Storm water system design standards code amendment
Adds lot-level detention and retention rules, runoff responsibility and geotechnical requirements (Section 13.94.040), plus signatures from affected water-right holders. Recommended 5-0 March 19, 2025.
Recommended
- Type
- Code change
- Location
- Citywide
- Applicant
- American Fork City
In brief
Storm water system design standards code amendment appears on one recorded agenda: the Planning Commission meeting of March 19, 2025.
On record, it was recommended for approval once.
The most recent decision was recommended for approval (5-0) at the Planning Commission meeting of March 19, 2025.
Follow the money and project delivery
Storm water system design standards code amendment
- Council action
No approval or denial linked in the records collected.
- Money in the record
No itemized amount linked in the records collected.
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
March 19, 2025 · Planning Commission
Storm water system design and management standards code amendment (Section 13.94.040)
Recommended for approval · 5-0
Adds requirements for individual lot detention and retention systems, clarifies owners' duty to keep runoff off neighboring property, and clarifies geotechnical report requirements for infiltration designs. The recommendation adds Commissioner Frandsen's request that landowners with water rights sign to show they were notified and agree.
- Initiated by city engineering
- Added: signatures from affected water-right holders