Published by Paul Ivinskas · Politically neutral. No endorsements.
Tuesday, November 3, 2026

Utah, on the record.

Same sections for every candidate. Every fact linked to its source. How we stay neutral →

Lehi development tracker

Temple View Villas Plat B flag lot

Flag lot and two-lot preliminary subdivision in the RA-1 zone, each lot over half an acre. Part of moving the subdivision from five lots back toward the seven in its 2023 concept. Approved Aug. 13.

Approved

Type
Subdivision
Location
337 E. Ohana Way
Size
1.042 acres
Homes
2
Applicant
Brent Ventura

In brief

Temple View Villas Plat B flag lot appears on one recorded agenda: the Planning Commission meeting of August 13, 2026.

On record, it was approved once.

The most recent decision was approved at the Planning Commission meeting of August 13, 2026.

Follow the money and project delivery

Temple View Villas Plat B flag lot

Approved

  1. Council action

    No approval or denial linked in the records collected.

  2. Money in the record

    No itemized amount linked in the records collected.

  3. Signed agreement and payments

    Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.

  4. Work and operating costs

    Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →

Every hearing and vote

  1. August 13, 2026 · Planning Commission

    Temple View Villas Plat B flag lot, 337 E. Ohana Way

    Approved

    Brent Ventura sought flag lot conditional use and preliminary subdivision approval to split a 1.042-acre lot in the RA-1 zone into two lots, each over half an acre. The subdivision, approved in 2024 with five lots, would grow back toward the seven lots in the 2023 concept. The DRC required a complete redo of the power plan, along with sewer and water changes. Engage Lehi reports it was approved.

    • Applicant: Brent Ventura
    • Acres: 1.042
    • Zone: RA-1
    • Lots: 2 (each > 0.5 acre)
    • History: 2023 concept had 7 lots; 2024 preliminary approved 5