Contracts and spending
Who Holladay pays, for what, and how the vendor was chosen: every contract, bid award, change order, purchase, grant and land deal that came before the City Council, from the meeting minutes and packets.
- Contracts, purchases and land deals approved
- $12.0 million
- Line items
- 346
- Vendors
- 8
Every approval, newest first
| Date | Who and what | Amount |
|---|---|---|
| Thu, Aug 20 | FEMA: City Hall seismic retrofit grant; federal portion $1,275,000, local match required | $1.70 million |
| Thu, Aug 20 | No vendor named: Creative Aging grant application, up to | $3,000 |
| Thu, Aug 6 | Holladay Local Building Authority: Local Building Authority funding | $17.6 million |
| Thu, Aug 6 | No vendor named: Spring Lane Park option 1, full field renovation (about) | $9.10 million |
| Thu, Jul 16 | No vendor named: Spring Lane park estimate | $8.09 million |
| Thu, Jul 16 | Salt Lake County: Community-centered health programming, coming year (about) | $105,000 |
| Thu, Jul 16 | State Historic Preservation Office: Reconnaissance-level survey of 800 to 1,000 sites, 50% match | $15,000 |
| Thu, Jun 11 | Salt Lake County: Public works agreement fourth amendment | — |
| Thu, Jun 4 | No vendor named: City Hall refurbishment | $7.89 million |
| Thu, Jun 4 | No vendor named: Fund balance appropriation increase | $1.18 million |
| Thu, Jun 4 | No vendor named: Sales tax revenue increase | $220,000 |
| Thu, Jun 4 | No vendor named: Stormwater fee per equivalent residential unit from Jan. 1, 2027 (from $6.50) | $8 |
| Thu, May 21 | Salt Lake County: Recreation bond application for Spring Lane Park | $2.00 million |
| Thu, May 21 | Salt Lake County: TRCC application for Spring Lane Park | $1.00 million |
| Thu, May 21 | No vendor named: County public works contract increase | $311,000 |
| Thu, May 21 | No vendor named: Public works feasibility study | $50,000 |
| Thu, May 21 | Salt Lake County: TRCC tax act funds | — |
| Thu, May 14 | No vendor named: Projected fiscal 2026-27 expenditures | $50.4 million |
| Thu, May 14 | No vendor named: Local Building Authority projects: City Hall renovation and Spring Lane site | $15.0 million |
| Thu, May 14 | No vendor named: Personnel increase | $585,000 |
| Thu, May 14 | No vendor named: Debt service on the 2025 bond | $492,000 |
| Thu, May 14 | No vendor named: County public works contract increase | $311,000 |
| Thu, May 7 | No vendor named: Increase in police contract (about) | $310,000 |
| Thu, May 7 | No vendor named: Increase in public works contract (about) | $310,000 |
| Thu, Apr 23 | No vendor named: Estimated first-notice costs | $19,000 |
| Thu, Apr 23 | Knudsen family: Arch-style entrance sign donation | $18,000 |
| Thu, Apr 23 | Salt Lake Chamber: Membership proposed | $1,500 |
| Thu, Mar 19 | No vendor named: City Hall auditorium improvements | $730,000 |
| Thu, Mar 19 | No vendor named: Transportation and Land Use Connection grant, 3900 South and Highland Drive redevelopment study | $180,000 |
| Thu, Mar 19 | No vendor named: Estimated cost per bus stop including masonry | $20,000 |
| Thu, Mar 19 | Knudsen family: Donated entrance sign (value) | $18,000 |
| Thu, Mar 19 | No vendor named: Installation, at least | $12,000 |
| Thu, Mar 5 | No vendor named: General Fund appropriated fund balance increase | $226,252 |
| Thu, Mar 5 | Holladay Local Building Authority: Transfer for 2025 lease revenue bond (City Hall renovation and Spring Lane) | $201,150 |
| Thu, Mar 5 | No vendor named: Replacement software, at least | $70,000 |
| Thu, Mar 5 | No vendor named: Building inspection contract increase | $40,000 |
| Thu, Mar 5 | Salt Lake County: Holladay skate park | — |
| Thu, Feb 19 | No vendor named: Spring Lane park phase one estimate | $3.80 million |
| Thu, Feb 19 | Family donor: Donation for naming rights, southwest baseball field, 10 years | $25,000 |
| Thu, Jan 22 | No vendor named: House homeland security appropriation earmark for Holladay | $1.76 million |
| Thu, Jan 22 | No vendor named: Projected expenses for proposed June 2026 production | $51,000 |
| Thu, Jan 22 | Family donor: Donation toward ten-year ball field maintenance (estimated $38,000) | $25,000 |
| Thu, Jan 8 | No vendor named: Highland Drive secured funding; gap about $15 million | $7.00 million |
| Thu, Jan 8 | No vendor named: Senate proposal for City Hall retrofit earmark | $1.65 million |
| Thu, Jan 8 | No vendor named: 5600 South sidewalk (TAP grant), total cost; city share about $300,000 | $525,000 |
| Thu, Jan 8 | Woodbury Corporation: Temporary City Hall lease, 18 months; base rent slightly under $8 per square foot plus about $4 per square foot in other charges | — |
| Thu, Dec 18 | KMW Development, LLC: Restricted city loan, forgiven as affordable units are built and deed-restricted | $2.50 million |
| Thu, Dec 11 | No vendor named: Restricted city loan item in affordable housing agreement | $2.50 million |
| Thu, Dec 11 | No vendor named: Millrock project area funds that must be spent by May 1, 2029 | $2.00 million |
| Thu, Dec 4 | No vendor named: County housing rehabilitation match | $10,160 |
| Thu, Nov 20 | State of Utah: Highland Drive improvements, Van Winkle to Arbor Lane (HB 488) | $1.23 million |
| Thu, Nov 20 | Salt Lake County: Housing rehabilitation loan program | $220,000 |
| Thu, Nov 20 | No vendor named: Transfer for 6200 South UDOT-grant project non-reimbursable costs | $45,205 |
| Thu, Nov 20 | No vendor named: City match for housing rehabilitation | $10,160 |
| Thu, Nov 20 | No vendor named: Highland Drive regional safety audit transfer | $5,091 |
| Thu, Nov 20 | Salt Lake County: CDBG home repair loan program | — |
| Thu, Nov 20 | NeighborWorks: Administration of housing programs | — |
| Thu, Nov 6 | No vendor named: RDA contribution proposed for affordable housing at Holladay Hills | $2.50 million |
| Thu, Nov 6 | No vendor named: Shared prosecution budget | $315,000 |
| Thu, Nov 6 | No vendor named: Proposed convenience store license fee (from $1,750) | $12,247 |
| Thu, Nov 6 | Brighton: Justice court services | — |
| Thu, Oct 2 | Knudsen family: Donated aluminum entrance sign (about) | $18,000 |
| Thu, Oct 2 | No vendor named: Engineering to secure the sign, estimated under this amount | $5,000 |
| Thu, Sep 18 | Holladay Local Building Authority: Not more than $11.5 million lease revenue bonds for City Hall, park and recreation facility, other facilities, reserve and issuance costs; $10.2 to $10.3 million expected to be used | $11.5 million |
| Thu, Sep 18 | Holladay Local Building Authority: Not more than $11.5 million; maximum rate 6.5%, 25 years | $11.5 million |
| Thu, Aug 28 | No vendor named: City Hall upgrade estimate | $9.70 million |
| Thu, Aug 28 | No vendor named: Spring Lane estimate | $9.00 million |
| Thu, Aug 28 | No vendor named: Community Project Fund earmark, not yet approved | $1.70 million |
| Thu, Aug 7 | No vendor named: Option B bond in 2026 | $10.1 million |
| Thu, Aug 7 | No vendor named: Highland Drive bridge | $7.10 million |
| Thu, Aug 7 | No vendor named: Option A bond in 2026 | $6.60 million |
| Thu, Aug 7 | Granite School District: Total lease payments over 30 years (about) | $1.50 million |
| Thu, Aug 7 | UDOT: Safe Sidewalks, 4500 South phase II; 25% city match | $200,000 |
| Thu, Aug 7 | Hansen Law: Escalator increase this year (about); shared with Millcreek and Cottonwood Heights | $10,000 |
| Thu, Aug 7 | Salt Lake County: Historical markers | — |
| Thu, Aug 7 | Stowell Crayk: Indigent defense; primary rate from $150 to $200 | — |
| Thu, Jul 17 | Salt Lake County Health Department: Public health program, initial grant (about) | $76,000 |
| Thu, Jul 17 | Salt Lake County Health Department: Increase after milestones met | $35,000 |
| Thu, Jul 17 | No vendor named: Proposed bike lane marking and parking changes, mainly Holladay Boulevard | $30,000 |
| Thu, Jul 17 | Central Wasatch Commission: Membership; roughly $25,000 was discussed at an earlier meeting but no amount is stated in these minutes | — |
| Thu, Jun 12 | No vendor named: Increment cap for the Cottonwood Mall project area | $122.5 million |
| Thu, Jun 12 | No vendor named: Federal request for City Hall and Spring Lane project | $2.00 million |
| Thu, Jun 12 | Salt Lake County: Public works services, increase slightly under 3% | — |
| Thu, Jun 5 | No vendor named: Paving | $500,000 |
| Thu, Jun 5 | No vendor named: Fund balance contribution | $412,362 |
| Thu, Jun 5 | No vendor named: Murray Holladay Road signal | $350,000 |
| Thu, Jun 5 | No vendor named: Knudsen Park expansion | $150,000 |
| Thu, Jun 5 | No vendor named: Vehicle replacement | $120,000 |
| Thu, May 15 | No vendor named: Federal funding for Highland Drive | $3.60 million |
| Thu, May 15 | Salt Lake County: Rooted Together history project | $600,000 |
| Thu, May 15 | No vendor named: CDBG housing rehabilitation application | $220,000 |
| Thu, May 15 | Salt Lake County: Community-centered health programming | — |
| Thu, May 8 | No vendor named: Paving | $565,000 |
| Thu, May 8 | No vendor named: Knudsen Park expansion | $150,000 |
| Thu, May 8 | No vendor named: Vehicle replacement | $120,000 |
| Thu, May 8 | No vendor named: Curb and gutter | $100,000 |
| Thu, May 8 | No vendor named: Public works contract increase | $90,513 |
| Thu, May 8 | No vendor named: 3% cost-of-living adjustment | $72,559 |
| Thu, May 8 | No vendor named: Proposed stormwater fee per unit under scenario 2 | $9 |
| Thu, May 8 | No vendor named: Current monthly stormwater fee per equivalent residential unit | $7 |
| Thu, May 1 | Central Wasatch Commission: Roughly $25,000 initial membership fee discussed | $25,000 |
| Thu, Apr 17 | No vendor named: Federal Community Project Fund request for City Hall | $2.00 million |
| Thu, Apr 17 | No vendor named: Police services increase | $406,384 |
| Thu, Apr 17 | No vendor named: UDOT Safe Sidewalks, 4500 South phase two, up to | $200,000 |
| Thu, Apr 17 | No vendor named: Unified Fire Authority increase | $126,242 |
| Thu, Apr 17 | Salt Lake County: Election services | — |
| Thu, Apr 17 | Salt Lake County: Traffic signal installation | — |
| Thu, Apr 17 | Salt Lake County: TRCC grant reimbursement, City Hall auditorium renovation | — |
| Thu, Mar 20 | No vendor named: Revised Highland Drive estimate with undergrounding | $49.4 million |
| Thu, Mar 20 | Wasatch Front Regional Council: Pending grant application for Highland Drive | $5.00 million |
| Thu, Mar 20 | No vendor named: Murray Holladay Road signal reconstruction; developer to repay | $350,000 |
| Thu, Mar 20 | Cottonwood Heights: Justice court services interlocal agreement | — |
| Thu, Mar 20 | Sheryl Gillilan: Public art consultant | — |
| Thu, Mar 6 | No vendor named: Capital projects interest increase | $550,000 |
| Thu, Mar 6 | No vendor named: Murray Holladay Road signal reconstruction near Royal Holladay Hills; capital funds advance the work with repayment from increment | $350,000 |
| Thu, Mar 6 | No vendor named: Stormwater fund balance increase | $330,299 |
| Thu, Mar 6 | No vendor named: Two part-time positions, from fund balance | $44,311 |
| Thu, Mar 6 | Salt Lake County: TRCC grant for City Hall auditorium renovation design study | $22,500 |
| Thu, Feb 6 | No vendor named: Phase 3 sidewalk extension, applicant estimate | $120,000 |
| Thu, Feb 6 | No vendor named: Phase 1 restriping, applicant estimate | $25,000 |
| Thu, Feb 6 | No vendor named: Phase 2 sidewalk start, applicant estimate, to be covered by a bond | $5,000 |
| Thu, Jan 9 | No vendor named: Estimated cost of Highland Drive reconstruction, stated as "up to $30 million or more" | $30.0 million |
| Thu, Jan 9 | No vendor named: Estimated cost of City Hall seismic retrofit | $10.0 million |
| Thu, Dec 12 | No vendor named: Proposed CDBG application for home repair loans of up to $25,000 | $200,000 |
| Thu, Dec 12 | No vendor named: Application fees, about $1,300 each (about $10,000 to $11,000) | $10,000 |
| Thu, Nov 7 | No vendor named: City Hall renovation estimate | $7.90 million |
| Thu, Nov 7 | No vendor named: Spring Lane park estimate in most scenarios | $7.50 million |
| Thu, Nov 7 | No vendor named: Bond in Scenario 1 | $4.00 million |
| Thu, Oct 24 | Unified Police Department: Projected added cost to base police contract from crossing guard error | $65,000 |
| Thu, Oct 24 | Wasatch Front Waste and Recycling: Proposed monthly household fee, up from $19.50 | $26 |
| Thu, Sep 5 | No vendor named: Corrugated metal pipe liner rehabilitation | $2.50 million |
| Thu, Sep 5 | No vendor named: Extended park restroom season | $700 |
| Thu, Aug 22 | Millcreek City: Wasatch Boulevard project (Holladay portion about $600,000) | $5.00 million |
| Thu, Aug 22 | No vendor named: Requested city share of burying overhead power lines (total about $130,000) | $65,000 |
| Thu, Aug 22 | Salt Lake County: Orthorectified aerial imagery | $1,095 |
| Thu, Jul 11 | No vendor named: Congressional earmark for City Hall seismic work, reduced from $2 million | $1.70 million |
| Thu, Jul 11 | Salt Lake County: Annual snow plow service for eight routes | $465,700 |
| Thu, Jul 11 | No vendor named: Phase I parking overlay | $123,656 |
| Thu, Jul 11 | Salt Lake County Health Department: Opioid-related grant award, renewable twice | $72,185 |
| Thu, Jul 11 | Millcreek City: Multi-jurisdictional building inspections | — |
| Thu, Jun 6 | Unified Police Department: Holladay total police cost, a 10.43% increase | $7.91 million |
| Thu, Jun 6 | No vendor named: Indicated federal earmark for City Hall seismic reinforcement | $2.00 million |
| Thu, Jun 6 | Salt Lake County Health Department: Opioid settlement funds | $72,185 |
| Thu, Jun 6 | No vendor named: Skate park lighting donations | $28,525 |
| Thu, May 16 | Unified Fire Authority: Capital fund transfer | $300,000 |
| Thu, May 16 | Salt Lake County: Property acquisition for Highland Drive corridor preservation | $64,000 |
| Thu, May 16 | BarX Group: Light pole reimbursement cap under Addendum 5 | $60,000 |
| Thu, May 9 | No vendor named: City Hall design | $350,000 |
| Thu, May 2 | No vendor named: Proposed 2024-25 general fund | $22.2 million |
| Thu, May 2 | No vendor named: Construction-only estimate for Spring Lane concepts, $8.3 million to $9 million | $9.00 million |
| Thu, Apr 11 | Salt Lake County: TRCC funding for sports lighting and replacing trellis columns with stone | $125,000 |
| Thu, Apr 11 | Salt Lake County Health Department: Opioid settlement grant for a part-time public health coordinator | $72,185 |
| Thu, Mar 21 | Utah Department of Transportation: Committed funding for the 3900 South trail | $10.0 million |
| Thu, Mar 7 | No vendor named: Parking garage hard costs | $51.0 million |
| Thu, Mar 7 | No vendor named: Federal earmark for Highland Drive (pending Senate approval) | $3.60 million |
| Thu, Mar 7 | No vendor named: State appropriation for Highland Drive | $1.23 million |
| Thu, Mar 7 | No vendor named: Safe Routes to School award for 2700 East Phase 2 (match required) | $700,000 |
| Thu, Mar 7 | Teleport Communications America, LLC: Franchise agreement | — |
| Thu, Feb 15 | No vendor named: Maximum bond issuance for the public infrastructure districts | $80.0 million |
| Thu, Feb 1 | No vendor named: New fire engine with 660-day lead time | $684,000 |
| Thu, Nov 16 | No vendor named: Capital projects fund balance for multiple expenses | $905,000 |
| Thu, Nov 16 | No vendor named: Holladay match for $6.7 million federal grant for the Highland Drive bridge | $480,000 |
| Thu, Nov 16 | No vendor named: Match for 2700 East sidewalk grant | $200,000 |
| Thu, Nov 16 | CCTM1, LLC: Third amendment to cell tower lease | — |
| Thu, Nov 2 | Salt Lake County: TRCC funding for the historic experience exhibit | $600,000 |
| Thu, Nov 2 | No vendor named: Corridor preservation request for 4500 South and Highland Drive | $64,000 |
| Thu, Nov 2 | Rocky Mountain Power: Third-party expertise payment and opt-out notice payment under the Community Renewable Energy Act | — |
| Thu, Oct 19 | Salt Lake County: TRCC application for skate park lighting and pillar replacement; $30,000 donated match | $120,000 |
| Thu, Oct 19 | No vendor named: Estimated opt-out notice cost for the community renewable energy program | $19,531 |
| Thu, Oct 5 | Horrocks Engineers: I-215 shared use path feasibility study | — |
| Thu, Sep 21 | No vendor named: Storm drain and lining projects, about $6.5 million | $6.50 million |
| Thu, Aug 17 | Utah Department of Transportation: Recommended funding for Highland Drive bridge repair | $7.10 million |
| Thu, Aug 17 | No vendor named: Bond proceeds available for City Hall work | $1.00 million |
| Thu, Aug 17 | No vendor named: General fund commitment in the historic exhibit grant application | $96,000 |
| Thu, Aug 17 | No vendor named: Conceptual work for Spring Lane Elementary, estimated $50,000 to $75,000 | $75,000 |
| Thu, Jul 13 | No vendor named: Subcommittee-recommended funding for Highland Drive pre-design and right-of-way | $3.60 million |
| Thu, Jul 13 | Salt Lake County: Wasatch Boulevard bike lanes, Holladay section | $600,000 |
| Thu, Jul 13 | Salt Lake County: Animal services | — |
| Thu, Jul 13 | Millcreek City: Reimburses half of HAWK signal costs under a separate agreement | — |
| Thu, Jun 15 | Salt Lake County: County award for Wasatch Boulevard improvements from 3300 South | $5.10 million |
| Thu, Jun 15 | Salt Lake County: TRCC application for parking, skate park lighting and trellis pillars | $180,000 |
| Thu, Jun 8 | No vendor named: Historical Commission museum project | $100,000 |
| Thu, Jun 8 | No vendor named: Summer concert series transfer to the Arts Council | $30,000 |
| Thu, Jun 8 | No vendor named: Tree Committee request | $10,000 |
| Thu, Jun 1 | Unified Fire Authority: Type 1 engine, one of three apparatus priced | $942,000 |
| Thu, Jun 1 | Unified Police Department: Holladay contribution to police general fund shortfall, in each of 2023 and 2024 | $154,000 |
| Thu, Jun 1 | No vendor named: Park pavilion deposit proposed for elimination | $50 |
| Thu, May 18 | Salt Lake County: Public services county contract, just under $2.8 million | $2.80 million |
| Thu, May 11 | Unified Police Department: Police services in the tentative budget (about 35% of total) | $7.10 million |
| Thu, May 11 | No vendor named: Second ARPA payment received in 2023 | $1.70 million |
| Thu, May 4 | No vendor named: Signal optimization application to the Wasatch Front Regional Council | $1.10 million |
| Thu, May 4 | Harper Precast: Concrete flood barriers at no charge except delivery and pickup fees | $0 |
| Thu, Apr 20 | No vendor named: Federal funding request for Highland Drive reconstruction | $3.60 million |
| Thu, Apr 6 | Salt Lake County: TRCC award for the Holladay City Park Historic Walk | $600,000 |
| Thu, Apr 6 | Salt Lake County: 2023 election services | — |
| Thu, Feb 2 | No vendor named: Budget amendment for the storm drainage property purchase, including closing and legal costs | $980,000 |
| Thu, Feb 2 | No vendor named: Requested direct state appropriation | $750,000 |
| Thu, Feb 2 | No vendor named: County-level award received | $600,000 |
| Thu, Feb 2 | No vendor named: Storm drainage property purchase on Holladay Boulevard | — |
| Thu, Jan 19 | No vendor named: Storm drainage property purchase (budget amendment) | $990,000 |
| Thu, Jan 19 | No vendor named: Development and fundraising services | $20,000 |
| Thu, Jan 19 | Zayo Group, LLC: Franchise agreement | — |
| Thu, Dec 8 | Pathway Associates: Ongoing development services at $3,000 per month (alternative: $1,600 one-time analysis) | $3,000 |
| Thu, Nov 17 | Salt Lake County: Public works services under a five-year interlocal agreement | $2.24 million |
| Thu, Nov 17 | No vendor named: Website redesign (estimate) | $53,000 |
| Thu, Nov 17 | Syringa Networks, LLC: Franchise telecommunications tax of 3.5% of gross receipts | — |
| Thu, Nov 3 | No vendor named: Replacement of the pedestrian bridge (estimate) | $7.00 million |
| Thu, Nov 3 | No vendor named: Immediate repairs to the pedestrian bridge (estimate) | $250,000 |
| Thu, Nov 3 | Pathway Associates: Development and fundraising services, about $3,000 per month | $36,000 |
| Thu, Nov 3 | Wasatch Front Waste and Recycling: Proposed $2.50 per month increase on a $17 monthly fee | — |
| Thu, Oct 6 | No vendor named: ADA ramp, high estimate of two options ($48,000 to $60,000) | $60,000 |
| Thu, Oct 6 | Salt Lake County: UPDES stormwater media campaign | — |
| Thu, Sep 8 | No vendor named: Remaining cost of skate park lighting | $75,000 |
| Thu, Sep 8 | No vendor named: Fourth of July celebration | $34,210 |
| Thu, Aug 18 | MGB+A and ECI: Canal trail feasibility study | $75,000 |
| Thu, Aug 18 | No vendor named: Xeriscaping of monument corners | $50,000 |
| Thu, Aug 18 | Spohn Ranch: Skate park lights, estimated $60,000 to $80,000 | — |
| Thu, Aug 11 | No vendor named: Application for matching museum grant requiring a $250,000 city match | $750,000 |
| Thu, Aug 11 | No vendor named: Museum concept study | $25,000 |
| Thu, Jul 14 | Salt Lake County: Aerial photography interlocal agreement | — |
| Thu, Jun 16 | No vendor named: Stormwater fund bond proceeds added to the 2021-22 budget | $10.0 million |
| Thu, Jun 16 | Millcreek City: Utility boxes, covers and concrete collars on Murray Holladay Road | — |
| Thu, Jun 2 | Unified Fire Authority: Holladay member fee | $2.73 million |
| Thu, Jun 2 | Historical Commission: Requested increase, bringing its total to $5,000 | $4,000 |
| Thu, May 19 | No vendor named: Construction proceeds from Series 2022 sales tax revenue bonds | $18.0 million |
| Thu, May 12 | Unified Police Department: Draft Holladay precinct budget | $5.20 million |
| Thu, May 5 | No vendor named: Proposed 2022-23 General Fund | $22.7 million |
| Thu, May 5 | No vendor named: One-time federal funding recognized in the tentative budget | $1.80 million |
| Thu, May 5 | No vendor named: City assessment for the community renewable energy program (half paid February 2022) | $18,000 |
| Thu, Apr 21 | KMW Development, LLC: Site development agreement with the Redevelopment Agency | — |
| Thu, Apr 21 | KMW Development, LLC: Agreement for Development of Land with the Redevelopment Agency | — |
| Thu, Apr 14 | No vendor named: Maximum authorized sales tax revenue bonds | $19.0 million |
| Thu, Mar 17 | No vendor named: Maximum par amount of Series 2022 sales tax revenue bonds for road, stormwater and related projects | $19.0 million |
| Thu, Mar 17 | No vendor named: Active transportation feasibility study along I-215 | $70,000 |
| Thu, Mar 3 | No vendor named: Holla Dollars approved budget | $450,000 |
| Thu, Mar 3 | No vendor named: Holla Dollars program cost | $32,154 |
| Thu, Feb 17 | No vendor named: Prior analysis of borrowing now cited by Council Member Gibbons | $8.00 million |
| Thu, Feb 17 | No vendor named: Assumed storm drain debt in 2022 (model) | $5.00 million |
| Thu, Feb 10 | No vendor named: ARPA funds for playground accessibility surface | $300,000 |
| Thu, Feb 10 | No vendor named: Playground surface project full estimate | $285,000 |
| Thu, Feb 10 | No vendor named: Quarterly mileage allowance per council member | $75 |
| Thu, Jan 20 | No vendor named: ARPA funds expected | $3.60 million |
| Thu, Jan 20 | No vendor named: Cottonwood Mall roadway reimbursement | $2.50 million |
| Thu, Jan 20 | No vendor named: Holladay Village tax increment to date | $500,000 |
| Thu, Jan 20 | No vendor named: Accessible playground surface project (total estimate) | $285,000 |
| Thu, Jan 6 | Salt Lake County: Restated TRCC agreement for public art; city match $50,000; completion by December 2022 | $50,000 |
| Thu, Jan 6 | State of Utah: Museum feasibility study (to be completed by June 30) | $25,000 |
| Thu, Nov 18 | Rocky Mountain Power: Collection of the stormwater fee on utility bills | — |
| Thu, Oct 14 | Unified Fire Service Area: Seismic upgrades to Station 104 | — |
| Thu, Aug 26 | Cottonwood Heights: Court services agreement amendment | — |
| Thu, Jun 17 | Salt Lake County: Public works interlocal agreement | — |
| Thu, Jun 17 | Salt Lake County: Animal control services, Amendment #3 | — |
| Thu, Jun 17 | Salt Lake County: Aerial photography interlocal agreement | — |
| Thu, May 20 | No vendor named: Bond for road work if the tax increase passes (10 years or less) | $8.00 million |
| Thu, May 20 | No vendor named: Pavement and overlay program | $7.20 million |
| Thu, May 20 | Unified Police Department: Holladay's total 2021-22 police cost (up 6.82%) | $5.56 million |
| Thu, May 20 | Unified Fire Authority: Net 2021-22 member fee after $11,461 credit | $2.62 million |
| Thu, May 20 | No vendor named: Transfer to Capital Projects Fund | $1.00 million |
| Thu, May 20 | No vendor named: Rubberized playground surface at City Park | $115,000 |
| Thu, May 20 | No vendor named: Four city center crosswalks, about $25,000 each | $100,000 |
| Thu, May 20 | FirstDigital Telecom, LLC: Franchise agreement for use of city streets | — |
| Thu, May 13 | No vendor named: Roads capital | $7.20 million |
| Thu, May 13 | No vendor named: Additional federal funds expected (minutes also cite $3.8 million) | $3.38 million |
| Thu, May 13 | No vendor named: Property tax increase revenue | $2.30 million |
| Thu, May 13 | No vendor named: Public works contract increase | $242,000 |
| Thu, May 13 | No vendor named: Accessible playground surface | $150,000 |
| Thu, May 13 | No vendor named: Signal optimization study | $120,000 |
| Thu, May 13 | No vendor named: Village Center pavers | $100,000 |
| Thu, May 13 | No vendor named: Federal lobbyist | $50,000 |
| Thu, May 13 | No vendor named: Arts Council summer concerts (requested) | $20,000 |
| Thu, May 6 | No vendor named: Added revenue from property tax increase (about) | $2.30 million |
| Thu, May 6 | No vendor named: Holla Dollars household vouchers | $451,000 |
| Thu, May 6 | No vendor named: Small business grants of up to $5,000 to about 45 businesses | $230,000 |
| Thu, Apr 8 | No vendor named: Road bond assumed in property tax model | $8.00 million |
| Thu, Apr 8 | No vendor named: Maximum estimated cost of traditional voting | $41,775 |
| Thu, Apr 8 | No vendor named: Holladay's estimated initial cost for the community renewable energy program | $28,923 |
| Thu, Apr 8 | No vendor named: Estimated cost of ranked-choice voting for the 2021 election | $25,289 |
| Thu, Apr 1 | No vendor named: Assumed bond in the property tax model | $7.00 million |
| Thu, Apr 1 | Millcreek: Micro-surface treatment of 3900 South | — |
| Thu, Mar 25 | No vendor named: Capital Fund balance (approx.) | $5.80 million |
| Thu, Mar 25 | No vendor named: General Fund balance (approx.) | $5.00 million |
| Thu, Mar 11 | No vendor named: Outstanding road capital improvements cited by the mayor | $58.0 million |
| Thu, Mar 11 | State of Utah: County highway road funds, $300,000 a year for 15 years | $4.50 million |
| Thu, Mar 4 | State of Utah: Transportation funding, about $300,000 a year for 15 years | $4.50 million |
| Thu, Mar 4 | No vendor named: Annual cost of raccoon program (ended) | $7,000 |
| Thu, Feb 18 | No vendor named: Pickleball court acrylic overlay (estimate) | $15,000 |
| Thu, Feb 4 | No vendor named: Total proposed COVID-19 support (about) | $860,000 |
| Thu, Feb 4 | No vendor named: Holladay Bucks, about $15 per household (proposed) | $200,000 |
| Thu, Feb 4 | No vendor named: Rental assistance (proposed) | $130,000 |
| Thu, Feb 4 | No vendor named: Business grant per business, up to 100 businesses (proposed) | $5,000 |
| Thu, Jan 21 | Spohn Ranch: Skate park design-build | — |
| Thu, Jan 14 | No vendor named: CARES Act funds spent | $1.80 million |
| Thu, Jan 14 | No vendor named: Holladay's total share of community renewable energy program start-up costs (non-noticing about $18,775.45 plus noticing about $10,147.86) | $28,923 |
| Thu, Jan 7 | State Historic Preservation Office: Local government grant, up to $10,000 with 50/50 match (potential) | $10,000 |
| Thu, Nov 19 | Google Fiber: License to use city streets for internet service | — |
| Thu, Nov 5 | No vendor named: Retirement health savings plan, first year $12,000-$20,000, later about $5,000-$6,000 | — |
| Thu, Nov 5 | Google Fiber: Franchise-style fee offered at 2% of gross internet revenue (prior Utah agreements 5%) | — |
| Thu, Oct 15 | No vendor named: Estimated stormwater projects and compliance work needed | $18.0 million |
| Thu, Oct 1 | Salt Lake County: Second CARES Act distribution | $900,000 |
| Thu, Oct 1 | No vendor named: Bridge repair and maintenance (future capital budget amendment) | $150,000 |
| Thu, Sep 3 | Salt Lake County: Material costs for the pavement overlay program | $245,000 |
| Thu, Sep 3 | No vendor named: Repairs for concrete and planting at 6200 South island | $20,000 |
| Thu, Jul 16 | Salt Lake County: CARES Act funds, to be spent by end of September | $906,000 |
| Thu, Jul 16 | No vendor named: Business grant program placeholder (proposed) | $150,000 |
| Thu, Jul 16 | No vendor named: Hand sanitizer and masks for about 1,000 businesses (proposed) | $100,000 |
| Thu, Jul 16 | No vendor named: Staff time (proposed) | $87,000 |
| Thu, Jul 16 | No vendor named: Remote-work computers and phones (proposed) | $30,000 |
| Thu, Jul 16 | No vendor named: Bailiff services (proposed) | $30,000 |
| Thu, Jul 16 | No vendor named: COVID-19 related fees (proposed) | $25,000 |
| Thu, Jul 16 | No vendor named: Contingency (proposed) | $25,000 |
| Thu, Jul 16 | No vendor named: Live-streaming (proposed) | $20,000 |
| Thu, Jul 16 | No vendor named: City Hall physical improvements (proposed) | $14,000 |
| Thu, Jul 16 | No vendor named: Additional City Hall cleaning (proposed) | $12,000 |
| Thu, Jun 18 | Salt Lake County: CARES Act agreement (of which $50,000 used in FY2019-20) | $906,000 |
| Thu, Jun 18 | No vendor named: Fund balance use in the 2020-21 budget | $668,000 |
| Thu, Jun 18 | Wasatch Front Regional Council: Highland Drive improvement study | $183,000 |
| Thu, Jun 18 | No vendor named: City match for Highland Drive improvement study grant | $12,500 |
| Thu, Jun 18 | Salt Lake County: Stormwater public education agreement | $5,000 |
| Thu, Jun 4 | Unified Police Department: Police service ($3.8M precinct plus $1.5M shared) | $5.30 million |
| Thu, Jun 4 | Unified Fire Authority: Fire service (about 17% of budget) | $2.60 million |
| Thu, Jun 4 | Salt Lake County: Public works: snow removal, pavement, signals | $2.30 million |
| Thu, Jun 4 | No vendor named: Added fund balance use for raises and community group contributions | $34,000 |
| Thu, May 28 | Salt Lake County: CARES Act funds shared with the city (expected) | $900,000 |
| Thu, May 28 | No vendor named: 2% staff cost-of-living raise (proposed) | $35,000 |
| Thu, May 14 | No vendor named: Estimated bridge, road and sidewalk needs | $4.50 million |
| Thu, May 14 | No vendor named: Monthly stormwater fee of $6.50 with annual increases (proposed) | — |
| Thu, May 7 | Unified Police Department: Contract increase including 2.76% market and 2% merit raises | $276,000 |
| Thu, May 7 | No vendor named: Maintenance set-aside | $250,000 |
| Thu, May 7 | No vendor named: Skate park | $100,000 |
| Thu, May 7 | Salt Lake City: Half of repair costs for broken water pipes (about $100,000) | $100,000 |
| Thu, May 7 | No vendor named: Public works contract increase | $87,000 |
| Thu, May 7 | No vendor named: Arts fund match | $50,000 |
| Thu, May 7 | No vendor named: Holiday presence | $15,000 |
| Thu, May 7 | Unified Fire Authority: Fee increase | $1,500 |
| Thu, Apr 16 | No vendor named: Savings from bond refunding | $242,000 |
| Thu, Apr 16 | No vendor named: Slurry work to be postponed | $170,000 |
| Thu, Apr 2 | No vendor named: Projected savings from refunding the 2011 bond | $242,000 |
| Thu, Mar 12 | Zions Bank: Refunding of 2011 sales tax revenue bonds (estimated savings $175,000) | — |
| Thu, Mar 5 | No vendor named: Unspent City Hall terrace budget | $300,000 |
| Thu, Mar 5 | No vendor named: Public art payment to artists | $175,000 |
| Thu, Mar 5 | No vendor named: Landscaping budget that could fund design concepts for sculpture gardens or skate plazas | $35,000 |
| Thu, Mar 5 | No vendor named: Public art contingency | $25,000 |
| Thu, Feb 20 | Salt Lake County: TRCC funds for track lighting in City Hall | — |
| Thu, Feb 20 | Salt Lake County: TRCC funds for public art on the plaza | — |
| Thu, Feb 6 | Salt Lake County: Shared purchase of high-resolution aerial imagery | — |
| Thu, Jan 23 | No vendor named: Four left-turn lanes on Highland Drive (project allocation) | $3.00 million |