Stadion master infrastructure agreement (Meta)
A master infrastructure agreement with Stadion, LLC under which Meta reimburses the city about $1.8 million for water infrastructure, road improvements and staffing help, with the city prioritizing resurfacing of Pony Express Parkway before December 2024. Approved 5-0 on July 19, 2022 with the booster pump completion date moved to December 31, 2022.
- Where it stands
- Approved
- Type
- Development agreement
- Applicant
- Stadion, LLC
Every hearing and vote
July 19, 2022 · City Council
Master infrastructure agreement, Stadion, LLC
Approved with conditions · 5-0
Staff said Meta would reimburse the city about $1.8 million for water infrastructure, road improvements and up to two years of staffing help, including the reuse filtration system and the Cory Wride Park booster pump station. In exchange the city would prioritize resurfacing Pony Express Parkway before December 2024, with Google covering part of that cost. Staff asked to move the booster pump completion date from October 31 to December 31, 2022. The council approved the agreement with the December 31 date; the minutes word the item both as the booster pump station and as the booster infiltration portion.
May 6, 2025 · City Council
Meta site road completion and cross-section adjustment
Approved with conditions · 4-0
City Engineer Vince Hogge said Meta will finish roads on its industrial site along the north and west boundaries within 77-foot minor collector rights-of-way. Adjustments approved: sidewalk reduced from 8 feet to 5 feet, the parking lane changed to a 12-foot drive lane, a 1-foot buffer at the property line and an 8-foot park strip used as a drainage swale.
October 21, 2025 · City Council
Development agreement with Stadion, LLC (Meta) for data center expansion
Approved · 4-1
Draper said the agreement allows the data center to expand onto the adjacent property to the south, which already has the RTI overlay, sets infrastructure requirements and is largely modeled on the existing agreement. No reason for Burnham's no vote is recorded.
- Applicant: Stadion, LLC (Meta)
March 3, 2026 · City Council
Development agreement with Williams (Will-Power UT, LLC) for a natural gas power facility
Approved with conditions · 5-0
City Attorney Marcus Draper presented a co-located natural gas power facility on the Stadion parcel supporting the Meta data center expansion. Requested exceptions included sound up to 75 decibels (the nighttime limit is 65) and above-ground distribution lines. A Williams representative responded. The council approved with conditions: simple-cycle natural gas technology only, additional property limited to the Stadion LLC parcel under the October 2025 agreement, operation within five years with possible extension, and trees along Pony Express Parkway under city code 16.35.080. Public commenters opposed the plant over emissions, noise and its location.
- Applicant: Williams (Will-Power UT, LLC)
- Exceptions: sound up to 75 dB (night limit 65 dB); above-ground distribution lines
July 21, 2026 · City Council
Consent agenda: bond releases, animal services board seat, Stadion amendment, Brylee townhomes amendment and off-street trails master plan
Approved · 5-0
Items were Brylee North Plat A and Pacific Springs Phase A Plat 5 bond releases (out of warranty); a member representative to the North Utah Valley Animal Services board; a first amendment to the Stadion development agreement; a first amendment to the Brylee Townhomes Phase B development agreement, which the July 7 work session described as replacing required three-story townhomes with two-story; and an ordinance approving the Off-Street Trails Master Plan. The motion included spelling corrections to minutes discussed in the work session.