Point of the Mountain transit (Draper to Lehi)
UDOT and UTA studied high-capacity transit between Draper and Lehi, with up to 11 stations and supporting facilities; the June 2025 draft identified light rail as the proposed solution. The environmental study was completed Jan. 13, 2026 and a Record of Decision was issued. Next step is planning, with the project added to the Statewide Transportation Improvement Program; no construction schedule or cost is posted.
Approved
- Type
- Road project
- Run by
- UDOT and UTA
- Location
- High-capacity transit corridor from Draper to Lehi with up to 11 stations
- Environmental study complete; Record of Decision issued.
- City Council: Resolution 2021-34: support for the Point of the Mountain Transit locally preferred alternative
- City Council: Point of the Mountain and Central Corridor transit studies (pre-council)
In brief
Point of the Mountain transit (Draper to Lehi) appears on 2 recorded agendas, from the City Council meeting of March 23, 2021 to the City Council meeting of May 25, 2021.
On record, it was approved once.
The most recent decision was approved (4-0) at the City Council meeting of May 25, 2021.
Updates
January 13, 2026
Environmental study complete; Record of Decision issued. Source
Follow the money and project delivery
Point of the Mountain transit (Draper to Lehi)
- Council action
Approved: Resolution 2021-34: support for the Point of the Mountain Transit locally preferred alternative · Approved minutes Record → · May 25, 2021
- Money in the record
No itemized amount linked in the records collected.
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
May 25, 2021 · City Council
Resolution 2021-34: support for the Point of the Mountain Transit locally preferred alternative
Approved · 4-0
UTA's Patti Garver said the bus rapid transit alignment at the Point of the Mountain has been selected and the next step is the environmental study and preliminary engineering. The council supported the alternative as presented in the resolution distributed at the meeting.
March 23, 2021 · City Council
Point of the Mountain and Central Corridor transit studies (pre-council)
Discussed
UTA staff described studies of light rail and bus rapid transit options in Utah County. Eric Rasband said bus rapid transit could use the UTA freight corridor right of way with stations at 2100 North, south Triumph and SR-92, and that MAG helped fund the environmental study. UTA said BRT is easier and quicker to build.