900 West reconstruction, North Temple to 600 North
Grant application for Surface Transportation Program funds to reconstruct 900 West to improve road conditions, mobility and transit, pedestrian and bike access. The Council held a hearing March 22, 2022 and referred it to a future consent agenda.
- Where it stands
- Approved
- Type
- Road project
- Location
- 900 West between North Temple and 600 North
Every hearing and vote
March 22, 2022 · City Council
Public hearing on six transportation and water grant applications
Approved · 6-0
The Council heard six grant applications together: a Congestion Mitigation Air Quality grant for an East Downtown mobility hub at 200 South; a Surface Transportation Program grant for reconstruction of 900 West from North Temple to 600 North; a WaterSMART grant for Rose Park Golf Course irrigation efficiency (anticipated savings of 188.87 acre-feet a year); a bike share expansion west of I-15; a Transportation Alternatives grant to design Foothill Drive pedestrian and bike safety improvements; and a 1300 East/University District circulation study grant. One speaker opposed the transit hub, the 900 West plan and the bike crossings; another supported the grants, citing safety on North Temple and 600 North. The hearing was closed and the items referred to a future consent agenda.