Asphalt paving code amendment

Requires 6 inches of compacted asphalt in two lifts on city roads and pavement cores to assess existing roads (Section 15.01.1250). Recommended 5-0 June 4, 2025.

Recommended

Type
Code change
Location
Citywide (city roads)
Applicant
American Fork City

In brief

Asphalt paving code amendment appears on one recorded agenda: the Planning Commission meeting of June 4, 2025.

On record, it was recommended for approval once.

The most recent decision was recommended for approval (5-0) at the Planning Commission meeting of June 4, 2025.

Follow the money and project delivery

Asphalt paving code amendment

Recommended

  1. Council action

    No approval or denial linked in the records collected.

  2. Money in the record

    No itemized amount linked in the records collected.

  3. Signed agreement and payments

    Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.

  4. Work and operating costs

    Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →

Every hearing and vote

  1. June 4, 2025 · Planning Commission

    Asphalt paving code amendment (Section 15.01.1250)

    Recommended for approval · 5-0

    Assistant City Engineer Kelvin Smith said the change increases the required pavement cross-section on city roads to a 6-inch compacted thickness laid in two lifts, for longer-lasting roads, and requires pavement cores to determine existing conditions. He said cores are mainly for developers but help decide whether a road needs rebuilding or an overlay; the streets department mostly relies on visual inspection.

    • Initiated by city engineering
    • Asphalt: 6 inches compacted, two lifts
    • Pavement cores required

    Seconded by Commissioner Chris Christiansen. Vote: 5-0