Eagle Mountain · City Council

Council approves Deer Haven easement 4-1, Oquirrh Mountain Ranch Option B and Spring Run Phase D, 5-0; tables accessory dwelling rules

October 19, 2021, 4:00 p.m. · Eagle Mountain City Council Chambers, 1650 E Stagecoach Run, Eagle Mountain, Utah

The council approved the Deer Haven conservation easement 4-1 with seven conditions, the Oquirrh Mountain Ranch plan and plat (Option B, up to 260 units) 5-0, a Fire Station 251 rezone and the Spring Run Phase D amendment and plat. It tabled the accessory dwelling unit ordinance 4-1. The meeting ended at 11:31 p.m.

From the approved minutes. Updated October 14, 2026.

Decisions at a glance

Agenda, item by item

  1. Item 9.A · Subdivision

    Deed of conservation easement, Deer Haven

    Approved with conditions · 4-1

    Applicant Scot Hazard said he would meet the easement controls but opposed writing them all into the easement; he accepted four entries a year, adding 'other manmade objects' and keeping half the easement width unobstructed. Council Member Carolyn Love's motion added seven conditions: entry limited to four times a year; restricted amenities and a 50 percent width limit; construction banned March 15 to May 15 and Dec. 1 to Jan. 15, effective Jan. 1, 2023; a hillside section with a 50-foot setback from washes and no development on slopes over 25 percent; lighting limits (3,000 Kelvin, 850 lumens per fixture, recreational lighting no higher than 15 feet); and residential livestock limits on agricultural lots 109 and 110. Council Member Jared Gray opposed, saying agricultural zoning rights should apply and the fence standards would not retain livestock; Council Members Donna Burnham, Melissa Clark and Colby Curtis supported the residential limits. Bettina Cameron urged Deer Haven-only terms.

    Moved by Council Member Carolyn Love, seconded by Council Member Colby Curtis. Vote: 4-1; Gray voted no. Voting no: Council Member Jared Gray

    Follow Deer Haven in the development tracker →

  2. Item 12.A · Subdivision

    Oquirrh Mountain Ranch second master development agreement amendment (Option B)

    Approved with conditions · 5-0

    The 120.4-acre project has 54 units and a church built on 18 acres, with about 102.4 acres left. Applicant representative Tamara Connolly described a petroglyph park, trail links, 57 acres dedicated to the city and a preference for Option A (maximum 283 units) with Option B as the minimum viable lot count. The Planning Commission recommended Option B (58 lots at 45-foot frontage, 80 at 50-foot, 68 at 55-foot; maximum 260 units). The council approved Option B with eight conditions: wildlife corridor and hill open space as OS-N, improved open space as OS-I, residential pods as RC, HOA ownership of any lift station, five-foot side setbacks with a ten-foot garage side, and a 20-foot southern buffer added to adjacent lots with an easement if a lift station is needed. Cameron supported the petroglyph park.

    • Acres: 120.4
    • Maximum units: 260 (Option B)

    Moved by Council Member Donna Burnham, seconded by Council Member Colby Curtis. Vote: 5-0

    Follow Oquirrh Mountain Ranch in the development tracker →

  3. Item 12.B · Subdivision

    Oquirrh Mountain Ranch Option B site plan and preliminary plat

    Approved with conditions · 5-0

    Approved with five conditions covering compliance with agreement standards, 6.5 acres of improved open space, the side setback rule and an amended and restated agreement.

    Moved by Council Member Donna Burnham, seconded by Council Member Colby Curtis. Vote: 5-0

    Follow Oquirrh Mountain Ranch in the development tracker →

  4. Item 13.A · City code

    Accessory dwelling units ordinance (replacing accessory apartments)

    Tabled · 4-1

    Steve Mumford presented renaming accessory apartments to ADUs, detached ADU standards, a 30-day minimum rental, tiny home standards and an extra parking space. The Planning Commission recommended approval 4-1. Curtis objected to the RC zone reasoning and asked to prohibit shipping container ADUs; Love proposed an initialed acknowledgment rather than a notarized landlord letter. A resident asked that an ADU above a garage match the garage footprint, which would exceed the proposed 1,000-square-foot cap. Mumford said state law bars limits on internal ADUs based on lot size, frontage or relation to the primary dwelling. The council tabled it to the next meeting.

    Moved by Council Member Jared Gray, seconded by Council Member Donna Burnham. Vote: 4-1; Curtis voted no. Voting no: Council Member Colby Curtis

    Follow Accessory dwelling unit ordinance in the development tracker →

  5. Item 13.B · Zoning

    Fire Station 251 rezone

    Approved · 5-0

    About 1.25 acres were rezoned to Public Facilities from a Community Commercial plan designation for an approximately 11,000-square-foot station for six firefighters, presented by Steve Simmons of AJC Architects. Burnham recommended headlight screening toward nearby homes. No one spoke.

    • Acres: about 1.25

    Moved by Council Member Donna Burnham, seconded by Council Member Carolyn Love. Vote: 5-0

    Follow Fire Station 251 rezone in the development tracker →

  6. Item 14.A · Development

    Spring Run fourth master development agreement amendment

    Approved · 5-0

    Phase D rises from 178 to 182 units through a road-connection change; applicant representative James Allred agreed to a staff-requested road realignment, and total units remain under the original vesting. The Planning Commission recommended approval unanimously. No one spoke.

    Moved by Council Member Donna Burnham, seconded by Council Member Carolyn Love. Vote: 5-0

    Follow Spring Run Phase D in the development tracker →

  7. Item 14.B · Subdivision

    Spring Run Phase D preliminary plat

    Approved · 5-0

    Plat area is 68.55 acres at 2.72 units an acre, amended to 69.96 acres with up to 268 units at 3.83 an acre; the applicant asked for an exemption from connecting two cul-de-sacs because of grade.

    Moved by Council Member Donna Burnham, seconded by Council Member Carolyn Love. Vote: 5-0

    Follow Spring Run Phase D in the development tracker →

  8. Item 1.B · Development

    Eagle Mountain Medical Office Building (work session)

    Discussed

    The Planning Commission recommended approval 4-0. Applicant representative Bruce Fallon of WPA Architecture presented; Curtis preferred the building not include white and Love asked that future projects present detailed materials in work sessions.

    Follow Eagle Mountain Medical Office Building in the development tracker →

  9. Item 1.C · Public safety

    Emergency operation plan (work session)

    Discussed

    Emergency management intern Greg Stone presented the draft. Clark supported it, proposed a biennial review and asked for clarity on lines of authority.

  10. Item 1.A · Roads and utilities

    City administrator update (work session)

    Discussed

    Staff covered wastewater basins on the 80 acres bought this year, wells, and Airport Road Phase 1 paving on Oct. 28-29. Curtis requested a steering committee for the affordable housing plan. Franchise applications from Direct Communications, Silver Lake Internet and Lumens may proceed.

    Follow Airport Road alignment and design in the development tracker →

  11. Item 10-11 · Subdivision

    Consent agenda

    Approved · 5-0

    Brandon Park Phase A Plat 6 moved out of warranty and the Oct. 5 minutes were approved; the Deer Haven easement was removed for separate action.

    Moved by Council Member Colby Curtis, seconded by Council Member Carolyn Love. Vote: 5-0

What residents said

Wildlife corridorLot frontageADU size limitsFence standards

Bettina Cameron of the Eagle Mountain Nature and Wildlife Alliance explained the purpose of the fence standards and urged applying easement terms only to Deer Haven. At the Oquirrh Mountain Ranch hearing she supported the petroglyph park and removal of a frisbee golf course. A resident asked that an ADU above his garage match the garage design.