Contracts and spending
Who Holladay pays, for what, and how the vendor was chosen: the contracts, bid awards, change orders, purchases, grants and land deals recorded in the City Council meetings written up so far, from the meeting minutes and packets, plus what the city paid its biggest vendors from the state transparency site.
In brief
351 spending items recorded in Holladay meetings between 2020 and 2026.
13 approved contracts, purchases and land deals total $12.0 million. The largest is $5.00 million to Millcreek City for wasatch Boulevard project (Holladay portion about $600,000) (August 22, 2024).
By type: 132 budget, 85 grant, 55 contract, 21 bond, and 20 fee.
- Contracts, purchases and land deals approved in these meetings
- $12.0 million
- Line items
- 351
- Vendors
- 8
Recorded spending decisions and proposals
| Date | Who and what | Amount |
|---|---|---|
| Thu, Aug 20 | FEMA: City Hall seismic retrofit grant; federal portion $1,275,000, local match required | $1.70 million |
| Thu, Aug 20 | No vendor named: Creative Aging grant application, up to | $3,000 |
| Thu, Aug 6 | Holladay Local Building Authority: Local Building Authority funding | $17.6 million |
| Thu, Aug 6 | No vendor named: Spring Lane Park option 1, full field renovation (about) | $9.10 million |
| Thu, Jul 16 | No vendor named: Spring Lane park estimate | $8.09 million |
| Thu, Jul 16 | Salt Lake County: Community-centered health programming, coming year (about) | $105,000 |
| Thu, Jul 16 | State Historic Preservation Office: Reconnaissance-level survey of 800 to 1,000 sites, 50% match | $15,000 |
| Thu, Jun 11 | No vendor named: 2025 lease revenue bond proceeds for City Hall and Spring Lane | $10.0 million |
| Thu, Jun 11 | No vendor named: Estimated cost of the Spring Lane development | $8.97 million |
| Thu, Jun 11 | No vendor named: Total property tax revenue for the fiscal year at the 0.001281 rate | $8.61 million |
| Thu, Jun 11 | No vendor named: Tourism, recreation, culture and convention grant for auditorium redesign | $730,000 |
| Thu, Jun 11 | No vendor named: HVAC energy efficiency grant (city match $43,000) | $100,000 |
| Thu, Jun 11 | Salt Lake County: Public works services interlocal agreement, fourth amendment matching the final budget | — |
| Thu, Jun 4 | No vendor named: City Hall refurbishment | $7.89 million |
| Thu, Jun 4 | No vendor named: Fund balance appropriation increase | $1.18 million |
| Thu, Jun 4 | No vendor named: Sales tax revenue increase | $220,000 |
| Thu, Jun 4 | No vendor named: Stormwater fee per equivalent residential unit from Jan. 1, 2027 (from $6.50) | $7.50 |
| Thu, May 21 | Salt Lake County: Recreation bond application for Spring Lane Park | $2.00 million |
| Thu, May 21 | Salt Lake County: TRCC application for Spring Lane Park | $1.00 million |
| Thu, May 21 | No vendor named: County public works contract increase | $311,000 |
| Thu, May 21 | No vendor named: Public works feasibility study | $50,000 |
| Thu, May 21 | Salt Lake County: TRCC tax act funds | — |
| Thu, May 14 | No vendor named: Projected fiscal 2026-27 expenditures | $50.4 million |
| Thu, May 14 | No vendor named: Local Building Authority projects: City Hall renovation and Spring Lane site | $15.0 million |
| Thu, May 14 | No vendor named: Personnel increase | $585,000 |
| Thu, May 14 | No vendor named: Debt service on the 2025 bond | $492,000 |
| Thu, May 14 | No vendor named: County public works contract increase | $311,000 |
| Thu, May 7 | No vendor named: Increase in police contract (about) | $310,000 |
| Thu, May 7 | No vendor named: Increase in public works contract (about) | $310,000 |
| Thu, Apr 23 | No vendor named: Estimated first-notice costs | $19,000 |
| Thu, Apr 23 | Knudsen family: Arch-style entrance sign donation | $18,000 |
| Thu, Apr 23 | Salt Lake Chamber: Membership proposed | $1,500 |
| Thu, Mar 19 | No vendor named: City Hall auditorium improvements | $730,000 |
| Thu, Mar 19 | No vendor named: Transportation and Land Use Connection grant, 3900 South and Highland Drive redevelopment study | $180,000 |
| Thu, Mar 19 | No vendor named: Estimated cost per bus stop including masonry | $20,000 |
| Thu, Mar 19 | Knudsen family: Donated entrance sign (value) | $18,000 |
| Thu, Mar 19 | No vendor named: Installation, at least | $12,000 |
| Thu, Mar 5 | No vendor named: General Fund appropriated fund balance increase | $226,252 |
| Thu, Mar 5 | Holladay Local Building Authority: Transfer for 2025 lease revenue bond (City Hall renovation and Spring Lane) | $201,150 |
| Thu, Mar 5 | No vendor named: Replacement software, at least | $70,000 |
| Thu, Mar 5 | No vendor named: Building inspection contract increase | $40,000 |
| Thu, Mar 5 | Salt Lake County: Holladay skate park | — |
| Thu, Feb 19 | No vendor named: Spring Lane park phase one estimate | $3.80 million |
| Thu, Feb 19 | Family donor: Donation for naming rights, southwest baseball field, 10 years | $25,000 |
| Thu, Jan 22 | No vendor named: House homeland security appropriation earmark for Holladay | $1.76 million |
| Thu, Jan 22 | No vendor named: Projected expenses for proposed June 2026 production | $51,000 |
| Thu, Jan 22 | Family donor: Donation toward ten-year ball field maintenance (estimated $38,000) | $25,000 |
| Thu, Jan 8 | No vendor named: Highland Drive secured funding; gap about $15 million | $7.00 million |
| Thu, Jan 8 | No vendor named: Senate proposal for City Hall retrofit earmark | $1.65 million |
| Thu, Jan 8 | No vendor named: 5600 South sidewalk (TAP grant), total cost; city share about $300,000 | $525,000 |
| Thu, Jan 8 | Woodbury Corporation: Temporary City Hall lease, 18 months; base rent slightly under $8 per square foot plus about $4 per square foot in other charges | — |
| Thu, Dec 18 | KMW Development, LLC: Restricted city loan, forgiven as affordable units are built and deed-restricted | $2.50 million |
| Thu, Dec 11 | No vendor named: Restricted city loan item in affordable housing agreement | $2.50 million |
| Thu, Dec 11 | No vendor named: Millrock project area funds that must be spent by May 1, 2029 | $2.00 million |
| Thu, Dec 4 | No vendor named: County housing rehabilitation match | $10,160 |
| Thu, Nov 20 | State of Utah: Highland Drive improvements, Van Winkle to Arbor Lane (HB 488) | $1.23 million |
| Thu, Nov 20 | Salt Lake County: Housing rehabilitation loan program | $220,000 |
| Thu, Nov 20 | No vendor named: Transfer for 6200 South UDOT-grant project non-reimbursable costs | $45,205 |
| Thu, Nov 20 | No vendor named: City match for housing rehabilitation | $10,160 |
| Thu, Nov 20 | No vendor named: Highland Drive regional safety audit transfer | $5,091 |
| Thu, Nov 20 | Salt Lake County: CDBG home repair loan program | — |
| Thu, Nov 20 | NeighborWorks: Administration of housing programs | — |
| Thu, Nov 6 | No vendor named: RDA contribution proposed for affordable housing at Holladay Hills | $2.50 million |
| Thu, Nov 6 | No vendor named: Shared prosecution budget | $315,000 |
| Thu, Nov 6 | No vendor named: Proposed convenience store license fee (from $1,750) | $12,247 |
| Thu, Nov 6 | Brighton: Justice court services | — |
| Thu, Oct 2 | Knudsen family: Donated aluminum entrance sign (about) | $18,000 |
| Thu, Oct 2 | No vendor named: Engineering to secure the sign, estimated under this amount | $5,000 |
| Thu, Sep 18 | Holladay Local Building Authority: Not more than $11.5 million lease revenue bonds for City Hall, park and recreation facility, other facilities, reserve and issuance costs; $10.2 to $10.3 million expected to be used | $11.5 million |
| Thu, Sep 18 | Holladay Local Building Authority: Not more than $11.5 million; maximum rate 6.5%, 25 years | $11.5 million |
| Thu, Aug 28 | No vendor named: City Hall upgrade estimate | $9.70 million |
| Thu, Aug 28 | No vendor named: Spring Lane estimate | $9.00 million |
| Thu, Aug 28 | No vendor named: Community Project Fund earmark, not yet approved | $1.70 million |
| Thu, Aug 7 | No vendor named: Option B bond in 2026 | $10.1 million |
| Thu, Aug 7 | No vendor named: Highland Drive bridge | $7.10 million |
| Thu, Aug 7 | No vendor named: Option A bond in 2026 | $6.60 million |
| Thu, Aug 7 | Granite School District: Total lease payments over 30 years (about) | $1.50 million |
| Thu, Aug 7 | UDOT: Safe Sidewalks, 4500 South phase II; 25% city match | $200,000 |
| Thu, Aug 7 | Hansen Law: Escalator increase this year (about); shared with Millcreek and Cottonwood Heights | $10,000 |
| Thu, Aug 7 | Salt Lake County: Historical markers | — |
| Thu, Aug 7 | Stowell Crayk: Indigent defense; primary rate from $150 to $200 | — |
| Thu, Jul 17 | Salt Lake County Health Department: Public health program, initial grant (about) | $76,000 |
| Thu, Jul 17 | Salt Lake County Health Department: Increase after milestones met | $35,000 |
| Thu, Jul 17 | No vendor named: Proposed bike lane marking and parking changes, mainly Holladay Boulevard | $30,000 |
| Thu, Jul 17 | Central Wasatch Commission: Membership; roughly $25,000 was discussed at an earlier meeting but no amount is stated in these minutes | — |
| Thu, Jun 12 | No vendor named: Increment cap for the Cottonwood Mall project area | $122.5 million |
| Thu, Jun 12 | No vendor named: Federal request for City Hall and Spring Lane project | $2.00 million |
| Thu, Jun 12 | Salt Lake County: Public works services, increase slightly under 3% | — |
| Thu, Jun 5 | No vendor named: Paving | $500,000 |
| Thu, Jun 5 | No vendor named: Fund balance contribution | $412,362 |
| Thu, Jun 5 | No vendor named: Murray Holladay Road signal | $350,000 |
| Thu, Jun 5 | No vendor named: Knudsen Park expansion | $150,000 |
| Thu, Jun 5 | No vendor named: Vehicle replacement | $120,000 |
| Thu, May 15 | No vendor named: Federal funding for Highland Drive | $3.60 million |
| Thu, May 15 | Salt Lake County: Rooted Together history project | $600,000 |
| Thu, May 15 | No vendor named: CDBG housing rehabilitation application | $220,000 |
| Thu, May 15 | Salt Lake County: Community-centered health programming | — |
| Thu, May 8 | No vendor named: Paving | $565,000 |
| Thu, May 8 | No vendor named: Knudsen Park expansion | $150,000 |
| Thu, May 8 | No vendor named: Vehicle replacement | $120,000 |
| Thu, May 8 | No vendor named: Curb and gutter | $100,000 |
| Thu, May 8 | No vendor named: Public works contract increase | $90,513 |
| Thu, May 8 | No vendor named: 3% cost-of-living adjustment | $72,559 |
| Thu, May 8 | No vendor named: Proposed stormwater fee per unit under scenario 2 | $8.50 |
| Thu, May 8 | No vendor named: Current monthly stormwater fee per equivalent residential unit | $6.50 |
| Thu, May 1 | Central Wasatch Commission: Roughly $25,000 initial membership fee discussed | $25,000 |
| Thu, Apr 17 | No vendor named: Federal Community Project Fund request for City Hall | $2.00 million |
| Thu, Apr 17 | No vendor named: Police services increase | $406,384 |
| Thu, Apr 17 | No vendor named: UDOT Safe Sidewalks, 4500 South phase two, up to | $200,000 |
| Thu, Apr 17 | No vendor named: Unified Fire Authority increase | $126,242 |
| Thu, Apr 17 | Salt Lake County: Election services | — |
| Thu, Apr 17 | Salt Lake County: Traffic signal installation | — |
| Thu, Apr 17 | Salt Lake County: TRCC grant reimbursement, City Hall auditorium renovation | — |
| Thu, Mar 20 | No vendor named: Revised Highland Drive estimate with undergrounding | $49.4 million |
| Thu, Mar 20 | Wasatch Front Regional Council: Pending grant application for Highland Drive | $5.00 million |
| Thu, Mar 20 | No vendor named: Murray Holladay Road signal reconstruction; developer to repay | $350,000 |
| Thu, Mar 20 | Cottonwood Heights: Justice court services interlocal agreement | — |
| Thu, Mar 20 | Sheryl Gillilan: Public art consultant | — |
| Thu, Mar 6 | No vendor named: Capital projects interest increase | $550,000 |
| Thu, Mar 6 | No vendor named: Murray Holladay Road signal reconstruction near Royal Holladay Hills; capital funds advance the work with repayment from increment | $350,000 |
| Thu, Mar 6 | No vendor named: Stormwater fund balance increase | $330,299 |
| Thu, Mar 6 | No vendor named: Two part-time positions, from fund balance | $44,311 |
| Thu, Mar 6 | Salt Lake County: TRCC grant for City Hall auditorium renovation design study | $22,500 |
| Thu, Feb 6 | No vendor named: Phase 3 sidewalk extension, applicant estimate | $120,000 |
| Thu, Feb 6 | No vendor named: Phase 1 restriping, applicant estimate | $25,000 |
| Thu, Feb 6 | No vendor named: Phase 2 sidewalk start, applicant estimate, to be covered by a bond | $5,000 |
| Thu, Jan 9 | No vendor named: Estimated cost of Highland Drive reconstruction, stated as "up to $30 million or more" | $30.0 million |
| Thu, Jan 9 | No vendor named: Estimated cost of City Hall seismic retrofit | $10.0 million |
| Thu, Dec 12 | No vendor named: Proposed CDBG application for home repair loans of up to $25,000 | $200,000 |
| Thu, Dec 12 | No vendor named: Application fees, about $1,300 each (about $10,000 to $11,000) | $10,000 |
| Thu, Nov 7 | No vendor named: City Hall renovation estimate | $7.90 million |
| Thu, Nov 7 | No vendor named: Spring Lane park estimate in most scenarios | $7.50 million |
| Thu, Nov 7 | No vendor named: Bond in Scenario 1 | $4.00 million |
| Thu, Oct 24 | Unified Police Department: Projected added cost to base police contract from crossing guard error | $65,000 |
| Thu, Oct 24 | Wasatch Front Waste and Recycling: Proposed monthly household fee, up from $19.50 | $26 |
| Thu, Sep 5 | No vendor named: Corrugated metal pipe liner rehabilitation | $2.50 million |
| Thu, Sep 5 | No vendor named: Extended park restroom season | $700 |
| Thu, Aug 22 | Millcreek City: Wasatch Boulevard project (Holladay portion about $600,000) | $5.00 million |
| Thu, Aug 22 | No vendor named: Requested city share of burying overhead power lines (total about $130,000) | $65,000 |
| Thu, Aug 22 | Salt Lake County: Orthorectified aerial imagery | $1,094.60 |
| Thu, Jul 11 | No vendor named: Congressional earmark for City Hall seismic work, reduced from $2 million | $1.70 million |
| Thu, Jul 11 | Salt Lake County: Annual snow plow service for eight routes | $465,700 |
| Thu, Jul 11 | No vendor named: Phase I parking overlay | $123,656 |
| Thu, Jul 11 | Salt Lake County Health Department: Opioid-related grant award, renewable twice | $72,185 |
| Thu, Jul 11 | Millcreek City: Multi-jurisdictional building inspections | — |
| Thu, Jun 6 | Unified Police Department: Holladay total police cost, a 10.43% increase | $7.91 million |
| Thu, Jun 6 | No vendor named: Indicated federal earmark for City Hall seismic reinforcement | $2.00 million |
| Thu, Jun 6 | Salt Lake County Health Department: Opioid settlement funds | $72,185 |
| Thu, Jun 6 | No vendor named: Skate park lighting donations | $28,525 |
| Thu, May 16 | Unified Fire Authority: Capital fund transfer | $300,000 |
| Thu, May 16 | Salt Lake County: Property acquisition for Highland Drive corridor preservation | $64,000 |
| Thu, May 16 | BarX Group: Light pole reimbursement cap under Addendum 5 | $60,000 |
| Thu, May 9 | No vendor named: City Hall design | $350,000 |
| Thu, May 2 | No vendor named: Proposed 2024-25 general fund | $22.2 million |
| Thu, May 2 | No vendor named: Construction-only estimate for Spring Lane concepts, $8.3 million to $9 million | $9.00 million |
| Thu, Apr 11 | Salt Lake County: TRCC funding for sports lighting and replacing trellis columns with stone | $125,000 |
| Thu, Apr 11 | Salt Lake County Health Department: Opioid settlement grant for a part-time public health coordinator | $72,185 |
| Thu, Mar 21 | Utah Department of Transportation: Committed funding for the 3900 South trail | $10.0 million |
| Thu, Mar 7 | No vendor named: Parking garage hard costs | $51.0 million |
| Thu, Mar 7 | No vendor named: Federal earmark for Highland Drive (pending Senate approval) | $3.60 million |
| Thu, Mar 7 | No vendor named: State appropriation for Highland Drive | $1.23 million |
| Thu, Mar 7 | No vendor named: Safe Routes to School award for 2700 East Phase 2 (match required) | $700,000 |
| Thu, Mar 7 | Teleport Communications America, LLC: Franchise agreement | — |
| Thu, Feb 15 | No vendor named: Maximum bond issuance for the public infrastructure districts | $80.0 million |
| Thu, Feb 1 | No vendor named: New fire engine with 660-day lead time | $684,000 |
| Thu, Nov 16 | No vendor named: Capital projects fund balance for multiple expenses | $905,000 |
| Thu, Nov 16 | No vendor named: Holladay match for $6.7 million federal grant for the Highland Drive bridge | $480,000 |
| Thu, Nov 16 | No vendor named: Match for 2700 East sidewalk grant | $200,000 |
| Thu, Nov 16 | CCTM1, LLC: Third amendment to cell tower lease | — |
| Thu, Nov 2 | Salt Lake County: TRCC funding for the historic experience exhibit | $600,000 |
| Thu, Nov 2 | No vendor named: Corridor preservation request for 4500 South and Highland Drive | $64,000 |
| Thu, Nov 2 | Rocky Mountain Power: Third-party expertise payment and opt-out notice payment under the Community Renewable Energy Act | — |
| Thu, Oct 19 | Salt Lake County: TRCC application for skate park lighting and pillar replacement; $30,000 donated match | $120,000 |
| Thu, Oct 19 | No vendor named: Estimated opt-out notice cost for the community renewable energy program | $19,530.78 |
| Thu, Oct 5 | Horrocks Engineers: I-215 shared use path feasibility study | — |
| Thu, Sep 21 | No vendor named: Storm drain and lining projects, about $6.5 million | $6.50 million |
| Thu, Aug 17 | Utah Department of Transportation: Recommended funding for Highland Drive bridge repair | $7.10 million |
| Thu, Aug 17 | No vendor named: Bond proceeds available for City Hall work | $1.00 million |
| Thu, Aug 17 | No vendor named: General fund commitment in the historic exhibit grant application | $96,000 |
| Thu, Aug 17 | No vendor named: Conceptual work for Spring Lane Elementary, estimated $50,000 to $75,000 | $75,000 |
| Thu, Jul 13 | No vendor named: Subcommittee-recommended funding for Highland Drive pre-design and right-of-way | $3.60 million |
| Thu, Jul 13 | Salt Lake County: Wasatch Boulevard bike lanes, Holladay section | $600,000 |
| Thu, Jul 13 | Salt Lake County: Animal services | — |
| Thu, Jul 13 | Millcreek City: Reimburses half of HAWK signal costs under a separate agreement | — |
| Thu, Jun 15 | Salt Lake County: County award for Wasatch Boulevard improvements from 3300 South | $5.10 million |
| Thu, Jun 15 | Salt Lake County: TRCC application for parking, skate park lighting and trellis pillars | $180,000 |
| Thu, Jun 8 | No vendor named: Historical Commission museum project | $100,000 |
| Thu, Jun 8 | No vendor named: Summer concert series transfer to the Arts Council | $30,000 |
| Thu, Jun 8 | No vendor named: Tree Committee request | $10,000 |
| Thu, Jun 1 | Unified Fire Authority: Type 1 engine, one of three apparatus priced | $942,000 |
| Thu, Jun 1 | Unified Police Department: Holladay contribution to police general fund shortfall, in each of 2023 and 2024 | $154,000 |
| Thu, Jun 1 | No vendor named: Park pavilion deposit proposed for elimination | $50 |
| Thu, May 18 | Salt Lake County: Public services county contract, just under $2.8 million | $2.80 million |
| Thu, May 11 | Unified Police Department: Police services in the tentative budget (about 35% of total) | $7.10 million |
| Thu, May 11 | No vendor named: Second ARPA payment received in 2023 | $1.70 million |
| Thu, May 4 | No vendor named: Signal optimization application to the Wasatch Front Regional Council | $1.10 million |
| Thu, May 4 | Harper Precast: Concrete flood barriers at no charge except delivery and pickup fees | $0 |
| Thu, Apr 20 | No vendor named: Federal funding request for Highland Drive reconstruction | $3.60 million |
| Thu, Apr 6 | Salt Lake County: TRCC award for the Holladay City Park Historic Walk | $600,000 |
| Thu, Apr 6 | Salt Lake County: 2023 election services | — |
| Thu, Feb 2 | No vendor named: Budget amendment for the storm drainage property purchase, including closing and legal costs | $980,000 |
| Thu, Feb 2 | No vendor named: Requested direct state appropriation | $750,000 |
| Thu, Feb 2 | No vendor named: County-level award received | $600,000 |
| Thu, Feb 2 | No vendor named: Storm drainage property purchase on Holladay Boulevard | — |
| Thu, Jan 19 | No vendor named: Storm drainage property purchase (budget amendment) | $990,000 |
| Thu, Jan 19 | No vendor named: Development and fundraising services | $20,000 |
| Thu, Jan 19 | Zayo Group, LLC: Franchise agreement | — |
| Thu, Dec 8 | Pathway Associates: Ongoing development services at $3,000 per month (alternative: $1,600 one-time analysis) | $3,000 |
| Thu, Nov 17 | Salt Lake County: Public works services under a five-year interlocal agreement | $2.24 million |
| Thu, Nov 17 | No vendor named: Website redesign (estimate) | $53,000 |
| Thu, Nov 17 | Syringa Networks, LLC: Franchise telecommunications tax of 3.5% of gross receipts | — |
| Thu, Nov 3 | No vendor named: Replacement of the pedestrian bridge (estimate) | $7.00 million |
| Thu, Nov 3 | No vendor named: Immediate repairs to the pedestrian bridge (estimate) | $250,000 |
| Thu, Nov 3 | Pathway Associates: Development and fundraising services, about $3,000 per month | $36,000 |
| Thu, Nov 3 | Wasatch Front Waste and Recycling: Proposed $2.50 per month increase on a $17 monthly fee | — |
| Thu, Oct 6 | No vendor named: ADA ramp, high estimate of two options ($48,000 to $60,000) | $60,000 |
| Thu, Oct 6 | Salt Lake County: UPDES stormwater media campaign | — |
| Thu, Sep 8 | No vendor named: Remaining cost of skate park lighting | $75,000 |
| Thu, Sep 8 | No vendor named: Fourth of July celebration | $34,210 |
| Thu, Aug 18 | MGB+A and ECI: Canal trail feasibility study | $75,000 |
| Thu, Aug 18 | No vendor named: Xeriscaping of monument corners | $50,000 |
| Thu, Aug 18 | Spohn Ranch: Skate park lights, estimated $60,000 to $80,000 | — |
| Thu, Aug 11 | No vendor named: Application for matching museum grant requiring a $250,000 city match | $750,000 |
| Thu, Aug 11 | No vendor named: Museum concept study | $25,000 |
| Thu, Jul 14 | Salt Lake County: Aerial photography interlocal agreement | — |
| Thu, Jun 16 | No vendor named: Stormwater fund bond proceeds added to the 2021-22 budget | $10.0 million |
| Thu, Jun 16 | Millcreek City: Utility boxes, covers and concrete collars on Murray Holladay Road | — |
| Thu, Jun 2 | Unified Fire Authority: Holladay member fee | $2.73 million |
| Thu, Jun 2 | Historical Commission: Requested increase, bringing its total to $5,000 | $4,000 |
| Thu, May 19 | No vendor named: Construction proceeds from Series 2022 sales tax revenue bonds | $18.0 million |
| Thu, May 12 | Unified Police Department: Draft Holladay precinct budget | $5.20 million |
| Thu, May 5 | No vendor named: Proposed 2022-23 General Fund | $22.7 million |
| Thu, May 5 | No vendor named: One-time federal funding recognized in the tentative budget | $1.80 million |
| Thu, May 5 | No vendor named: City assessment for the community renewable energy program (half paid February 2022) | $18,000 |
| Thu, Apr 21 | KMW Development, LLC: Site development agreement with the Redevelopment Agency | — |
| Thu, Apr 21 | KMW Development, LLC: Agreement for Development of Land with the Redevelopment Agency | — |
| Thu, Apr 14 | No vendor named: Maximum authorized sales tax revenue bonds | $19.0 million |
| Thu, Mar 17 | No vendor named: Maximum par amount of Series 2022 sales tax revenue bonds for road, stormwater and related projects | $19.0 million |
| Thu, Mar 17 | No vendor named: Active transportation feasibility study along I-215 | $70,000 |
| Thu, Mar 3 | No vendor named: Holla Dollars approved budget | $450,000 |
| Thu, Mar 3 | No vendor named: Holla Dollars program cost | $32,154 |
| Thu, Feb 17 | No vendor named: Prior analysis of borrowing now cited by Council Member Gibbons | $8.00 million |
| Thu, Feb 17 | No vendor named: Assumed storm drain debt in 2022 (model) | $5.00 million |
| Thu, Feb 10 | No vendor named: ARPA funds for playground accessibility surface | $300,000 |
| Thu, Feb 10 | No vendor named: Playground surface project full estimate | $285,000 |
| Thu, Feb 10 | No vendor named: Quarterly mileage allowance per council member | $75 |
| Thu, Jan 20 | No vendor named: ARPA funds expected | $3.60 million |
| Thu, Jan 20 | No vendor named: Cottonwood Mall roadway reimbursement | $2.50 million |
| Thu, Jan 20 | No vendor named: Holladay Village tax increment to date | $500,000 |
| Thu, Jan 20 | No vendor named: Accessible playground surface project (total estimate) | $285,000 |
| Thu, Jan 6 | Salt Lake County: Restated TRCC agreement for public art; city match $50,000; completion by December 2022 | $50,000 |
| Thu, Jan 6 | State of Utah: Museum feasibility study (to be completed by June 30) | $25,000 |
| Thu, Nov 18 | Rocky Mountain Power: Collection of the stormwater fee on utility bills | — |
| Thu, Oct 14 | Unified Fire Service Area: Seismic upgrades to Station 104 | — |
| Thu, Aug 26 | Cottonwood Heights: Court services agreement amendment | — |
| Thu, Jun 17 | Salt Lake County: Public works interlocal agreement | — |
| Thu, Jun 17 | Salt Lake County: Animal control services, Amendment #3 | — |
| Thu, Jun 17 | Salt Lake County: Aerial photography interlocal agreement | — |
| Thu, May 20 | No vendor named: Bond for road work if the tax increase passes (10 years or less) | $8.00 million |
| Thu, May 20 | No vendor named: Pavement and overlay program | $7.20 million |
| Thu, May 20 | Unified Police Department: Holladay's total 2021-22 police cost (up 6.82%) | $5.56 million |
| Thu, May 20 | Unified Fire Authority: Net 2021-22 member fee after $11,461 credit | $2.62 million |
| Thu, May 20 | No vendor named: Transfer to Capital Projects Fund | $1.00 million |
| Thu, May 20 | No vendor named: Rubberized playground surface at City Park | $115,000 |
| Thu, May 20 | No vendor named: Four city center crosswalks, about $25,000 each | $100,000 |
| Thu, May 20 | FirstDigital Telecom, LLC: Franchise agreement for use of city streets | — |
| Thu, May 13 | No vendor named: Roads capital | $7.20 million |
| Thu, May 13 | No vendor named: Additional federal funds expected (minutes also cite $3.8 million) | $3.38 million |
| Thu, May 13 | No vendor named: Property tax increase revenue | $2.30 million |
| Thu, May 13 | No vendor named: Public works contract increase | $242,000 |
| Thu, May 13 | No vendor named: Accessible playground surface | $150,000 |
| Thu, May 13 | No vendor named: Signal optimization study | $120,000 |
| Thu, May 13 | No vendor named: Village Center pavers | $100,000 |
| Thu, May 13 | No vendor named: Federal lobbyist | $50,000 |
| Thu, May 13 | No vendor named: Arts Council summer concerts (requested) | $20,000 |
| Thu, May 6 | No vendor named: Added revenue from property tax increase (about) | $2.30 million |
| Thu, May 6 | No vendor named: Holla Dollars household vouchers | $451,000 |
| Thu, May 6 | No vendor named: Small business grants of up to $5,000 to about 45 businesses | $230,000 |
| Thu, Apr 8 | No vendor named: Road bond assumed in property tax model | $8.00 million |
| Thu, Apr 8 | No vendor named: Maximum estimated cost of traditional voting | $41,775 |
| Thu, Apr 8 | No vendor named: Holladay's estimated initial cost for the community renewable energy program | $28,923.31 |
| Thu, Apr 8 | No vendor named: Estimated cost of ranked-choice voting for the 2021 election | $25,289 |
| Thu, Apr 1 | No vendor named: Assumed bond in the property tax model | $7.00 million |
| Thu, Apr 1 | Millcreek: Micro-surface treatment of 3900 South | — |
| Thu, Mar 25 | No vendor named: Capital Fund balance (approx.) | $5.80 million |
| Thu, Mar 25 | No vendor named: General Fund balance (approx.) | $5.00 million |
| Thu, Mar 11 | No vendor named: Outstanding road capital improvements cited by the mayor | $58.0 million |
| Thu, Mar 11 | State of Utah: County highway road funds, $300,000 a year for 15 years | $4.50 million |
| Thu, Mar 4 | State of Utah: Transportation funding, about $300,000 a year for 15 years | $4.50 million |
| Thu, Mar 4 | No vendor named: Annual cost of raccoon program (ended) | $7,000 |
| Thu, Feb 18 | No vendor named: Pickleball court acrylic overlay (estimate) | $15,000 |
| Thu, Feb 4 | No vendor named: Total proposed COVID-19 support (about) | $860,000 |
| Thu, Feb 4 | No vendor named: Holladay Bucks, about $15 per household (proposed) | $200,000 |
| Thu, Feb 4 | No vendor named: Rental assistance (proposed) | $130,000 |
| Thu, Feb 4 | No vendor named: Business grant per business, up to 100 businesses (proposed) | $5,000 |
| Thu, Jan 21 | Spohn Ranch: Skate park design-build | — |
| Thu, Jan 14 | No vendor named: CARES Act funds spent | $1.80 million |
| Thu, Jan 14 | No vendor named: Holladay's total share of community renewable energy program start-up costs (non-noticing about $18,775.45 plus noticing about $10,147.86) | $28,923.31 |
| Thu, Jan 7 | State Historic Preservation Office: Local government grant, up to $10,000 with 50/50 match (potential) | $10,000 |
| Thu, Nov 19 | Google Fiber: License to use city streets for internet service | — |
| Thu, Nov 5 | No vendor named: Retirement health savings plan, first year $12,000-$20,000, later about $5,000-$6,000 | — |
| Thu, Nov 5 | Google Fiber: Franchise-style fee offered at 2% of gross internet revenue (prior Utah agreements 5%) | — |
| Thu, Oct 15 | No vendor named: Estimated stormwater projects and compliance work needed | $18.0 million |
| Thu, Oct 1 | Salt Lake County: Second CARES Act distribution | $900,000 |
| Thu, Oct 1 | No vendor named: Bridge repair and maintenance (future capital budget amendment) | $150,000 |
| Thu, Sep 3 | Salt Lake County: Material costs for the pavement overlay program | $245,000 |
| Thu, Sep 3 | No vendor named: Repairs for concrete and planting at 6200 South island | $20,000 |
| Thu, Jul 16 | Salt Lake County: CARES Act funds, to be spent by end of September | $906,000 |
| Thu, Jul 16 | No vendor named: Business grant program placeholder (proposed) | $150,000 |
| Thu, Jul 16 | No vendor named: Hand sanitizer and masks for about 1,000 businesses (proposed) | $100,000 |
| Thu, Jul 16 | No vendor named: Staff time (proposed) | $87,000 |
| Thu, Jul 16 | No vendor named: Remote-work computers and phones (proposed) | $30,000 |
| Thu, Jul 16 | No vendor named: Bailiff services (proposed) | $30,000 |
| Thu, Jul 16 | No vendor named: COVID-19 related fees (proposed) | $25,000 |
| Thu, Jul 16 | No vendor named: Contingency (proposed) | $25,000 |
| Thu, Jul 16 | No vendor named: Live-streaming (proposed) | $20,000 |
| Thu, Jul 16 | No vendor named: City Hall physical improvements (proposed) | $14,000 |
| Thu, Jul 16 | No vendor named: Additional City Hall cleaning (proposed) | $12,000 |
| Thu, Jun 18 | Salt Lake County: CARES Act agreement (of which $50,000 used in FY2019-20) | $906,000 |
| Thu, Jun 18 | No vendor named: Fund balance use in the 2020-21 budget | $668,000 |
| Thu, Jun 18 | Wasatch Front Regional Council: Highland Drive improvement study | $183,000 |
| Thu, Jun 18 | No vendor named: City match for Highland Drive improvement study grant | $12,500 |
| Thu, Jun 18 | Salt Lake County: Stormwater public education agreement | $5,000 |
| Thu, Jun 4 | Unified Police Department: Police service ($3.8M precinct plus $1.5M shared) | $5.30 million |
| Thu, Jun 4 | Unified Fire Authority: Fire service (about 17% of budget) | $2.60 million |
| Thu, Jun 4 | Salt Lake County: Public works: snow removal, pavement, signals | $2.30 million |
| Thu, Jun 4 | No vendor named: Added fund balance use for raises and community group contributions | $34,000 |
| Thu, May 28 | Salt Lake County: CARES Act funds shared with the city (expected) | $900,000 |
| Thu, May 28 | No vendor named: 2% staff cost-of-living raise (proposed) | $35,000 |
| Thu, May 14 | No vendor named: Estimated bridge, road and sidewalk needs | $4.50 million |
| Thu, May 14 | No vendor named: Monthly stormwater fee of $6.50 with annual increases (proposed) | — |
| Thu, May 7 | Unified Police Department: Contract increase including 2.76% market and 2% merit raises | $276,000 |
| Thu, May 7 | No vendor named: Maintenance set-aside | $250,000 |
| Thu, May 7 | No vendor named: Skate park | $100,000 |
| Thu, May 7 | Salt Lake City: Half of repair costs for broken water pipes (about $100,000) | $100,000 |
| Thu, May 7 | No vendor named: Public works contract increase | $87,000 |
| Thu, May 7 | No vendor named: Arts fund match | $50,000 |
| Thu, May 7 | No vendor named: Holiday presence | $15,000 |
| Thu, May 7 | Unified Fire Authority: Fee increase | $1,500 |
| Thu, Apr 16 | No vendor named: Savings from bond refunding | $242,000 |
| Thu, Apr 16 | No vendor named: Slurry work to be postponed | $170,000 |
| Thu, Apr 2 | No vendor named: Projected savings from refunding the 2011 bond | $242,000 |
| Thu, Mar 12 | Zions Bank: Refunding of 2011 sales tax revenue bonds (estimated savings $175,000) | — |
| Thu, Mar 5 | No vendor named: Unspent City Hall terrace budget | $300,000 |
| Thu, Mar 5 | No vendor named: Public art payment to artists | $175,000 |
| Thu, Mar 5 | No vendor named: Landscaping budget that could fund design concepts for sculpture gardens or skate plazas | $35,000 |
| Thu, Mar 5 | No vendor named: Public art contingency | $25,000 |
| Thu, Feb 20 | Salt Lake County: TRCC funds for track lighting in City Hall | — |
| Thu, Feb 20 | Salt Lake County: TRCC funds for public art on the plaza | — |
| Thu, Feb 6 | Salt Lake County: Shared purchase of high-resolution aerial imagery | — |
| Thu, Jan 23 | No vendor named: Four left-turn lanes on Highland Drive (project allocation) | $3.00 million |