American Fork development tracker

Upper pressurized irrigation pond joint repair

Repair of broken waterproof joints in the upper pressurized-irrigation pond, with waterproofing to limit future cracking. Staff recommends the low responsive bid, Dennis Lierd II Construction at $68,713.50 on bids opened Oct. 5, 2026, plus a separate $7,000 construction and engineering contingency that the city would hold. The packet says substantial completion is due Dec. 3, 2026; its blank notice-to-proceed form sets all work for Dec. 17, 2026. The money comes from the previously approved irrigation improvements budget. On Oct. 13, 2026 the council awarded the contract to Dennis Lierd II Construction for $68,713.50 plus the $7,000 contingency, 5-0. An unsigned form is not a work order, and actual completion has not been confirmed.

ApprovedStatus as of Oct 13, 2026

Type
Road project
Location
Upper PI pond
Applicant
American Fork City
  1. Oct 13, 2026Council awarded the Upper PI pond joint repair to Dennis Lierd II Construction, $68,713.50 plus a $7,000 co…
  2. Oct 13, 2026City Council: Upper PI pond joint repair, Dennis Lierd II Construction

In brief

Upper pressurized irrigation pond joint repair appears on one recorded agenda: the City Council meeting of October 13, 2026.

On record, it was approved once.

The most recent decision was approved (5-0) at the City Council meeting of October 13, 2026.

Updates

  1. October 13, 2026

    Council awarded the Upper PI pond joint repair to Dennis Lierd II Construction, $68,713.50 plus a $7,000 contingency, 5-0. Source

Follow the money and project delivery

Upper pressurized irrigation pond joint repair

Approved

  1. Council action

    Approved according to the dated project source. Record → · Oct. 13, 2026

  2. Money in the record

    contract: $68,713.50 — Upper PI Pond Joint Repair (PI2026001); budget: $7,000 — Contingency held by city Record → · Oct. 13, 2026

  3. Signed agreement and payments

    Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.

  4. Work and operating costs

    Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →

Every hearing and vote

  1. October 13, 2026 · City Council

    Upper PI pond joint repair, Dennis Lierd II Construction

    Approved · 5-0

    Award to low bidder Dennis Lierd II Construction for $68,713.50 plus a $7,000 contingency to repair cracked concrete joints and waterproof the upper pressurized irrigation pond, due Dec. 3, 2026, from the irrigation improvements budget. Public Works Director Sam Kelly said this repair replaces settled, cracked concrete lining and is separate from a transmission-line leak that still needs repair. The council also set aside a $7,000 construction and engineering contingency held by the city.

    • Bid/proposal tabulation: Low bid of 6: Dennis Lierd II $68,713.50; Pronghorn $83,494.45; Gerber $103,245; VanCon $144,900; FX Construction $212,290; Beck Construction non-responsive

    Moved by Taylor, seconded by John. Vote: 5-0