Contracts and spending
Who Ogden pays, for what, and how the vendor was chosen: the contracts, bid awards, change orders, purchases, grants and land deals recorded in the City Council meetings written up so far, from the meeting minutes and packets, plus what the city paid its biggest vendors from the state transparency site.
In brief
367 spending items recorded in Ogden meetings between 2020 and 2026.
11 approved contracts, purchases and land deals total $28.8 million. The largest is $17.0 million to Weber County for maximum county tax increment contribution, restricted to infrastructure (March 11, 2025).
By type: 198 budget, 60 grant, 30 contract, 26 bond, and 25 land.
- Contracts, purchases and land deals approved in these meetings
- $28.8 million
- Line items
- 367
- Vendors
- 6
Recorded spending decisions and proposals
| Date | Who and what | Amount |
|---|---|---|
| Tue, Oct 13 | Senior Living at Millcreek, LLC: Incentive payment for the Senior Living at Millcreek project (amount not stated in results report) | — |
| Tue, Sep 8 | No vendor named: Capital project spending in fiscal 2026 (just under $37 million) | $37.0 million |
| Tue, Aug 11 | General Services Administration (seller): City purchase of the U.S. Forest Service Building (December 2025) | $3.60 million |
| Tue, Aug 11 | Giv Group: Proposed sale price of the building to Giv Group upon a tax credit award | $2.80 million |
| Tue, Aug 11 | EML: Security, monitoring, landscaping and upkeep of the building to date | $121,000 |
| Tue, Aug 4 | Ogden School District: Purchase of about 1.91 acres of the former Taylor Canyon School site | $700,000 |
| Tue, Aug 4 | State of Utah: Expected reimbursement for first month of wildland deployments (over $100,000) | $100,000 |
| Tue, Aug 4 | No vendor named: Individual wildland firefighting gear | $40,000 |
| Tue, Jul 14 | Union Pacific: Purchase of the parcel under the Union Station building, paid over five years | $4.20 million |
| Tue, Jul 14 | No vendor named: Taylor Canyon park parcel (1.19 acres at $8.42 per square foot) | $700,000 |
| Tue, Jul 7 | No vendor named: Annual city backstop for the PATH to Citizenship program if grants and donations are not secured | $20,000 |
| Tue, Jun 16 | No vendor named: Final FY2027 city budget | $307.6 million |
| Tue, Jun 16 | No vendor named: Five-year capital improvement plan FY2027-2031 | $245.0 million |
| Tue, Jun 16 | No vendor named: Transfers from water ($3,810,475), sewer ($1,923,500), storm ($830,825) and refuse ($972,750) funds to the general fund | $7.54 million |
| Tue, Jun 16 | No vendor named: RDA year-end amendments (just over $3.2 million) | $3.20 million |
| Tue, Jun 16 | Lotus Development: 2015 purchase price paid by Lotus for the Proudfit and Thorstensen buildings under the original agreement | $1.90 million |
| Tue, Jun 16 | No vendor named: FY2026 year-end amendment recognizing grants and donations | $616,700 |
| Tue, Jun 16 | Color Sky Homes: Proposed tax increment financing support for 10 townhomes (requested about $620,000) | $290,000 |
| Tue, Jun 16 | No vendor named: City arts grants: nine general support ($78,500) and 14 project grants ($79,800) | $158,300 |
| Tue, Jun 16 | No vendor named: Proposed annual city backstop for PATH to Citizenship program | $20,000 |
| Tue, Jun 9 | No vendor named: Total Schedule A-1 adjustments to the tentative FY2027 budget, all funds | $6.53 million |
| Tue, Jun 9 | No vendor named: Estimated cost of Pineview Reservoir crossing; temporary dike option would add $5.5 to $6 million | $6.00 million |
| Tue, Jun 9 | No vendor named: Capital lease for seven equipment items (street sweepers, vac truck, skid steers, trucks) | $2.00 million |
| Tue, Jun 9 | Republic Services: Glass drop-off service at favorable negotiated pricing | — |
| Tue, Jun 2 | No vendor named: Tentative FY2027 budget total | $301.9 million |
| Tue, Jun 2 | No vendor named: Capital projects: about $4.1 million Business Depot Ogden revenue and $33.6 million other sources | $37.8 million |
| Tue, Jun 2 | No vendor named: FY2026 year-end budget amendments, gross increase | $22.0 million |
| Tue, Jun 2 | No vendor named: Proposed FY2027 utility fund transfers to the general fund (water, sewer, storm, refuse) | $7.54 million |
| Tue, Jun 2 | No vendor named: Quality Neighborhoods Initiative annual funding, five years from FY2027 | $1.00 million |
| Tue, Jun 2 | No vendor named: Proposed FY2027 arts grants | $158,300 |
| Tue, Jun 2 | Trails Foundation of Northern Utah: Trail maintenance funding, raised from $30,000 by consensus | $100,000 |
| Tue, May 26 | No vendor named: Union Station capital project: $2.5 million fund balance plus $3.6 million federal Crossroads of the West grant | $6.10 million |
| Tue, May 26 | No vendor named: COLA and pay-for-performance adjustments | $3.35 million |
| Tue, May 26 | No vendor named: Annual Quality Neighborhoods Initiative allocation | $1.00 million |
| Tue, May 26 | Ogden City School District: Purchase of about 2.6 acres (park portion) of former Taylor Canyon School, preliminary price | $948,546 |
| Tue, May 26 | Union Pacific: Fifth installment on Union Station land purchase | $780,000 |
| Tue, May 26 | No vendor named: Projected city cost of medical insurance, FY2027 | $638,150 |
| Tue, May 26 | Golden West: Accelerated payoff of Saint Anne Center loan, Continental area | $350,000 |
| Tue, May 26 | No vendor named: FY2027 city arts grants: 9 general support ($78,500) and 14 project ($79,800) | $158,300 |
| Tue, May 26 | GSBS: LiDAR scan and condition assessment of Union Station | — |
| Tue, May 19 | No vendor named: Proposed FY2027 capital improvement projects (37 projects) | $37.8 million |
| Tue, May 19 | No vendor named: Lester Park improvements, secured funding | $1.90 million |
| Tue, May 19 | No vendor named: Estimated economic impact of the championship | $1.70 million |
| Tue, May 19 | Republic Services: Accept Ogden residential trash, recycling and hazardous waste at the Midland Drive transfer station at a lower rate than before | — |
| Tue, May 12 | No vendor named: Proposed FY2027 general fund | $99.0 million |
| Tue, May 12 | No vendor named: Proposed FY2026 year-end budget amendments, citywide | $22.0 million |
| Tue, May 12 | No vendor named: Proposed FY2027 Business Depot Ogden lease revenue project allocations | $6.70 million |
| Tue, May 12 | No vendor named: CDBG for target-area public improvements | $1.79 million |
| Tue, May 12 | Ogden Housing Authority: Tenant-based rental assistance for about 70 homeless persons | $744,580 |
| Tue, May 12 | Servpro: Cleanup of homeless encampments and hazardous locations | — |
| Tue, May 5 | No vendor named: Total proposed FY2027 city budget (general fund just under $100 million) | $328.0 million |
| Tue, May 5 | No vendor named: Proposed FY2027-2031 capital improvement plan, 61 projects | $242.0 million |
| Tue, May 5 | No vendor named: Speakers' estimate of Business Depot Ogden funds redirected to cover garage bond obligations over the life of the bond | $40.0 million |
| Tue, May 5 | Rocky Mountain Power: One-time reimbursement for mailing two opt-out notices to all customers | $51,774 |
| Tue, May 5 | Interstate Parking: Parking ambassadors; contract already signed | — |
| Tue, May 5 | Passport: Parking app, kiosks and enforcement system; three-year contract | — |
| Tue, Apr 21 | No vendor named: Weber County RAMP budget for the current grant cycle | $6.65 million |
| Tue, Apr 21 | Weber County: 7 percent annual increase in county payments toward Ogden paramedic personnel costs under 2026-2030 agreement | $123,000 |
| Tue, Apr 21 | Rocky Mountain Power: One-time reimbursement for two opt-out notices to all customers (estimate) | $51,000 |
| Tue, Apr 21 | No vendor named: Budget transfer between Community and Economic Development and Fire Departments; gross increase $0 | $0 |
| Tue, Apr 14 | Weber County: Annual increase in county payment for paramedic personnel costs | $123,000 |
| Tue, Apr 14 | No vendor named: Monthly unreserved WonderBlock parking permit | $80 |
| Tue, Apr 14 | 600 Exchange Bldg., LLC: Land transfer and development agreement for redevelopment of the Exchange Building | — |
| Tue, Apr 14 | Interstate Parking: Operate managed parking and provide parking ambassadors | — |
| Tue, Apr 7 | Fisher Reagan Enterprises: City funds set aside for building stabilization, proposed as incentive for preconstruction costs (architecture, testing, development fees) | $1.00 million |
| Tue, Apr 7 | No vendor named: Tenant-based rental assistance for about 70 homeless persons | $744,580 |
| Tue, Apr 7 | No vendor named: CDBG for purchase rehab resale program (plus $751,923 HOME) | $500,000 |
| Tue, Apr 7 | No vendor named: Monthly residential program charge | $4 |
| Tue, Apr 7 | Interstate Parking: Parking ambassadors and parking management | — |
| Tue, Mar 24 | No vendor named: Quality Neighborhoods Initiative annual funding, renewed five years through FY2031 | $1.00 million |
| Tue, Mar 24 | No vendor named: Increased green fees, season pass and punch pass rates; peak 18-hole with cart $56 | — |
| Tue, Mar 10 | No vendor named: Capital projects appropriated across general CIP, water, sanitary/storm, golf and airport funds as of December 2025 (over $33 million) | $33.0 million |
| Tue, Mar 10 | No vendor named: Proposed annual PATH to Citizenship funding, up from $21,000 | $42,000 |
| Tue, Mar 10 | Tellus: Community air quality monitors (four bought with last year's $13,325 in event donations) | — |
| Tue, Mar 3 | No vendor named: Replace screening along the ninth hole at Mount Ogden Golf Course | $150,000 |
| Tue, Feb 17 | No vendor named: Grant dollars expended in FY2025 across 88 grants | $36.7 million |
| Thu, Feb 5 | No vendor named: Annual Jefferson Park maintenance | $44,000 |
| Thu, Feb 5 | Garda World: Security patrols rotating through four city parks | $28,000 |
| Tue, Jan 6 | No vendor named: Increase in long-term debt tied to the Forest Service building purchase and the new markets tax credit special purpose entity | $9.00 million |
| Tue, Jan 6 | No vendor named: Lester Park improvements (total need $4 million) | $2.00 million |
| Tue, Dec 16 | No vendor named: Appropriation for Annual Action Plan Amendment #1 | $1.24 million |
| Tue, Dec 16 | No vendor named: HOME CHDO funds redirected to construct a new single-family home on Madison Avenue | $158,520 |
| Tue, Dec 16 | Matrix Consulting Group, Ltd.: General management and operations study of the Public Services Department (general fund operations) | $81,520 |
| Tue, Dec 9 | No vendor named: Maximum annual BDO lease revenue for WonderBlock debt service | $4.20 million |
| Tue, Dec 9 | No vendor named: Maximum annual BDO lease revenue for MBA parking garage debt service | $4.00 million |
| Tue, Dec 9 | Federal Aviation Administration: Airport capital grant funds recognized in the budget | $2.21 million |
| Tue, Dec 9 | No vendor named: Remaining funds from closed projects moved to Centennial Trail, trail improvements and park facilities | $295,650 |
| Tue, Dec 9 | No vendor named: Lorin Farr Pool repairs | $150,000 |
| Tue, Dec 9 | Matrix Consulting Group: Management study of the Public Services Department | $81,000 |
| Tue, Dec 2 | Ogden School District: Possible purchase of 4.23 acres of surplus school property; price to be the average of city and district appraisals | — |
| Tue, Nov 18 | No vendor named: Net increase to the FY2025-26 city budget reflecting Annual Action Plan Amendment #1 | $1.24 million |
| Thu, Nov 13 | Federal Aviation Administration: FAA grant funds recognized for airport capital projects | $2.21 million |
| Thu, Nov 13 | No vendor named: Lorin Farr Pool repairs | $150,000 |
| Tue, Oct 21 | No vendor named: City share of Olympic mural: $62,500 base contribution, $22,500 contingency for partner shortfalls, $25,000 lighting (project estimated at $210,000) | $110,000 |
| Tue, Oct 14 | No vendor named: City share of Olympic mural: $62,500 base, $22,500 contingency, $25,000 lighting (total project estimated at $210,000) | $110,000 |
| Tue, Sep 2 | No vendor named: Public safety wages and operational costs | $1.44 million |
| Tue, Sep 2 | No vendor named: Police vehicles | $645,000 |
| Tue, Sep 2 | No vendor named: Purchase of property on Childs Avenue for partnership with My Hometown Ogden | $350,000 |
| Tue, Sep 2 | No vendor named: Storm sewer improvements | $158,000 |
| Tue, Aug 26 | No vendor named: Property purchase $350,000; police vehicles $645,000; storm sewer $158,000; public safety wages and operations $1,439,125 | $3.34 million |
| Tue, Jul 15 | Utah Department of Natural Resources: Grant for replacing the 36-inch water line through Ogden Canyon; the turf limit is a grant condition | $10.0 million |
| Tue, Jul 15 | Central Weber Sewer Improvement District: Additional property tax revenue from proposed 9.14 percent increase | $1.31 million |
| Tue, Jul 15 | 29 arts organizations and individuals: FY 2025-26 arts grants (general support $64,000; project support $96,000) | $160,000 |
| Tue, Jul 15 | America250 Utah: Planning stipend for official partner cities | $1,500 |
| Tue, Jul 8 | No vendor named: Acquire and demolish the Weber County jail building at the municipal block; leftover funds proposed for a shared jail facility | $5.00 million |
| Tue, Jul 1 | No vendor named: Proposed allocation of ARPA funds: jail building $5,000,000; Union Station $2,500,000; all-abilities park $500,000 | $8.00 million |
| Tue, Jul 1 | No vendor named: Projected property tax revenue above what the certified rate will generate | $900,000 |
| Tue, Jul 1 | No vendor named: FY2025-26 city arts grants to 29 applicants ($64,000 general support, $96,000 project support) | $160,000 |
| Tue, Jun 17 | No vendor named: Total five-year capital improvement plan, 92 projects | $249.4 million |
| Tue, Jun 17 | Utah Department of Natural Resources: Grant for Ogden Canyon waterline replacement, conditioned on limiting turf in new-home yards to 35 percent | $10.0 million |
| Tue, Jun 17 | No vendor named: ARPA funds moved back to the restricted future projects fund; had been proposed for jail building ($5,000,000), Union Station campus ($2,500,000) and an all-abilities park ($500,000) | $8.00 million |
| Tue, Jun 17 | No vendor named: Total proposed FY2025-26 transfers from utility funds to the General Fund (water $3,475,925; sewer $1,835,650; storm $799,425; refuse $935,700) | $7.05 million |
| Tue, Jun 17 | Weber County: Proposed acquisition and demolition of the Weber County jail building (not funded in this action) | $5.00 million |
| Tue, Jun 17 | No vendor named: FY2024-25 year-end budget amendment | $4.69 million |
| Tue, Jun 17 | No vendor named: New Markets Tax Credit funding for the Marshall N. White Center | $2.12 million |
| Tue, Jun 17 | No vendor named: RAMP grants: Bonneville Park ballfields $162,875; Lester Park playground $200,000; Lester Park/Golden Hours pickleball $200,000 | $562,875 |
| Tue, Jun 17 | No vendor named: County RAMP grant for the Ogden Business Exchange surf wave project | $491,875 |
| Tue, Jun 10 | No vendor named: FY2024-25 year-end city budget amendment | $4.69 million |
| Tue, Jun 10 | No vendor named: Adams CRA bond proceeds: $118,000 issuance costs and $3,240,000 for Forest Service Building balance | $3.36 million |
| Tue, Jun 10 | No vendor named: Reallocated CDBG-CV funds for target-area public improvements, expected to go to recreation and park projects | $500,000 |
| Tue, Jun 10 | No vendor named: Raise non-sworn merit increase from 1.5% to 2% | $219,325 |
| Tue, Jun 10 | No vendor named: Work on partnership with trails organizations | $30,000 |
| Tue, Jun 3 | No vendor named: Total proposed FY2025-26 Ogden City budget after Schedule A-1 changes | $267.0 million |
| Tue, Jun 3 | No vendor named: Proposed FY2025-26 transfer from Water Fund to General Fund | $3.48 million |
| Tue, Jun 3 | No vendor named: Proposed FY2025-26 transfer from Sanitary Sewer Fund to General Fund | $1.84 million |
| Tue, Jun 3 | No vendor named: Proposed FY2025-26 transfer from Refuse Fund to General Fund | $935,700 |
| Tue, Jun 3 | No vendor named: Proposed FY2025-26 transfer from Storm Sewer Fund to General Fund | $799,425 |
| Tue, May 27 | No vendor named: Cost-of-living and merit adjustments in the tentative FY2025-26 budget | $3.27 million |
| Tue, May 27 | No vendor named: Net increase in Public Services FY2025-26 budget | $1.37 million |
| Tue, May 27 | No vendor named: Proposed increase in Police Department FY2025-26 budget (4.5 percent) | $1.30 million |
| Tue, May 27 | No vendor named: Proposed increase in Management Services budget (5.28 percent) | $374,400 |
| Tue, May 20 | No vendor named: FY2024-25 city budget amendment | $118.4 million |
| Tue, May 20 | No vendor named: 42 capital improvement projects in the FY2025-26 budget | $29.7 million |
| Tue, May 20 | No vendor named: Increase in total FY2025-26 budget over FY2024-25 (7.5 percent) | $20.0 million |
| Tue, May 20 | No vendor named: Proposed FY2025-26 Redevelopment Agency budget | $16.9 million |
| Tue, May 20 | No vendor named: Fire Department FY2025-26 capital requests | $1.74 million |
| Tue, May 13 | No vendor named: Amended Adams CRA budget (up from $10,811,794), including $21,348,418 for development and infrastructure | $28.5 million |
| Tue, May 13 | No vendor named: Proposed FY2026 appropriation of Business Depot Ogden lease revenue | $14.6 million |
| Tue, May 13 | No vendor named: Maximum tax increment financing from taxing entity participation under the amended agreement | $6.86 million |
| Tue, May 13 | No vendor named: Proposed FY2025-26 Municipal Building Authority budget, mostly WonderBlock parking debt service | $4.20 million |
| Tue, May 13 | No vendor named: Tenant and homeless rental assistance, spread over four years, administered by the Ogden Housing Authority | $846,000 |
| Tue, May 6 | No vendor named: Total proposed five-year capital improvement plan, 92 projects | $249.4 million |
| Tue, May 6 | No vendor named: FY2024-25 city budget amendment | $118.4 million |
| Tue, May 6 | No vendor named: Proposed increase in total budget including RDA, MBA and Strike Force | $17.2 million |
| Tue, May 6 | No vendor named: Proposed General Fund increase in the FY2025-26 budget | $4.80 million |
| Tue, May 6 | No vendor named: FY2024-25 RDA budget amendment: Airport $480,000, Kiesel $63,000, Adams $140,000, housing fund $350,000 | $1.03 million |
| Tue, May 6 | No vendor named: Reallocated CDBG-CV funds for target-area public improvements | $500,000 |
| Tue, May 6 | No vendor named: Expected fee revenue appropriated to Public Services for the rest of FY2024-25 | $161,625 |
| Tue, May 6 | No vendor named: Regular daily admission at the Eccles Dinosaur Park, up from $8 | $12 |
| Tue, Apr 15 | No vendor named: Expected fee revenue from the Marshall N. White Community Center for the rest of FY2024-25 | $161,625 |
| Tue, Apr 15 | No vendor named: Proposed daily admission at George S. Eccles Dinosaur Park (up from $8) | $12 |
| Tue, Apr 15 | HBME, LLC: Financial audits for fiscal years 2025-2027, with optional two-year extension | — |
| Tue, Apr 1 | Community Development Finance Alliance / private NMTC investors: Investor funding for outdoor pickleball lighting, fencing, landscaping and pool and weight equipment at the Marshall N. White Community Center | $2.10 million |
| Tue, Mar 25 | No vendor named: Leverage loan funded by the Municipal Building Authority, repaid after the seven-year compliance period | $6.88 million |
| Tue, Mar 25 | No vendor named: Approximate investor funding through New Markets Tax Credits to complete Marshall White Community Center elements | $2.10 million |
| Tue, Mar 18 | U.S. Forest Service (seller): Purchase of the Forest Service building by the Redevelopment Agency | $3.60 million |
| Tue, Mar 11 | Weber County: Maximum county tax increment contribution, restricted to infrastructure | $17.0 million |
| Tue, Mar 11 | No vendor named: Grant funds expended in fiscal 2023-24 (of more than $52 million managed) | $13.7 million |
| Tue, Mar 4 | No vendor named: Quality Neighborhoods Initiative infill housing appropriation, moved up from fiscal 2026; proposed use is buying 2325 Madison Avenue from Weber Housing Authority | $1.00 million |
| Tue, Feb 18 | No vendor named: New bond debt for the Wonderblock development, fiscal 2023-24 | $127.2 million |
| Tue, Feb 18 | U.S. Forest Service (seller): Purchase of the Forest Service building by the Redevelopment Agency | $3.60 million |
| Tue, Feb 18 | No vendor named: Earnest money and maintenance costs for the building | $600,000 |
| Tue, Feb 11 | No vendor named: Proposed total Adams CRA budget, up from $10.8 million | $30.5 million |
| Tue, Feb 11 | Williams International: Post-performance incentive: $17M electrical infrastructure, $5M job creation and training | $22.0 million |
| Tue, Feb 11 | Weber County: Maximum county tax increment contribution to the Airport CRA, restricted to infrastructure | $17.0 million |
| Tue, Feb 11 | No vendor named: New 24-inch waterline loop from the airport well | $5.50 million |
| Tue, Feb 11 | Alpha Adams, LLC: Tax increment incentive for 101-unit apartment project: $3.25M structured parking, $1M plazas and landscaping, $1.5M exterior finishes | $4.70 million |
| Tue, Feb 4 | No vendor named: Two new mayor's office positions; net $0 change to fiscal 2025 budget, with $344,000-$413,000 more needed in fiscal 2026 | — |
| Tue, Jan 14 | No vendor named: Transfer from other general fund lines to fund two new mayor's office positions for the rest of fiscal 2025 | $241,400 |
| Tue, Jan 14 | No vendor named: Preliminary budget for the PATH to Citizenship Program | $21,000 |
| Tue, Dec 17 | No vendor named: FY2024-25 budget amendment reappropriating ARPA funds | $18.5 million |
| Tue, Dec 17 | No vendor named: Union Station ($2.5M), county jail acquisition and demolition ($5M) and park improvements ($0.5M) held in a non-project capital account | $8.00 million |
| Tue, Dec 17 | No vendor named: Lester Park improvements | $1.04 million |
| Tue, Dec 17 | No vendor named: Increase to HUD Annual Action Plan budget | $674,100 |
| Tue, Dec 17 | No vendor named: Own in Ogden HOME down payment assistance | $250,000 |
| Tue, Dec 17 | No vendor named: Transfer to fleet and facilities equipment replacement reserve | $152,600 |
| Tue, Dec 17 | No vendor named: 4th Street Park netting | $70,000 |
| Tue, Dec 17 | No vendor named: Preliminary PATH to Citizenship program budget | $21,000 |
| Tue, Dec 10 | No vendor named: Reappropriation of pandemic relief funds | $18.5 million |
| Tue, Dec 10 | No vendor named: Purchase of the 605 North Jackson site | $1.07 million |
| Tue, Dec 10 | No vendor named: Proposed new cap on infill property acquisitions without council approval (from $250,000) | $400,000 |
| Tue, Dec 3 | No vendor named: Reappropriation of ARPA and fund balance to Lester Park, Union Station, jail acquisition and demolition, all-abilities park, park netting and fleet reserve | $18.5 million |
| Tue, Dec 3 | No vendor named: FY2024-25 budget amendment for 20th Street, Airport terminal, vehicles, Justice Court IT, Union Station locomotive parts, Fire training, Golden Hours roof, Kayak Park and Ogden River repairs, podcast grant | $2.98 million |
| Tue, Nov 19 | U.S. General Services Administration: Forest Service Building purchase (earnest money $360,000) | $3.60 million |
| Tue, Nov 19 | No vendor named: FY2024-25 mid-year budget amendment | $2.90 million |
| Tue, Nov 12 | U.S. General Services Administration: Purchase of the U.S. Forest Service Building | $3.60 million |
| Tue, Nov 12 | No vendor named: Increase to HUD Annual Action Plan budget, including $250,000 more for Own in Ogden HOME down payment assistance | $674,100 |
| Tue, Nov 12 | U.S. General Services Administration: Earnest money with executed contract | $360,000 |
| Tue, Nov 12 | West Haven City: Estimated annual post-closure care, shared between the cities | $11,500 |
| Tue, Oct 15 | No vendor named: Estimated annual post-closure care cost shared by Ogden and West Haven | $11,500 |
| Tue, Sep 10 | No vendor named: Proposed improvements to Lester Park and Lorin Farr Pool | $10.0 million |
| Tue, Sep 10 | No vendor named: Interest income on Series 2023 bonds recognized for WonderBlock development costs | $4.00 million |
| Tue, Sep 10 | Ogden Contemporary Arts: 18-month arts programming pilot in the Nine Rails Creative District | $120,000 |
| Tue, Aug 20 | No vendor named: Proposed improvements at Lester Park and Lorin Farr Pool | $10.0 million |
| Tue, Aug 20 | Ogden Contemporary Arts: 18-month pilot to manage arts programming in the Nine Rails District | $108,000 |
| Tue, Aug 6 | No vendor named: Compensation and benefits adjustments from McGrath study | $4.66 million |
| Tue, Aug 6 | No vendor named: Fiscal 2024-25 arts grants | $150,000 |
| Tue, Jul 16 | No vendor named: Fiscal 2024-25 arts grants | $150,000 |
| Tue, Jul 16 | No vendor named: Additional cost to fully implement the compensation study | $87,350 |
| Tue, Jul 9 | McGrath Consulting, Inc.: Set-aside for compensation and benefits adjustments in FY2024-25 | $4.66 million |
| Tue, Jul 9 | No vendor named: Arts grants budget, FY2024-25 | $150,000 |
| Tue, Jul 2 | McGrath Consulting, Inc.: Set-aside for compensation and benefits adjustments in FY2024-25 budget | $4.66 million |
| Tue, Jun 18 | No vendor named: Five-year capital improvement plan FY2025-2029 | $262.8 million |
| Tue, Jun 18 | No vendor named: Tentative city budget FY2024-25 | $90.1 million |
| Tue, Jun 18 | No vendor named: Total annual utility fund transfers to general fund | $6.69 million |
| Tue, Jun 18 | No vendor named: Fiscal 2023-24 year-end budget amendment | $5.82 million |
| Tue, Jun 18 | No vendor named: Proposed property tax increase to fund mental health services for first responders | $185,000 |
| Tue, Jun 11 | No vendor named: Maximum principal of Series 2024 subordinated revenue bonds | $82.1 million |
| Tue, Jun 11 | Federal WIFIA program: Loan for Ogden Canyon waterline | $42.6 million |
| Tue, Jun 11 | Utah State Revolving Loan Fund: Loan for Ogden Canyon waterline | $34.3 million |
| Tue, Jun 11 | No vendor named: City ARPA funds for the waterline | $12.0 million |
| Tue, Jun 11 | State of Utah: State appropriation for the waterline | $10.0 million |
| Tue, Jun 11 | No vendor named: Fiscal 2023-24 year-end city budget amendment | $5.80 million |
| Tue, Jun 11 | No vendor named: RDA fiscal 2023-24 amendment from expired districts | $1.05 million |
| Tue, Jun 11 | George S. and Dolores Dore Eccles Foundation: Contribution for rodeo ground improvements, recognized with 75-year naming rights | $800,000 |
| Tue, Jun 4 | No vendor named: Tentative city budget FY2024-25 | $90.1 million |
| Tue, Jun 4 | No vendor named: Water fund transfer to general fund | $3.22 million |
| Tue, Jun 4 | No vendor named: Sanitary sewer fund transfer to general fund | $1.78 million |
| Tue, Jun 4 | No vendor named: Refuse fund transfer to general fund | $912,000 |
| Tue, Jun 4 | George S. and Dolores Doré Eccles Foundation: Contribution to build rodeo ground improvements at Ogden Pioneer Stadium, recognized with 75-year naming rights | $800,000 |
| Tue, Jun 4 | No vendor named: Storm sewer fund transfer to general fund | $768,000 |
| Tue, May 21 | No vendor named: Proposed Redevelopment Agency budget FY2024-25 | $20.3 million |
| Tue, May 21 | No vendor named: Capital projects through the Capital Improvement Fund | $4.35 million |
| Tue, May 21 | No vendor named: Fire/Public Safety Facility training tower capital funding | $2.50 million |
| Tue, May 21 | No vendor named: Transfer of BDO lease revenue to general fund for wages and benefits | $1.80 million |
| Tue, May 14 | No vendor named: Estimated general fund revenue, FY2024-25 | $90.1 million |
| Tue, May 14 | No vendor named: Federal and state loans for the 36-inch Ogden Canyon waterline | $77.0 million |
| Tue, May 14 | No vendor named: Proposed appropriation of accumulated BDO lease revenue | $17.2 million |
| Tue, May 14 | No vendor named: Municipal Building Authority FY2024-25 budget, mostly WonderBlock parking structure debt service | $3.68 million |
| Tue, May 7 | No vendor named: New growth revenue | $600,000 |
| Tue, May 7 | No vendor named: Added property tax revenue from keeping the certified rate | $183,000 |
| Tue, May 7 | No vendor named: CDBG and HOME entitlement funds programmed in the FY2024-25 Annual Action Plan (amounts in the plan exhibit) | — |
| Tue, Apr 23 | No vendor named: Maximum principal of Series 2024 revenue bonds to finance the 36-inch Ogden Canyon waterline project | $82.1 million |
| Tue, Apr 23 | No vendor named: Mid-year increase in revenues and appropriations across city funds, FY2023-24 | $7.51 million |
| Tue, Apr 9 | No vendor named: WIFIA federal loan for Ogden Canyon waterline | $42.6 million |
| Tue, Apr 9 | No vendor named: State Revolving Loan Fund financing for Ogden Canyon waterline | $34.3 million |
| Tue, Apr 9 | No vendor named: City ARPA funds for Ogden Canyon waterline | $12.0 million |
| Tue, Apr 9 | No vendor named: State appropriation for Ogden Canyon waterline | $10.0 million |
| Tue, Apr 2 | No vendor named: Approximate interest earned on Marshall White Center bond; proposed for fencing, lighting and soil mitigation | $1.00 million |
| Tue, Feb 20 | Synchrony Bank: Line of credit supplementing community development programs; reapproved on prior terms for two years | $1.40 million |
| Tue, Nov 28 | No vendor named: Water and sewer improvements for Ya Ya Foods expansion | $3.81 million |
| Tue, Nov 28 | No vendor named: MBA parking reserve and project investment (MBA Resolution 2023-4) | $2.26 million |
| Tue, Nov 28 | No vendor named: Municipal Building Authority parking reserve (council) | $1.50 million |
| Tue, Nov 28 | No vendor named: Commercial airline incentive | $500,000 |
| Tue, Nov 28 | Parkway Group, LLC: Incentive for development of Redevelopment Agency land | — |
| Tue, Nov 14 | No vendor named: Budget amendment for EV charging stations, fleet revenue and other items | $3.60 million |
| Tue, Nov 7 | No vendor named: Purchase of property at 1781 Gibson Avenue by the Redevelopment Agency | — |
| Tue, Nov 7 | No vendor named: Gross decrease in anticipated revenues and appropriations (Annual Action Plan Amendment #1) | $-34,450 |
| Tue, Aug 15 | No vendor named: Gross increase: Junction parking bond proceeds, Trackline property sale, Capital Square property sale | $3.64 million |
| Tue, Jun 20 | No vendor named: Marshall N. White Center construction and repairs to The Junction parking structures | $24.9 million |
| Tue, Jun 20 | No vendor named: Restoration of the Merci Boxcar | $175,000 |
| Tue, May 23 | No vendor named: Not-to-exceed sales tax revenue bonds for Marshall White Community Center and Junction parking structure repairs | $31.0 million |
| Tue, May 16 | No vendor named: Close out capital improvement projects; transfer excess funds; recognize equipment revenue | $4.03 million |
| Tue, May 2 | No vendor named: Series 2023 Sales Tax Revenue Bonds (not to exceed) for Marshall White Community Center replacement and Junction parking structure repairs | $31.0 million |
| Tue, Apr 4 | Henry Walker Construction, LLC: Land transfer and reimbursement agreement for infill housing | — |
| Tue, Mar 7 | No vendor named: Future park property purchases and development | $3.04 million |
| Tue, Feb 7 | HBME, LLC: Fiscal Year 2023-2024 financial audits (extension) | — |
| Tue, Jan 17 | No vendor named: Capital projects, equipment replacement and Union Station purchase | $4.20 million |
| Tue, Jan 17 | No vendor named: Union Station property purchase | $300,000 |
| Tue, Jan 17 | State of Utah, Division of Facilities Construction and Management: Purchase of property for WonderBlock court parking | — |
| Tue, Jan 10 | No vendor named: Maximum lease revenue bonds for development of two parking structures | $85.0 million |
| Tue, Jan 10 | No vendor named: Maximum Sales Tax and Tax Increment Revenue Bonds for WonderBlock | $75.0 million |
| Tue, Jan 10 | No vendor named: Sales tax pledge agreement supporting WonderBlock revenue bonds | — |
| Tue, Dec 13 | Ogden School District: Purchase of surplus school district property | — |
| Tue, Dec 6 | No vendor named: Gross increase in revenues and appropriations, Fiscal Year 2022-2023 | $2.14 million |
| Tue, Dec 6 | Union Pacific Railroad Company: Purchase of about 8.05 acres of the Union Station property | — |
| Tue, Nov 15 | No vendor named: Maximum principal of Lease Revenue Bonds for parking structures | $85.0 million |
| Tue, Nov 15 | No vendor named: Maximum principal of Sales Tax and Tax Increment Revenue Bonds for the WonderBlock project | $75.0 million |
| Tue, Nov 15 | No vendor named: City obligation under a pledge agreement supporting Redevelopment Agency Sales and Tax Increment Revenue Bonds, Series 2023 for WonderBlock | — |
| Tue, Nov 1 | No vendor named: Budget increase for the Union Stock Exchange Building | $1.04 million |
| Tue, Nov 1 | No vendor named: CIP transfer to the Redevelopment Agency and new grant awards | $194,900 |
| Tue, Nov 1 | Q Factor, LLC: Transfer of 1.81 acres for redevelopment of the Union Stockyard Exchange Building | — |
| Tue, Nov 1 | Q Factor, LLC: Incentive/reimbursement for redevelopment | — |
| Tue, Oct 11 | No vendor named: Fiscal 2023 budget increase for the Union Stock Exchange Building | $1.04 million |
| Tue, Oct 11 | No vendor named: Transfer of CIP funds to the Redevelopment Agency and recognition of new grants | $194,900 |
| Tue, Sep 13 | No vendor named: Nonprofit grant program | $1.30 million |
| Tue, Sep 6 | No vendor named: Proposed nonprofit grant program | $1.30 million |
| Tue, Aug 9 | Highline Partners, LLC: Transfer of 0.97 acres of agency-held land for housing development | — |
| Tue, Aug 9 | Highline Partners, LLC: Incentive for development of 116 apartments and 5 townhome buildings | — |
| Tue, Aug 9 | No vendor named: Conveyance of two city parcels to the Redevelopment Agency for housing | — |
| Tue, Jun 21 | No vendor named: Year-end adjustments | $3.68 million |
| Tue, Jun 21 | No vendor named: WonderBlock pre-development costs | $2.50 million |
| Tue, Jun 21 | No vendor named: Annual Action Plan Amendment #3 (HOME-ARP) | $1.65 million |
| Tue, Jun 21 | No vendor named: Park strip water conservation program | $200,000 |
| Tue, Jun 14 | No vendor named: Marshall White Center design | $4.00 million |
| Tue, Jun 14 | No vendor named: Unanticipated Swift Building environmental expenses | $2.08 million |
| Tue, Jun 14 | No vendor named: Ogden and Weber River storm sewer improvements | $229,000 |
| Tue, Apr 19 | No vendor named: Contingency funds and water capital plan adjustments | $367,800 |
| Tue, Apr 5 | No vendor named: Employee salary increase and cost-of-living adjustment | $765,675 |
| Tue, Dec 14 | DL Evans: Recognize DL Evans loan proceeds and Quality Neighborhood Initiative rental income | $2.39 million |
| Tue, Dec 14 | No vendor named: Appropriate new revenue for activities under Annual Action Plan Amendment #2 | $1.72 million |
| Tue, Dec 14 | Synchrony Bank: Renewal of line of credit for Community Development Programs | — |
| Tue, Nov 16 | Amer Sports Winter & Outdoor Company: Incentive payment for redevelopment of about 19.89 acres | — |
| Tue, Oct 19 | No vendor named: Police salaries | $2.48 million |
| Tue, Oct 19 | No vendor named: Airport grant, sewer master plan update, FY21 unused and surplus funds | $2.45 million |
| Tue, Aug 17 | Lotus Partners, LLC: Participation and incentive agreement for redevelopment | — |
| Tue, Jul 13 | No vendor named: Strategic plan funding | $275,000 |
| Tue, Jun 15 | No vendor named: Corner Plaza, public art and various other funding | $1.11 million |
| Tue, Jun 1 | No vendor named: Fire equipment and Capital Improvement Plan projects | $8.95 million |
| Tue, Jun 1 | No vendor named: Airport Capital Improvement Plan projects | $2.30 million |
| Tue, Jun 1 | No vendor named: Corner Plaza, public art and various other funding | $1.11 million |
| Tue, Jun 1 | No vendor named: River restoration capital improvement project grants | $458,450 |
| Tue, May 18 | No vendor named: Fire equipment and Capital Improvement Plan projects | $8.95 million |
| Tue, May 18 | No vendor named: Airport Capital Improvement Plan projects | $2.30 million |
| Tue, May 18 | No vendor named: River restoration capital improvement project grants | $458,450 |
| Tue, Apr 27 | No vendor named: Environmental remediation, Swift Site and Weber River | $1.30 million |
| Tue, Apr 27 | JF Capital, LLC: 4-C property purchase; purchase contract assigned to JF Capital, LLC | $600,000 |
| Tue, Apr 27 | JF Wonder Block Partners QOZB, LLC: Predevelopment services agreement | — |
| Tue, Apr 27 | Bott Pantone Architects, LLC: Participation and incentive agreement | — |
| Tue, Apr 13 | No vendor named: Swift Site / Weber River environmental remediation | $1.30 million |
| Tue, Apr 13 | No vendor named: 4-C property purchase | $600,000 |
| Tue, Apr 13 | Synchrony Bank: Line of credit for community development projects (amount not stated) | — |
| Tue, Apr 6 | No vendor named: Wage adjustments and travel appropriations | $1.97 million |
| Tue, Mar 23 | No vendor named: Wage adjustments and travel appropriations | $1.97 million |
| Tue, Mar 16 | No vendor named: Infrastructure support improvements at Ogden Hinckley Airport | $6.00 million |
| Tue, Mar 16 | No vendor named: Higher salary ranges for building inspectors and plan reviewers | $285,900 |
| Tue, Mar 2 | No vendor named: Infrastructure support improvements at Ogden Hinckley Airport | $6.00 million |
| Tue, Mar 2 | No vendor named: Higher salary ranges for building inspectors and plan reviewers; recognizes fleet asset sale revenue | $285,900 |
| Tue, Feb 9 | No vendor named: Construct an arts plaza | $4.25 million |
| Tue, Feb 9 | Dr. Ezekiel R. and Edna Wattis Dumke Foundation: Sponsorship naming agreement for the Arts Plaza (amount not stated in the results document) | — |
| Tue, Jan 26 | No vendor named: Construct an arts plaza | $4.25 million |
| Tue, Jan 19 | No vendor named: 26th Street improvements | $5.72 million |
| Tue, Jan 19 | Weber Area Council of Governments: Funding for the FrontRunner North expansion and Business Depot Ogden station | $3.00 million |
| Tue, Jan 5 | No vendor named: 26th Street improvements | $5.72 million |
| Tue, Jan 5 | Weber Area Council of Governments: FrontRunner North expansion and BDO station | $3.00 million |
| Tue, Jan 5 | No vendor named: FY2021 Annual Action Plan Amendment #1 | $2.02 million |
| Tue, Dec 15 | No vendor named: FY2021 Annual Action Plan Amendment #1 | $2.02 million |
| Tue, Dec 15 | No vendor named: Demolish old airport control tower | $520,000 |
| Tue, Dec 1 | No vendor named: Utility revenue bond proceeds | $66.2 million |
| Tue, Dec 1 | No vendor named: Demolish old airport control tower | $520,000 |
| Tue, Nov 17 | No vendor named: Utility revenue bond proceeds budget amendment | $66.2 million |
| Tue, Nov 17 | No vendor named: CARES Act purposes | $6.61 million |
| Tue, Oct 20 | No vendor named: Recognize and appropriate new miscellaneous grant revenue | $876,999 |
| Tue, Oct 20 | No vendor named: Interagency transfer to the Redevelopment Agency | $600,000 |
| Tue, Oct 20 | No vendor named: Storm Sewer Utility grant funding | $346,762 |
| Tue, Oct 6 | No vendor named: Recognize new miscellaneous grant revenue | $876,999 |
| Tue, Oct 6 | No vendor named: Interagency transfer to the Redevelopment Agency, Continental Community Reinvestment Area | $600,000 |
| Tue, Oct 6 | No vendor named: Storm Sewer Utility grant revenue | $346,762 |
| Tue, Sep 15 | No vendor named: CARES Act purposes | $5.60 million |
| Tue, Sep 15 | No vendor named: New grant-funded Homeless Service Advocate position | $114,250 |
| Tue, Sep 15 | Weber County: CARES funds for city grants to nonprofits and small businesses (amount not stated in results report) | — |
| Tue, Sep 1 | No vendor named: CARES Act purposes | $5.60 million |
| Tue, Aug 25 | No vendor named: New grant-funded Homeless Service Advocate position | $114,250 |
| Tue, Aug 18 | No vendor named: Carry-forward of fiscal 2019 funds | $305,000 |
| Tue, Aug 18 | No vendor named: Spanish-language translation services | $30,000 |
| Tue, Aug 4 | No vendor named: Carry-forward of fiscal 2019 funds | $305,000 |
| Tue, Aug 4 | No vendor named: Spanish-language translation services | $30,000 |
| Tue, Jul 7 | Zions Bancorporation (Zions Bank): Fleet lease/purchase agreement (amount not stated in results report) | — |
| Tue, Jun 23 | No vendor named: Ogden City fiscal year 2020-21 budget (total not stated in results report) | — |
| Tue, Jun 16 | No vendor named: Raised maximum par amount of refunded bonds under Resolution 2020-5 (amount not stated in results report) | — |
| Tue, May 26 | No vendor named: Ogden-Hinckley Airport terminal roof improvements and infrastructure upgrades | $320,000 |
| Tue, May 12 | No vendor named: Airport terminal roof improvements and infrastructure upgrades | $320,000 |
| Tue, May 12 | No vendor named: Strategic Plan Directives | $273,925 |
| Tue, Apr 28 | No vendor named: Maximum principal of Series 2020 sewer, water and/or storm drain revenue and refunding bonds | $58.0 million |
| Tue, Apr 28 | No vendor named: Annual Action Plan Amendment #2 budget adjustment | $778,175 |
| Tue, Apr 28 | No vendor named: Strategic Plan Directives | $273,925 |
| Tue, Apr 21 | No vendor named: Seismic retrofit and remodel of Fire Station 4 (CIP project FI032) | $2.15 million |
| Tue, Apr 21 | No vendor named: Annual Action Plan Amendment #2 budget adjustment | $778,175 |
| Tue, Apr 7 | No vendor named: Maximum principal of Series 2020 sewer, water and/or storm drain revenue and refunding bonds | $58.0 million |
| Tue, Apr 7 | No vendor named: Seismic retrofit and remodel of Fire Station 4 (CIP project FI032) | $2.15 million |
| Tue, Apr 7 | No vendor named: Emergency Loan Fund for small businesses | $1.00 million |
| Tue, Apr 7 | No vendor named: Annual Action Plan Amendment #2 budget adjustment | $778,175 |
| Tue, Apr 7 | HBME, LLC: Financial audits, fiscal years 2020 to 2022 | — |
| Tue, Mar 10 | No vendor named: Airport northeast fire flow improvement study | $250,000 |
| Tue, Feb 25 | No vendor named: Airport northeast fire flow improvement study | $250,000 |
| Tue, Jan 21 | Rocky Mountain Power: Energy-savings incentive paid to Ogden City Water Utility | $27,257 |
| Tue, Jan 7 | No vendor named: Swift Building demolition (gross budget increase) | $812,975 |