Thursday, October 15, 2026The Utah Ledger

Everything Utah, every day.

Eagle Mountain · City Council

Council approves AT&T 100-foot cell tower at Cedar Valley High School 3-2 and adopts economic development master plan without highest-and-best-use chapter

March 21, 2023, 4:00 p.m. · Eagle Mountain City Council Chambers, 1650 E Stagecoach Run, Eagle Mountain, Utah

The council voted 3-2 to approve a 100-foot AT&T monolithic cell tower at Cedar Valley High School with five conditions, with Council Members Colby Curtis and Brett Wright opposed. It adopted the economic development master plan 5-0 after removing a chapter on highest and best use, approved a consolidated fee schedule with amendments, a home business ordinance and the Well 7 drilling contract. The work session heard that the only bid for the Eagle Mountain roundabout and Major Street signal came in well over budget.

From the approved minutes. Updated October 14, 2026.

Decisions at a glance

Agenda, item by item

  1. Item 12.A · Development

    AT&T 100-foot monolithic cell tower, Cedar Valley High School

    Approved with conditions · 3-2 · 1389 E. Aviator Avenue (Utah County parcel 59:033:0038)

    The tower, at 1389 E. Aviator Avenue (Utah County parcel 59:033:0038), would replace a stadium light pole at the school. The required setback is four times the tower height, or 400 feet; staff said the tower is over 400 feet from the school but under 400 feet from potential lots to the east. Council Members Curtis and Donna Burnham raised health and safety concerns, especially electromagnetic emissions near students; members asked whether the applicant followed the standard of using city property first, and the applicant said no city locations meet coverage needs. Wright asked for masonry screening. Planning Manager Robert Hobbs presented; the Planning Commission recommended five exemptions. The council approved with conditions: a 100-foot tower at the specified location, an equipment enclosure south of the tower abutting a parking lot, 8-foot chain link fencing, a lightning rod and an emergency backup generator. Curtis and Wright voted no.

    • Applicant: AT&T
    • Height: 100 feet
    • Setback required: 400 feet (four times height)

    Moved by Council Member Donna Burnham, seconded by Council Member Jared Gray. Vote: 3-2; Curtis, Wright voted no. Voting no: Council Member Colby Curtis, Council Member Brett Wright

    Follow AT&T cell tower, Cedar Valley High School in the development tracker →

  2. Item 16.A · Other

    Economic development master plan

    Approved with conditions · 5-0

    Staff presented edits on workforce housing, small business spaces and prioritizing commercial development. Members discussed housing density, multifamily units and vested units; Assistant City Administrator Steve Mumford estimated remaining vested units at about 81 percent single-family and 19 percent multifamily, including townhomes. The council approved the resolution with Chapter 13, the highest and best use analysis, removed.

    Moved by Council Member Brett Wright, seconded by Council Member Colby Curtis. Vote: 5-0

  3. Item 13.A · Taxes and fees

    Consolidated fee schedule

    Approved with conditions · 5-0

    Work session discussion covered Section 9.2 wording, a change from a $10 daily rate to a monthly rate in Section 15.1 and a $50 utility turn-on fee in Section 22.5.4. The council approved with three amendments: retitling Section 9.2 "Parking Violations; Blocking Streets and/or Sidewalks Illegally," striking the special-arrangements reference in Section 22.5.3, and adding "only" to the first sentence of Section 22.5.4. The minutes do not reconcile whether the struck phrase belongs to 22.5.3 or 22.5.4.

    • Fee$50 Utility turn-on fee

    Moved by Council Member Carolyn Love, seconded by Council Member Brett Wright. Vote: 5-0

  4. Item 15.A · City code

    Home businesses, Chapter 17.65

    Approved · 5-0

    At the hearing (8:03 to 8:05 p.m.) a resident asked to limit business vehicles on properties. The council approved the ordinance as drafted, and the mayor directed staff to bring a Title 10 amendment on work vehicle limits for all businesses.

    Moved by Council Member Donna Burnham, seconded by Council Member Jared Gray. Vote: 5-0

  5. Item 9.A · Roads and utilities

    Well 7 drilling, Grimshaw Drilling

    Approved · 5-0

    The prior contractor did no work and was not paid. Grimshaw's bid covers a 900-foot-deep well, 20 inches then 16 inches in diameter. In the work session staff said a shallower well could save $1,000,000 but advised against it. Approved on the consent agenda; the minutes give no contract amount.

    Moved by Council Member Donna Burnham, seconded by Council Member Jared Gray (consent agenda, with 12.A and 13.A removed). Vote: 5-0

  6. Item 13.B · Contract

    2023 municipal election interlocal agreement with Utah County

    Approved · 5-0

    Election costs scale with registered voters, capped at $2.25 per ballot. Ranked choice voting was discussed as a lower-cost option but was not selected. Approved on the consent agenda.

    Moved by Council Member Donna Burnham, seconded by Council Member Jared Gray (consent agenda). Vote: 5-0

  7. Item 10.A-11.A · Subdivision

    Eagle Point Plat E bond release and minutes

    Approved · 5-0

    Eagle Point Plat E moved into warranty and the March 7 minutes were approved on the consent agenda.

    Moved by Council Member Donna Burnham, seconded by Council Member Jared Gray (consent agenda). Vote: 5-0

  8. Item 14.A · Development

    Pole Canyon (Firefly) first amendment to master development plan

    Withdrawn

    Removed at the applicant's request and not discussed.

    Follow Firefly (Pole Canyon) master development plan in the development tracker →

  9. Item 1.A · Roads and utilities

    City administrator update (work session)

    Discussed

    The only bid for the Eagle Mountain roundabout was $2,500,000 for the roundabout portions and $540,000 for the Major Street signal, well above budget; staff recommended re-bidding the signal with the Stonebridge Lane and Woodhaven Boulevard signals and reviewing scope reductions. Smith Ranch Community Park bids exceeded estimates and value engineering is underway. Silver Creek Way roadway is expected complete by July 2023, and 23 single-family and no multifamily permits were issued in March. A Comcast representative presented service and low-income program plans.

    • Contract$2.50 million Eagle Mountain roundabout portions, single bid received
    • Contract$540,000 Major Street signal, single bid received

    Follow Smith Ranch Community Park in the development tracker →

What residents said

Cell tower emissions near studentsTraffic signal timing at Cedar Pass RanchProposed Walmart access and trafficWildlife corridor

Residents spoke from 7:09 to 7:27 p.m. Two asked that Comcast boxes be placed at ground level, one asked about traffic signal timing for the left-turn lane into Cedar Pass Ranch and suggested a flashing yellow arrow, a Wildlife Alliance representative asked to limit large agreements per agenda, require disclosure of all changes, expedite the Wildlife Corridor Overlay and set 50-foot RA1 and RA2 setbacks in Cedar Pass Ranch, and one opposed a proposed Walmart location over access, traffic and proximity to parks and schools.