New park on 620 South
New neighborhood park (referred to in budget documents as Lakeview Park) on about 7 acres at the southeast corner of 620 South and 800 West, bordered on the east by the future 700 West extension, with a preliminary $4 million budget from park impact fees and $185,000 in PARC tax for a Phase 1 restroom and playground. Separately, the city annexed about 6.8 acres at about 700 West 620 South in spring 2026. Blu Line Designs was picked in July 2026 to design it; construction was projected for winter/spring 2027.
- Where it stands
- Proposed
- Type
- Public project
- Location
- 620 South
- Size
- 7 acres
- Applicant
- American Fork City
Every hearing and vote
September 3, 2024 · City Council work session
Parking agreements and landlord agreements in TOD area
Discussed
Public Works Director Sam Kelly said restriping 900 West to keep 26 feet clear for fire trucks would remove 35 stalls; options include alternating on-street parking, 28 stalls in open-space parcels (about $114,000) or 134 stalls ($402,000). The parcels are HOA open space over a TSSD easement, not city-owned. City Administrator David Bunker proposed barring future developments from charging residents for on-site parking and floated a small park on 620 South. Kelly planned microsurfacing this fall and chip seal in spring. The mayor said funding would come in next year's budget unless the council amends it.
- 900 West restriping: 35 stalls removed
- Option: 28 stalls in open space, ~$114,000
- Option: 134 stalls, ~$402,000
February 20, 2025 · City Council work session
FY2025 goals, capital and budget status
Discussed
Fiber mid-level design 80% done; police took the third floor of the police/courts building; city pursuing property for public works. City obtained title to a 30-acre parcel on the south side for a park. 200 South Phase I (Frontage Road to 570 West, with roundabout) complete, Phase II awaiting property acquisition; 300 West roundabout in design with resident traffic concerns noted; Auto Mall Drive connection in design; other road projects: 700 North connector, 1100 South 500 East roundabout, Lakeshore Drive, 1500 South 860 East signal and widening. 36-inch waterline and 100 East waterline complete; PI metering Phase 3 due May 2025. Revenue up about 7%, expenditures up about 12%. Debt: 2015/2016 PI GO bonds to FY2035; 2018 sales tax bond (Art Dye Park, cemetery) to FY2028; Station 52 GO bond to FY2038; 2020 water revenue bonds (36-inch line to TOD) to FY2052; 200 South tax increment bond to FY2047. PARC tax has brought in over $12 million since 2015.
February 19, 2026 · City Council work session
Fiscal 2026 capital project status
Discussed
Completed: Boat Harbor improvements, Rotary Park field lights and dugouts, Hindley and Monarch playgrounds, Robinson Park pavilion, 100 West improvement plan, Caveman Boulevard signal, right-of-way for the 200 South/300 West roundabout, Automall Drive connection. In progress: 620 South park design, 700 North right-of-way (close to an agreement with Mr. Bingham), Lakeshore Drive right-of-way, 1100 South/500 East roundabout, 1500 South/860 East signal and widening.
February 19, 2026 · City Council work session
Fiscal 2027 project proposals and priorities
Discussed
Fitness Center options from a 2022 VCBO study: 'must do' facelift with a 20,000-square-foot addition, a 90,000-square-foot 'better' option, or a 120,000-square-foot 'best' option with an indoor pool. Lakeview Park on 620 South: trail, restroom, pavilion, playground, pickleball/padel courts, dog park and parking, $3-4 million, partly impact fees. Slough Trail from Monarch Park south: $600,000-700,000. Lakeshore Drive to 1500 South: a three-lane collector just over a mile; first phase 26 feet of asphalt for about $3.1 million while TSSD installs sewer lines; the city is working with a church to obtain the last piece. 200 South interim improvements estimated at $24.7 million in 2022, with $8 million more for full build. 2026 road maintenance plan: $2.7 million. Pony Express Parkway: Phase 1 with $14.9 million in MAG funding; Phase 2 with $17.97 million to connect 700 West to 500 East and 1500 South, likely 2030-31. 700 West: a MAG request to connect Pony Express Parkway to 200 South as a TOD major arterial, about $5.05 million including right-of-way. Dixie Well: about $5.65 million on two city parcels, one for the pump house and one for staging then sale as a home lot, with 24-hour drilling for about two weeks. Station 53: possible bond vote in 2028 after a Fitness Center bond vote. Other priorities: in-house legal counsel, an I-15 flyover study with MAG, a CRA-funded 1100 South roundabout, a transportation utility fee and 100 East widening south of I-15.
- Pony Express Parkway MAG funding: Phase 1 $14.9M; Phase 2 $17.97M
- 700 West (Pony Express to 200 South): about $5.05M
- Lakeshore Drive Phase 1: about $3.1M
- 200 South interim: $24.7M (2022 estimate)
- Dixie Well: about $5.65M
- Lakeview Park: $3-4M
- Slough Trail: $600,000-700,000
March 31, 2026 · City Council work session
Fiscal 2027 Fitness Center, road CIP, impact fee and Local Building Authority funds
Discussed
Finance Director Anna Montoya said there is no plan for a full Fitness Center renovation or bond; the general fund subsidizes about 35% of its operations. Road CIP projects include the 700 North extension (construction FY2027), the 200 South/300 West roundabout (MAG), the Pony Express Corridor (city's 50% MAG match), the 1100 South/100 East intersection and Lakeshore Drive Phase 1. Councilmember Hunter urged a study of a transportation utility fee (about $50,000); Carroll worried about residents' ability to pay. Park impact fees fund the Art Dye Trail (with a MAG grant) and Lakeview Park on 620 South (preliminary $4 million). Police impact fees fund an evidence building and third-floor police building improvements (about $1.8 million). Local Building Authority lease revenue bonds for the public works facility were issued in January rather than March, saving about $1.2 million; proceeds total about $40 million.
- Public works facility LBA lease revenue bonds: about $40 million, issued January 2026; about $1.2 million saved
- Lakeview Park (620 South): preliminary $4 million
- Police evidence building/3rd floor: about $1.8 million
- Transportation utility fee study: about $50,000 (not decided)
May 26, 2026 · City Council
Public hearing on 620 South Annexation, about 700 W. 620 South (6.816 acres)
Discussed
Required public hearing on annexing 6.816 acres at about 700 West 620 South. No one commented. The minutes record no council action on the annexation at this meeting. The March 31 budget work session placed planned Lakeview Park on 620 South.
- Acres: 6.816
July 14, 2026 · City Council
Landscape architecture contract for new park on 620 South
Pending
Award of park design to Blu Line Designs for $133,520, top-ranked of 14 proposals (bids ranged $127,485-$262,315), paid with park impact fees. Bid documents expected by end of 2026 and construction in winter/spring 2027.
- Amount: $133,520
- Funding: park impact fees
- Bid/proposal tabulation: RFP via U3P; 14 proposals scored on price and qualifications; Blu Line top-ranked (94.25). Others: Civil Science $174,500; J-U-B $139,000; Brown Design $132,200; MHTN $198,960; Psomas $168,745; Think Architecture $149,800; PKJ Design Group $127,485 (lowest price); Bowen Collins $234,834; Terracon $217,500; Confluence $205,000; MGB+A $195,240; DVDCreative $262,315; lo LandArch $219,445