Wall Avenue Corridor Plan
A preferred downtown street design (landscaped median, on-street parking, mid-block crossings and a west-side shared path). On Oct. 21, 2025 the council voted to continue the resolution for up to six months while the city negotiates a corridor agreement with UDOT.
Tabled
- Type
- Road project
- Location
- Wall Avenue, 22nd to 27th streets
- Applicant
- Ogden Planning Division
- City Council: Resolution 2025-21: preferred street design for Wall Avenue, 22nd to 27th streets
- City Council: Wall Avenue Corridor Plan: preferred street design for 22nd to 27th streets
- City Council: Wall Avenue Corridor Plan
In brief
Wall Avenue Corridor Plan appears on 3 recorded agendas, from the City Council meeting of November 19, 2024 to the City Council meeting of October 21, 2025.
On record, it was continued once.
The most recent decision was continued at the City Council meeting of October 21, 2025.
Follow the money and project delivery
Wall Avenue Corridor Plan
- Council action
No approval or denial linked in the records collected.
- Money in the record
No itemized amount linked in the records collected.
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
October 21, 2025 · City Council
Resolution 2025-21: preferred street design for Wall Avenue, 22nd to 27th streets
Continued
Consultant Jake Farnsworth of Kimley-Horn presented the preferred concept (four travel lanes with a left-turn lane, landscaped median, on-street parking, mid-block crossings and a west-side shared path), which the Planning Commission recommended unanimously June 4. Chair Marcia White said she does not believe on-street parking should be allowed on Wall Avenue; Council Member Shaun Myers said some people prefer it. Residents including Laura Lewis, Linda Sanchez and Theresa Bramwell said the design does not reflect public preference for an underground bypass, and warned of congestion and safety problems; Travis Pate suggested a ramp from the existing 24th Street pedestrian bridge. Planning Director Barton Brierley asked that final action be continued for up to six months while the city negotiates a corridor agreement with the Utah Department of Transportation. Vice Chair Richard Hyer moved to extend consideration, seconded by Council Member Dave Graf; the motion carried on a voice vote with all voting aye. Mayor Nadolski said an underground option would cost about $200 million and is not realistic now.
- Preferred concept: Traffic Calming with Landscape Median and Shared Use Path
- Planning Commission: unanimous recommendation, June 4, 2025
October 7, 2025 · City Council
Wall Avenue Corridor Plan: preferred street design for 22nd to 27th streets
Discussed
Jake Farnsworth of consultant Kimley-Horn presented the preferred concept, 'Traffic Calming with Landscape Median and Shared Use Path': four travel lanes with a left-turn lane, a landscaped median, street trees, on-street parking, curb extensions, mid-block crossings and an off-street shared path on the west side. The Planning Commission unanimously recommended it June 4, 2025. Council discussion covered other concepts considered, travel time, drawbacks of mid-block crossings, construction timing and benefits to Union Station. The full plan is expected before the council in the coming months.
November 19, 2024 · City Council
Wall Avenue Corridor Plan
Discussed
Kimley-Horn and Associates, chosen after a June 2024 request for proposals, is developing a corridor plan with UDOT as a funding partner. The vision is to better connect Union Station to 25th Street, serve multiple travel modes, reduce speeds and improve pedestrian safety. Discussion focused on public engagement.