Lehi development tracker

Point of the Mountain transit (Draper to Lehi)

UDOT and UTA studied high-capacity transit between Draper and Lehi, with up to 11 stations and supporting facilities; the June 2025 draft identified light rail as the proposed solution. The environmental study was completed Jan. 13, 2026 and a Record of Decision was issued. Next step is planning, with the project added to the Statewide Transportation Improvement Program; no construction schedule or cost is posted.

Approved

Type
Road project
Run by
UDOT and UTA
Location
High-capacity transit corridor from Draper to Lehi with up to 11 stations
  1. Jan 13, 2026Environmental study complete; Record of Decision issued.
  2. May 25, 2021City Council: Resolution 2021-34: support for the Point of the Mountain Transit locally preferred alternative
  3. Mar 23, 2021City Council: Point of the Mountain and Central Corridor transit studies (pre-council)

In brief

Point of the Mountain transit (Draper to Lehi) appears on 2 recorded agendas, from the City Council meeting of March 23, 2021 to the City Council meeting of May 25, 2021.

On record, it was approved once.

The most recent decision was approved (4-0) at the City Council meeting of May 25, 2021.

Updates

  1. January 13, 2026

    Environmental study complete; Record of Decision issued. Source

Follow the money and project delivery

Point of the Mountain transit (Draper to Lehi)

Approved

  1. Council action

    Approved: Resolution 2021-34: support for the Point of the Mountain Transit locally preferred alternative · Approved minutes Record → · May 25, 2021

  2. Money in the record

    No itemized amount linked in the records collected.

  3. Signed agreement and payments

    Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.

  4. Work and operating costs

    Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →

Every hearing and vote

  1. May 25, 2021 · City Council

    Resolution 2021-34: support for the Point of the Mountain Transit locally preferred alternative

    Approved · 4-0

    UTA's Patti Garver said the bus rapid transit alignment at the Point of the Mountain has been selected and the next step is the environmental study and preliminary engineering. The council supported the alternative as presented in the resolution distributed at the meeting.

    Moved by Council Member Condie, seconded by Council Member Hancock. Vote: 4-0; unanimous (Mayor Mark Johnson excused; Mayor Pro Tempore Mike Southwick presided)

  2. March 23, 2021 · City Council

    Point of the Mountain and Central Corridor transit studies (pre-council)

    Discussed

    UTA staff described studies of light rail and bus rapid transit options in Utah County. Eric Rasband said bus rapid transit could use the UTA freight corridor right of way with stations at 2100 North, south Triumph and SR-92, and that MAG helped fund the environmental study. UTA said BRT is easier and quicker to build.