Orem development tracker

400 West and 1200 South roundabout

Proposed two-lane roundabout at 1200 South and 400 West to fix projected failing traffic levels before 2040, designed with Horrocks Engineering. Presented to the council Dec. 8, 2020.

Where it stands
In review
Type
Road project
Location
1200 South and 400 West, Orem

Every hearing and vote

  1. December 8, 2020 · City Council

    1200 South and 400 West roundabout design (work session)

    Discussed

    City Engineer Sam Kelly said traffic at the intersection is projected to reach a failing level of service before 2040 and proposed a two-lane roundabout, designed with Horrocks Engineering, that would reach levels A and B. Council discussion covered construction impacts, landscaping, a maintenance agreement with UVU and bus rapid transit.