-2023 budget, total | $60.5 million |
| Tue, Oct 4 | No vendor named: New spending not previously approved | $343,220 |
| Tue, Oct 4 | No vendor named: Wride Highway deer crossing detection system | $250,000 |
| Tue, Oct 4 | No vendor named: Observatory park grant from Meta to the University of Utah | $121,000 |
| Tue, Oct 4 | No vendor named: Two part-time utility billing clerk positions at $27,050 each | $54,100 |
| Tue, Oct 4 | No vendor named: Stormwater impact fee facilities plan update | $39,120 |
| Tue, Sep 20 | No vendor named: Transportation master plan, total project cost | $1224.2 million |
| Tue, Sep 20 | No vendor named: Transportation master plan, estimated city share | $558.0 million |
| Tue, Sep 20 | No vendor named: Old Airport Road funding award | $4.00 million |
| Tue, Sep 20 | No vendor named: Estimated developer cost of wildlife corridor fencing | $2.00 million |
| Tue, Sep 20 | Nationwide Shelving: Community Development building shop mezzanine | — |
| Tue, Sep 20 | CRS Engineers: Eagle Mountain Boulevard widening design, change order 1 | — |
| Tue, Sep 6 | No vendor named: Water impact fee per ERU with water rights, plus reimbursement fees | $4,283 |
| Tue, Sep 6 | No vendor named: Water impact fee per ERU without water rights, plus CWP and reimbursement fees | $2,445 |
| Tue, Sep 6 | Ken Garff Ford: Nine 2023 Ford F-150 trucks and one Transit van | — |
| Tue, Sep 6 | JWO Engineering: Storm drain impact fee facilities plan update | — |
| Tue, Sep 6 | Jones and DeMille: Well 8 design | — |
| Tue, Sep 6 | Grimshaw Drilling: Well 8 drilling | — |
| Tue, Sep 6 | WW Clyde: Eagle Mountain Boulevard widening, change order 1 | — |
| Tue, Sep 6 | Aqua Engineering: Wastewater treatment plant, change order 4 (half payment for unrequested work) | — |
| Tue, Aug 16 | Kenny Seng Construction: Cory B. Wride Memorial Park Phase 2, change order 5 | $5,000 |
| Tue, Aug 16 | Rhino Pumps LLC: White Hills well test pumping | — |
| Tue, Jul 19 | Stadion, LLC: Meta reimbursement to the city for water infrastructure, road improvements and staffing help | $1.80 million |
| Tue, Jul 19 | Legislative Executive Consulting, LLC: Lobbyist services, month to month | — |
| Tue, Jul 19 | VanCon, Inc.: Well 7 site preparation, change order 1 | — |
| Tue, Jul 5 | No vendor named: Proposed water impact fee per ERU with local water rights, plus reimbursement fees | $4,054 |
| Tue, Jul 5 | No vendor named: Proposed water impact fee per ERU without water rights, plus CWP and reimbursement fees | $2,284 |
| Tue, Jul 5 | VanCon, Inc.: Wastewater treatment plant headworks facility | — |
| Tue, Jul 5 | Kenny Seng Construction: Pony Express Parkway widening Phase 5, change order 1 | — |
| Tue, Jul 5 | TruCo Services, Inc.: Landscape and maintenance agreement | — |
| Tue, Jul 5 | Project Engineering Consultants: Eagle Mountain Boulevard materials testing | — |
| Tue, Jul 5 | Workspace Elements: Leased office workstation furniture | — |
| Tue, Jun 21 | No vendor named: Fiscal year 2022-2023 budget total | $122.3 million |
| Tue, Jun 21 | No vendor named: Placeholder for developer streetlight overpayment reimbursement | $600,000 |
| Tue, Jun 21 | No vendor named: 2022 sales tax bond issuance costs | $146,500 |
| Tue, Jun 21 | Rock Solid Technologies, Inc.: Digital 311 service platform | — |
| Tue, Jun 21 | Bowen Collins and Associates: 2021 White Hills well upgrades, change order 2 | — |
| Tue, Jun 7 | No vendor named: Well-house air conditioning retrofits | $250,000 |
| Tue, Jun 7 | No vendor named: Treatment plant design | $100,000 |
| Tue, Jun 7 | No vendor named: 13-acre land disposal | $65,000 |
| Tue, Jun 7 | No vendor named: Electronics for new hires | $50,000 |
| Tue, Jun 7 | No vendor named: Technology infrastructure | $50,000 |
| Tue, Jun 7 | No vendor named: Sewer assessment tool access | $46,200 |
| Tue, Jun 7 | No vendor named: Wildlife and environmental projects (planning) | $34,000 |
| Tue, Jun 7 | No vendor named: Finance training and professional services | $2,000 |
| Tue, Jun 7 | No vendor named: Northern Utah Animal Shelter share | $1,284 |
| Tue, Jun 7 | Starwest Eagle Mountain Properties, LLC: Commercial lease | — |
| Tue, Jun 7 | Precision Manholes: Concrete collar replacement | — |
| Tue, Jun 7 | VanCon, Inc.: Cory B. Wride Memorial Park and Pony Express booster pumps | — |
| Tue, Jun 7 | Kenny Seng Construction: Cory B. Wride Memorial Park Phase 2, change order 4 | — |
| Tue, Jun 7 | No vendor named: Tipping fees, reduced from 4,745 to 3,000 tons | $-28,000 |
| Tue, May 24 | No vendor named: Sewer treatment plant headworks project, proposed increase from $2,000,000 | $3.00 million |
| Tue, May 24 | No vendor named: Citizen response management software, initial cost | $30,500 |
| Tue, May 24 | No vendor named: Citizen response management software, approximate annual fee, five-year term | $21,000 |
| Tue, May 17 | WW Clyde: Eagle Mountain Boulevard widening, revised contract (was $9,034,844.75) | $9.08 million |
| Tue, May 17 | No vendor named: Ranches Parkway/High T intersection and Stonebridge Lane signal | $2.00 million |
| Tue, May 17 | No vendor named: Three patrol deputies | $526,684 |
| Tue, May 17 | No vendor named: Sheriff contract increase | $140,697 |
| Tue, May 17 | No vendor named: Lone Tree to Old Airport Road design | $125,000 |
| Tue, May 17 | No vendor named: Facilities master plan | $20,000 |
| Tue, May 17 | No vendor named: Crossing at Mountain Trails Elementary | $7,186 |
| Tue, May 17 | No vendor named: Hydrant deposit as approved | $1,000 |
| Tue, May 17 | No vendor named: Major arterial road closure, per day per lane per 1,000 feet | $1,000 |
| Tue, May 17 | No vendor named: Minor arterial road closure, per day per lane per 1,000 feet | $500 |
| Tue, May 17 | No vendor named: Collector road closure, per day per lane per 1,000 feet | $250 |
| Tue, May 17 | Bird Rides: Per-ride quarterly administrative fee | $0 |
| Tue, May 17 | No vendor named: Decrease from removing content marketing writer position | $-70,183 |
| Thu, May 12 | No vendor named: Unallocated general fund money intended for community center and library, on hold | $10.8 million |
| Thu, May 12 | No vendor named: Long-term facilities plan consultant, placeholder of $15,000 to $20,000 | — |
| Tue, May 3 | Mountain Valley Construction: City Hall roof replacement | — |
| Tue, May 3 | WW Clyde: Eagle Mountain Boulevard change order 1 | — |
| Tue, Apr 19 | No vendor named: Sales tax revenue bonds, Series 2022 (maximum) | $25.0 million |
| Tue, Apr 19 | No vendor named: Additional funding needed for Unity Pass culinary well | $3.00 million |
| Tue, Apr 19 | No vendor named: Unity Pass culinary well allocation, to roll over | $2.00 million |
| Tue, Apr 12 | No vendor named: Additional funding needed for community development yard paving | $1.20 million |
| Tue, Apr 12 | No vendor named: City center streetscape installation (previously approved) | $792,991 |
| Tue, Apr 12 | No vendor named: Paving the community development yard (approved in 2022) | $600,000 |
| Tue, Apr 12 | No vendor named: City center median landscaping (requested) | $500,000 |
| Tue, Apr 12 | No vendor named: Petroglyph and burial-site fencing | $7,500 |
| Tue, Apr 5 | Nickerson Inc.: Well 7 pumps | — |
| Tue, Apr 5 | Royal Wholesale Electric: Well 7 booster pump and Cory Wride Memorial Park reuse pump station electrical | — |
| Tue, Apr 5 | M&M Asphalt Services: Slurry seal | — |
| Tue, Apr 5 | Civil Science, LLC: Mid Valley Road design | — |
| Tue, Mar 22 | No vendor named: Sheriff department requested 4% budget increase for fuel and other expenses | — |
| Tue, Mar 22 | No vendor named: 3% wage adjustment placeholder | — |
| Tue, Mar 15 | No vendor named: Sales tax revenue bonds, not to exceed | $25.0 million |
| Tue, Mar 15 | No vendor named: Eagle Mountain Boulevard (estimate) | $9.00 million |
| Tue, Mar 15 | No vendor named: Old Airport Road Phase 2 (estimate) | $9.00 million |
| Tue, Mar 15 | No vendor named: Expected from the Mountainland Association of Governments in 2024 or 2025 | $7.00 million |
| Tue, Mar 15 | No vendor named: Mid Valley Road Phase 2 (estimate) | $4.00 million |
| Tue, Mar 15 | No vendor named: Carryover, Cory B. Wride Memorial Park | $1.50 million |
| Tue, Mar 15 | No vendor named: Cedar Pass Ranch water line replacement (estimate) | $1.00 million |
| Tue, Mar 15 | No vendor named: Carryover, Lone Tree/Pony Express and Eagle Mountain Boulevard/Aviator Avenue traffic signals | $130,000 |
| Tue, Mar 15 | No vendor named: Emergency Tank 5 repair | $38,940 |
| Tue, Mar 15 | No vendor named: Elections, higher ballot costs | $37,000 |
| Tue, Mar 15 | No vendor named: Streets air compressor and concrete breaker | $35,532 |
| Tue, Mar 15 | No vendor named: Streets grader lease-purchase | $27,000 |
| Tue, Mar 15 | No vendor named: Pioneer Park disc golf course | $25,000 |
| Tue, Mar 15 | No vendor named: Arrival detention basin improvements | $20,000 |
| Tue, Mar 15 | No vendor named: Building department service analysis | $4,700 |
| Tue, Mar 15 | No vendor named: SeamlessDocs six-month extension | $4,407 |
| Tue, Mar 15 | No vendor named: HR compensation consulting | $3,500 |
| Tue, Mar 15 | Jennifer Corrington (Vintage Lily Farms): Farmers market management | — |
| Tue, Mar 15 | Boart Longyear Drilling: Well 7 drilling | — |
| Tue, Mar 15 | VanCon, Inc.: Well 7 site preparation package | — |
| Tue, Mar 15 | WW Clyde: Eagle Mountain Boulevard widening materials | — |
| Tue, Mar 1 | No vendor named: Fees the applicant said would be lost (applicant estimate) | $250,000 |
| Tue, Mar 1 | No vendor named: Sewer rate per month, general user (all residents, combined service areas) | $46 |
| Tue, Mar 1 | No vendor named: Sewer rate per month per equivalent residential unit, industrial users | $32 |
| Tue, Mar 1 | No vendor named: Stormwater fee per equivalent residential unit, up from $5.00 | $8 |
| Tue, Mar 1 | Innovative Contracting and Engineering: Independent cost estimating for Eagle Mountain Boulevard widening | — |
| Tue, Mar 1 | Brightview Landscape Services Inc.: Landscape and maintenance services | — |
| Tue, Mar 1 | Widdison Turbine Services: White Hills well test pumping | — |
| Tue, Mar 1 | Jones and DeMille: New well design change order 2 | — |
| Tue, Feb 15 | No vendor named: Sales tax revenue bonds, not to exceed, for road, water and sewer improvements | $25.0 million |
| Tue, Feb 15 | No vendor named: Estimated cost of Eagle Mountain Boulevard widening, signal, lanes and trunk line projects | $16.0 million |
| Tue, Feb 15 | WW Clyde: Eagle Mountain Boulevard widening pre-construction | — |
| Tue, Feb 1 | No vendor named: High estimate of annual in-house IT department cost | $274,190 |
| Tue, Feb 1 | No vendor named: Low estimate of annual in-house IT department cost | $196,435 |
| Tue, Feb 1 | Zions Public Finance: Economic Development Master Plan update | $29,900 |
| Tue, Feb 1 | B Logic Construction: Winter conditions provision, applies only if weather requires it | $25,000 |
| Tue, Feb 1 | LYRB: Affordable Housing Plan | $14,880 |
| Tue, Feb 1 | No vendor named: Proposed stormwater fee per equivalent residential unit, up from $5.00 | $8 |
| Tue, Feb 1 | No vendor named: Base water rate increase under both options | $6 |
| Tue, Feb 1 | Superior Asphalt: 2022 crack seal project | — |
| Tue, Feb 1 | B Logic Construction: 2021 Community Development Building yard improvement (steel parking structure) | — |
| Tue, Jan 18 | RH Borden: 3D manhole scanning and virtualization, 1,100 manholes | $99,550 |
| Tue, Jan 18 | Hydro International: Headworks grit classifier price increase | $18,001 |
| Tue, Jan 18 | Hydro International: Added tray for grit classifier | $7,890 |
| Tue, Jan 18 | Momentum Recycling: Glass recycling dumpster, first year | $7,383 |
| Tue, Jan 18 | Momentum Recycling: Annual cost after the first year | $3,600 |
| Tue, Jan 18 | CRS Engineers: Eagle Mountain Boulevard widening design, two to five lanes | — |
| Tue, Dec 7 | No vendor named: 12,000 sq ft concrete skate park (estimate) | $926,000 |
| Tue, Dec 7 | No vendor named: City Administrator annual salary under the first addendum | $150,000 |
| Tue, Dec 7 | No vendor named: City purchase of a one- to two-acre well site, per acre | $130,000 |
| Tue, Dec 7 | MHTN Architects: Smith Ranch Community Park design services change order 1 (skate park design) | — |
| Tue, Dec 7 | Hydro International: Grit classifier for the new headworks building | — |
| Tue, Dec 7 | Huber Technologies: Grit classifier/washer and screening equipment | — |
| Tue, Dec 7 | Jones and DeMille: New well design change order 1 | — |
| Tue, Dec 7 | Bowen Collins: White Hills well upgrade change order 1 | — |
| Tue, Nov 16 | Prime Solution, Inc.: Two biosolids fan presses ($79,103 each) | $158,206 |
| Tue, Nov 16 | Kenny Seng Construction: Cory B. Wride Memorial Park Phase 2 change order 3 (about 5% over initial budget) | — |
| Tue, Oct 5 | No vendor named: General fund: emergency coordinator, sprinkler repairs, IT service desk | $118,169 |
| Tue, Oct 5 | No vendor named: Estimate for an in-house IT specialist with benefits (comparison) | $80,000 |
| Tue, Oct 5 | No vendor named: Pony Express Memorial Park dog park | $30,000 |
| Tue, Oct 5 | No vendor named: State funding for Communities That Care | $13,100 |
| Tue, Oct 5 | Executech: Executech IT helpdesk: estimated monthly overage over six months | $2,000 |
| Tue, Oct 5 | Civil Science: Airport Road design change order 3 | — |
| Tue, Oct 5 | Horrocks Engineers: Pony Express widening design change order 6 | — |
| Tue, Oct 5 | FX Construction: Wastewater plant expansion change order 4 | — |
| Tue, Sep 21 | B Jackson Construction: Lone Tree traffic signal change order 1 | — |
| Tue, Sep 7 | No vendor named: Total estimated cost of all park phases (staff range $5.8 to $5.9 million) | $5.85 million |
| Tue, Sep 7 | No vendor named: Allocated for the first phase | $1.00 million |
| Tue, Sep 7 | No vendor named: 12,000 sq ft concrete skate park (estimate) | $926,000 |
| Tue, Sep 7 | No vendor named: Four pickleball courts without lighting (estimate) | $173,000 |
| Tue, Sep 7 | No vendor named: Fencing for a dog park on the east side of Pony Express Regional Park (bid) | $20,000 |
| Tue, Sep 7 | Jones and DeMille: 2021 new well design | — |
| Tue, Aug 24 | Bowen Collins and Associates: White Hills well upgrade design services | — |
| Tue, Aug 24 | B Jackson Engineering: Bobby Wren traffic signal installation | — |
| Tue, Aug 24 | Premier Truck Group: Three 2022 Freightliner cab and chassis | — |
| Tue, Aug 24 | Ken Garff Ford: Two 2022 Ford F-350 trucks | — |
| Tue, Aug 3 | Farm Land Holding, LLC: Real estate purchase agreement; staff authorized to continue negotiating | — |
| Tue, Jul 20 | No vendor named: Total of the amendment | $5.54 million |
| Tue, Jul 20 | No vendor named: Drill Well 7 | $2.00 million |
| Tue, Jul 20 | No vendor named: Four-million-gallon water tank in Pole Canyon | $2.00 million |
| Tue, Jul 20 | No vendor named: Well 1 relocation | $1.50 million |
| Tue, Jul 20 | No vendor named: Summer Bash and laser show | $25,000 |
| Tue, Jul 20 | No vendor named: Library grant | $12,000 |
| Tue, Jul 20 | No vendor named: iWorkQ software | $2,250 |
| Tue, Jul 6 | No vendor named: Sale of 1.5 acres of city land to the Hidden Hollow Phase C applicant | $300,000 |
| Tue, Jul 6 | No vendor named: Reimbursement of one-half of fees paid by the applicant | $4,405 |
| Tue, Jul 6 | No vendor named: Landscaping escrow, refundable on completion by Oct. 30, 2021 | $2,000 |
| Tue, Jul 6 | Stratton and Bratt: SilverLake Woodhaven Community Park change order 1 | — |
| Tue, Jun 15 | No vendor named: Company investment in initial data center build (stated by staff) | $600.0 million |
| Tue, Jun 15 | No vendor named: Total estimated police facility cost in the plan | $11.1 million |
| Tue, Jun 15 | No vendor named: Road damage amount the city may request from the company | $3.00 million |
| Tue, Jun 15 | No vendor named: Property tax revenue, fiscal 2021-2022 (last year about $1.7 million) | $1.90 million |
| Tue, Jun 15 | No vendor named: Annual continuing education reimbursement cap per employee, raised from $1,500 | $2,500 |
| Tue, Jun 15 | No vendor named: Police impact fee per 1,000 sq ft nonresidential | $145 |
| Tue, Jun 15 | No vendor named: Police impact fee per residential unit | $42 |
| Tue, Jun 15 | No vendor named: Sale of 1.5-acre city parcel to the Hidden Hollow Phase C applicant at appraised value | — |
| Tue, Jun 15 | Morgan Pavement: 2021 spray-applied seal coat project | — |
| Tue, Jun 1 | No vendor named: Tentative fiscal 2021-2022 budget | $44.8 million |
| Tue, Jun 1 | B Logic Construction: 2021 Yard Improvement truck garage structure | — |
| Thu, May 27 | No vendor named: Additional funds freed by a 27.5% rather than 35% reserve (estimate) | $3.00 million |
| Thu, May 27 | No vendor named: Utah County share of paving Wasatch Wing and Clay Road (estimate) | $612,000 |
| Thu, May 27 | No vendor named: City share of paving Wasatch Wing and Clay Road (estimate) | $250,000 |
| Tue, May 18 | No vendor named: Share of police facility cost attributable to the impact fee | $820,971 |
| Tue, May 18 | No vendor named: Subsequent illegal dumping violations | $1,000 |
| Tue, May 18 | No vendor named: First illegal dumping violation | $250 |
| Tue, May 18 | No vendor named: Business violation fee | $100 |
| Tue, May 18 | No vendor named: Business license inspection fee | $50 |
| Tue, May 18 | Geneva Rock: Airport Road Phase 1 | — |
| Tue, May 18 | Geneva Rock: 2021 Eagle Mountain micro surface project | — |
| Tue, May 18 | Rush Truck Center: Replacement vehicle with upgrades after transit damage | — |
| Tue, May 4 | No vendor named: Tentative fiscal 2021-2022 budget, all funds (capital projects fund undetermined) | $44.8 million |
| Tue, May 4 | No vendor named: Enterprise funds | $21.9 million |
| Tue, May 4 | No vendor named: General fund | $20.8 million |
| Tue, May 4 | No vendor named: Cash escrow per lot for the 3.26-acre medium park, held until completion | $3,750 |
| Tue, May 4 | Landmark Excavating: Aviator traffic signal change order 1 | — |
| Tue, May 4 | FX Construction: Wastewater treatment plant expansion change order 3 | — |
| Tue, Apr 20 | MotivHealth: Employee assistance program rate increase, about $400 per month total | $400 |
| Tue, Apr 20 | Kenny Seng: Cory B. Wride Memorial Park Phase 2 change order 2 | — |
| Tue, Apr 6 | No vendor named: Cash bond held for the Silverlake South neighborhood park | $1.70 million |
| Tue, Apr 6 | No vendor named: Additional escrow if plats 28, 29 and 30 are recorded | $600,000 |
| Tue, Apr 6 | No vendor named: City Hall lobby display | — |
| Tue, Apr 6 | No vendor named: Council chambers lectern and on-screen timer | — |
| Tue, Apr 6 | PEPG Consulting: Construction management and inspection, Pony Express Phase 5 widening | — |
| Tue, Apr 6 | Probuild: Facebook water tank change order 2 | — |
| Tue, Apr 6 | Psomas: Water model rebuild change order 2 | — |
| Tue, Apr 6 | Accela: Accela software agreement change order 1 | — |
| Tue, Mar 16 | No vendor named: Road surface treatments | $264,000 |
| Tue, Mar 16 | No vendor named: Aerator for the sewer treatment system (rent-to-own alternative $16,000-$17,000 a month) | $152,000 |
| Tue, Mar 16 | No vendor named: Transportation Master Plan study; $25,000 grant-funded | $100,000 |
| Tue, Mar 16 | No vendor named: COVID protective supplies | $14,708 |
| Tue, Mar 16 | MHTN Architects: Smith Ranch Community Park design services | — |
| Tue, Mar 16 | Kenny Seng Construction: Pony Express Parkway Phase 5 widening | — |
| Tue, Mar 16 | Kenny Seng Construction: Wride Memorial Park Phase 2 change order 1 | — |
| Tue, Mar 2 | No vendor named: Park fee-in-lieu for 176 lots under EMMC 16.35.105(A)(11), plus appraised land value (work-session figure for the Feb. 24 plat) | $330,000 |
| Tue, Mar 2 | M&M Asphalt Services: 2021 spray-applied seal coat project | — |
| Tue, Mar 2 | B Jackson: Lone Tree Parkway traffic signal installation | — |
| Tue, Feb 2 | Horrocks Engineers: Master Transportation Plan change order 1 | — |
| Tue, Feb 2 | Psomas: Water model rebuild change order 1 | — |
| Tue, Jan 19 | No vendor named: Cory B. Wride Memorial Park Phase 2 contracts | $4.32 million |
| Tue, Jan 19 | No vendor named: Water reuse master plan | $60,000 |
| Tue, Jan 19 | No vendor named: General fund: LED project city share ($4,020) and Accela scripting and reporting ($15,000) | $19,020 |
| Tue, Jan 19 | Bowen Collins and Associates: Water reuse master plan for secondary water systems | — |
| Tue, Jan 19 | Horrocks Engineers (name garbled in minutes): Pony Express Parkway widening design change order #5 | — |
| Tue, Jan 19 | Civil Science: Airport Road alignment change order #2 | — |
| Tue, Jan 5 | FX Construction: Gravity sewer main installation within wastewater treatment plant expansion change order #2 | $1.93 million |
| Tue, Jan 5 | Project Engineering Consultants: West access road construction management change order #1 (original contract $33,750; new total $68,100) | $34,350 |
| Tue, Jan 5 | Utah County Sheriff's Office: Law enforcement services, four-year term, 4% annual increase | — |
| Tue, Jan 5 | Grow Real Estate: Purchase agreement addendum | — |
| Tue, Dec 1 | Fieldstone Homes: Water impact fee reimbursement for oversizing a water line | — |
| Tue, Dec 1 | Horrocks Engineers: Master Transportation Plan | — |
| Tue, Dec 1 | Civil Science: Airport Road alignment and design | — |
| Tue, Nov 17 | Kemy Seng Construction: Cory B. Wride Memorial Park Phase 2 general contracting | — |
| Tue, Nov 17 | Codale Electric: Phase 2 lighting | — |
| Tue, Nov 17 | Big T Recreation: Phase 2 amenities | — |
| Tue, Nov 17 | Sonntag Recreation: Phase 2 park equipment | — |
| Tue, Nov 17 | Monte Vista Ranch, LLC: Sewer trunk line reimbursement | — |
| Tue, Nov 17 | Onsite Development Inc.: Utility billing office remodel | — |
| Tue, Oct 20 | Utah Transportation Commission: Debt issued June 2019 for Pony Express Parkway widening | $2.00 million |
| Tue, Oct 20 | Insituform Technologies: 30-inch sewer CIPP lining, Phase 1 | — |
| Tue, Oct 20 | Advanced Lining: Sewer manhole rehabilitation | — |
| Tue, Oct 6 | Stratton & Bratt Landscape: Silverlake Woodhaven Community Park, Phase I | — |
| Tue, Oct 6 | RBI Inc.: Pony Express Parkway median improvements | — |
| Tue, Sep 15 | Landmark Excavating: Traffic light installation | — |
| Tue, Sep 15 | Ken Garff Ford: 2021 Ford F-350 and F-250 trucks | — |
| Tue, Sep 15 | Arrow Engineering: Spoils pile removal on city property | — |
| Tue, Sep 15 | FX Construction: Wastewater treatment plant expansion change order #1 | — |
| Tue, Sep 1 | Black and McDonald: Professional services addendum, labor and equipment | — |
| Tue, Sep 1 | Rush Trucks: Two International CV515 snow plow dump trucks | — |
| Tue, Aug 18 | Central Utah Water Conservancy District: Reimbursement agreement | — |
| Tue, Jul 21 | Central Utah Water Conservancy District: Advance purchase of two years of Central Water Project water shares at a 2.5% discount (about $500,000 savings) | $13.0 million |
| Tue, Jul 21 | No vendor named: Water/sewer building | $4.00 million |
| Tue, Jul 21 | No vendor named: Sewer plant expansion | $3.00 million |
| Tue, Jul 21 | No vendor named: Human resources management software | $35,000 |
| Tue, Jul 21 | No vendor named: Increase for Accela land-management software to cover a full year and user licenses | $20,000 |
| Tue, Jul 21 | Yesco: Digital sign change order #1 | — |
| Tue, Jul 7 | Stadion, LLC: Additional cost of Pole Canyon sewer line | $1.70 million |
| Tue, Jul 7 | Accela: Land management software, 25 licenses; amount not stated | — |
| Tue, Jul 7 | Byrne: Software implementation; amount not stated in the minutes | — |
| Tue, Jul 7 | Geneva: 2020 micro surface project; amount not stated in the minutes | — |
| Tue, Jul 7 | Landmark Excavation: Pole Canyon water line and sewer force main; amount not stated | — |
| Tue, Jul 7 | No vendor named: Bond release/warranty actions; amounts not stated | — |
| Tue, Jul 7 | Kenny Seng Construction: Pony Express Parkway, Change Order No. 3; amount not stated | — |
| Tue, Jun 16 | No vendor named: Sales tax projection reduction as COVID-19 precaution | $1.00 million |
| Tue, Jun 16 | No vendor named: Developer impact fee reimbursements | $100,000 |
| Tue, Jun 16 | No vendor named: Valley View Park restroom | $55,000 |
| Tue, Jun 16 | No vendor named: Hummer Trail | $16,500 |
| Tue, Jun 16 | No vendor named: Compensation study | $15,000 |
| Tue, Jun 16 | No vendor named: Utility billing | $10,000 |
| Tue, Jun 16 | No vendor named: Bond releases; amounts not stated | — |
| Tue, Jun 16 | Sunrise Engineering: Facebook re-use and winter storage design and construction management, Change Order No. 1; amount not stated in the minutes | — |
| Tue, Jun 2 | No vendor named: Single-family parks impact fee incl. Mid-Valley regional buy-in ($110 + $3,580) | $3,690 |
| Tue, Jun 2 | No vendor named: Multifamily parks impact fee incl. Mid-Valley regional buy-in ($77 + $2,511) | $2,588 |
| Tue, Jun 2 | Project Engineering Consultants: Construction management, Facebook West access road and waterline; amount not stated in the minutes | — |
| Tue, Jun 2 | Skip Dunn and Sons Excavating: Facebook West access road and waterline construction; amount not stated in the minutes | — |
| Tue, Jun 2 | FX Construction: Wastewater treatment plant expansion; amount not stated in the minutes | — |
| Tue, Jun 2 | Environmental Planning Group: Woodhaven Park design Change Order No. 1; amount not stated | — |
| Tue, May 19 | Utah Outdoor Recreation Division: Half of the $48,100 Hidden Valley trailhead project (pavement, fencing, signage) | $24,050 |
| Tue, May 19 | Wasatch West Construction: Vehicle wash bay at Community Development building; amount not stated in the minutes | — |
| Tue, May 19 | Bailey Builders: Library addition; amount not stated in the minutes | — |
| Tue, May 19 | Barr Engineering: Water optimization study; amount not stated in the minutes | — |
| Tue, May 19 | No vendor named: Bond releases; amounts not stated | — |
| Tue, May 19 | Probuild Construction: Facebook 3.5 MG tank, Change Order No. 1; amount not stated | — |
| Tue, May 19 | Horrocks Engineers: Waterline relocation and redesign, widening design Change Order No. 4; amount not stated | — |
| Tue, May 19 | Aqua Engineering: Wastewater treatment expansion design, Change Order No. 3; amount not stated | — |
| Tue, May 5 | NFP Corporate Benefits: 2020 employee health insurance premium (up $3,946 from $977,591 in 2019) | $981,537 |
| Tue, Apr 21 | Aqua Engineering: Wastewater treatment expansion design, Change Order No. 2; amount not stated | — |
| Tue, Apr 7 | RBI, Inc.: Pony Express Parkway median landscaping | $199,018 |
| Tue, Apr 7 | Horrocks Engineers: Traffic signal design, Lone Tree Parkway | $10,300 |
| Tue, Apr 7 | Civil Solutions Group: Professional services for Wride Memorial Park Phase 2; amount not stated | — |
| Tue, Apr 7 | CT Davis Excavation: Valley View restroom project, Change Order No. 1; amount not stated | — |
| Tue, Apr 7 | No vendor named: Bond releases; amounts not stated | — |
| Tue, Mar 17 | No vendor named: Split-rail fencing to replace railroad ties at trailhead lots | $4,000 |
| Tue, Mar 17 | No vendor named: Landscape cash escrow per lot/unit at plat recording | $2,810 |
| Tue, Mar 17 | Project Engineering Consultants, Ltd.: Construction management, Pony Express trench repair; amount not stated | — |
| Tue, Mar 17 | MHTN Architects: Parks, Trails & Open Space Master Plan update; amount not stated | — |
| Tue, Mar 17 | Morgan Pavement: 2020 slurry seal; amount not stated | — |
| Tue, Mar 17 | No vendor named: Bond releases; amounts not stated | — |
| Tue, Mar 17 | Flagship Homes: Transportation reimbursement for Golden Eagle Road; amount not stated | — |
| Tue, Feb 18 | Executech, LLC: Managed IT services, 45 on-site hours per month; $105/hour rising to $108/hour from July 2020 | — |
| Tue, Feb 18 | YESCO: Digital signs; amount not stated in the minutes | — |
| Tue, Feb 18 | No vendor named: Bond releases; amounts not stated | — |
| Tue, Feb 18 | Hunt Electric: 2019 traffic signals, Change Order No. 3; amount not stated | — |
| Tue, Feb 4 | Gilbert and Stewart CPAs: FY 2019 audit; no dollar amount stated | — |
| Tue, Feb 4 | No vendor named: Improvement guarantee release/warranty status for two plats; amounts not stated | — |
| Tue, Feb 4 | Knife River Construction: Trench repair completed last summer on the Pony Express widening; amount not stated | — |
| Tue, Jan 21 | No vendor named: Airport Road design | $60,000 |
| Tue, Jan 21 | No vendor named: Digital Media Specialist position through June (estimated annual salary $40,000-$45,000 plus benefits) | $40,000 |
| Tue, Jan 21 | No vendor named: Operating system upgrade | $3,000 |
| Tue, Jan 21 | No vendor named: Release of developer improvement guarantees on nine plats; amounts not stated in the minutes | — |
| Tue, Jan 21 | Kenny Seng Construction: Additional widening costs and a waterline trench on the Pony Express Parkway widening; amount of Change Order No. 2 not stated | — |
| Tue, Jan 21 | Facebook: Infrastructure costs reimbursed by Facebook; amount not stated | — |
| Tue, Jan 21 | Mountainland Supply Company (Sensus by Xylem): Advanced metering infrastructure network; amount not stated | — |