I-15 flyover/overpass at 1020 West
A proposed overpass/flyover connecting The Meadows area and Pioneer Crossing at 1020 West, estimated in 2021 at about $60 million and involving the city, UDOT, UTA and possibly Woodbury Corporation. City leaders sought state funding help from legislators in November 2021.
- Where it stands
- Proposed
- Type
- Road project
- Location
- 1020 West, connecting The Meadows and Pioneer Crossing
- Applicant
- American Fork City
Every hearing and vote
November 16, 2021 · City Council work session
Discussion with state legislators on city issues
Discussed
Rep. Kay Christofferson and Sen. Mike Kennedy discussed redistricting, a proposed Utah Lake Commission bill, and city priorities: a freeway overpass/flyover connecting The Meadows and Pioneer Crossing at 1020 West (estimated at about $60 million, involving the city, UDOT, UTA and possibly Woodbury Corporation), a road linking 1020 West to 700 West at 200 South, a local-option tax or utility fee for roads, public safety retention and retirement, the cost of state-mandated handheld and mobile radios, and grant help for pressurized irrigation meters amid drought.
- Flyover at 1020 West estimated at about $60 million
- City applied for a grant to install pressurized irrigation meters
- Councilmember Carroll and Shelton asked for a local road tax/utility fee option