Upper pressurized irrigation pond joint repair
Repair of broken waterproof joints in the upper pressurized-irrigation pond, with waterproofing to limit future cracking. Staff recommends the low responsive bid, Dennis Lierd II Construction at $68,713.50 on bids opened Oct. 5, 2026, plus a separate $7,000 construction and engineering contingency that the city would hold. The packet says substantial completion is due Dec. 3, 2026; its blank notice-to-proceed form sets all work for Dec. 17, 2026. The money comes from the previously approved irrigation improvements budget. On Oct. 13, 2026 the council awarded the contract to Dennis Lierd II Construction for $68,713.50 plus the $7,000 contingency, 5-0. An unsigned form is not a work order, and actual completion has not been confirmed.
Approved
- Type
- Road project
- Location
- Upper PI pond
- Applicant
- American Fork City
- Council awarded the Upper PI pond joint repair to Dennis Lierd II Construction, $68,713.50 plus a $7,000 co…
- City Council: Upper PI pond joint repair, Dennis Lierd II Construction
In brief
Upper pressurized irrigation pond joint repair appears on one recorded agenda: the City Council meeting of October 13, 2026.
On record, it was approved once.
The most recent decision was approved (5-0) at the City Council meeting of October 13, 2026.
Updates
October 13, 2026
Council awarded the Upper PI pond joint repair to Dennis Lierd II Construction, $68,713.50 plus a $7,000 contingency, 5-0. Source
Follow the money and project delivery
Upper pressurized irrigation pond joint repair
- Council action
Approved according to the dated project source. Record → · Oct. 13, 2026
- Money in the record
contract: $68,713.50 — Upper PI Pond Joint Repair (PI2026001); budget: $7,000 — Contingency held by city Record → · Oct. 13, 2026
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
October 13, 2026 · City Council
Upper PI pond joint repair, Dennis Lierd II Construction
Approved · 5-0
Award to low bidder Dennis Lierd II Construction for $68,713.50 plus a $7,000 contingency to repair cracked concrete joints and waterproof the upper pressurized irrigation pond, due Dec. 3, 2026, from the irrigation improvements budget. Public Works Director Sam Kelly said this repair replaces settled, cracked concrete lining and is separate from a transmission-line leak that still needs repair. The council also set aside a $7,000 construction and engineering contingency held by the city.
- Bid/proposal tabulation: Low bid of 6: Dennis Lierd II $68,713.50; Pronghorn $83,494.45; Gerber $103,245; VanCon $144,900; FX Construction $212,290; Beck Construction non-responsive