Little Kate pathway
Proposed 12-foot shared-use path on Little Kate Road and 8-foot path on Lucky John Drive, $2.2 million with a city share of $330,000. Council moved to bring it back as a Phase 2 after bus stop work.
Approved
- Type
- Road project
- Location
- Little Kate Road and Lucky John Drive
- City Council: Little Kate Road project (work session)
- City Council: Bus stop improvement project phases 2 and 3: Acme Construction
- City Council: Little Kate pathway update (work session)
In brief
Little Kate pathway appears on 3 recorded agendas, from the City Council meeting of April 30, 2026 to the City Council meeting of July 9, 2026.
On record, it was approved once.
The most recent decision was approved (5-0) at the City Council meeting of May 7, 2026.
Follow the money and project delivery
Little Kate pathway
- Council action
Approved: Bus stop improvement project phases 2 and 3: Acme Construction · Approved minutes Record → · May 7, 2026
- Money in the record
budget: $2.00 million — Little Kate project funding, including $1.6 million federal Record → · July 9, 2026
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
July 9, 2026 · City Council
Little Kate Road project (work session)
Discussed
Staff presented four build concepts plus a no-change option; of 92 survey responses the most support was for 1A, a buffered bike lane with some sidewalk widening. The project has $2 million in funding, including $1.6 million in federal funds tied to a pre-approved scope. Council members mostly favored 1A or 1B; the mayor wanted traffic calming that takes space from travel lanes. It returns August 13 for final design. No vote.
May 7, 2026 · City Council
Bus stop improvement project phases 2 and 3: Acme Construction
Approved · 5-0
Approved a construction contract with Acme Construction, up to $10,000,000, for 65 stop upgrades, 25 new shelters and sidewalk and crosswalk work; 38 stops are scheduled for 2026 and 27 for 2027. Total project funding is $17,495,397 (federal $12,001,135; state $420,000; county $2,400,000 per the presentation; city $2,174,262; city other $500,000). Little Kate concepts were presented but not selected. The minutes list the county share as $2,174,262, which does not sum.
April 30, 2026 · City Council
Little Kate pathway update (work session)
Discussed
The project includes a 12-foot shared-use path on the north side of Little Kate and an 8-foot path on the east side of Lucky John, narrowing the road from about 30 to 23.5 feet. Total cost is $2,200,000 with the city's share at $330,000; a grant awarded in 2023 funds most of it. Council members were divided on separating bikes and pedestrians. The mayor said the council wanted to advance the bus stop project and bring Little Kate back as a Phase 2; staff will propose reducing the contract amount. No vote.