Heber City development tracker

Traffic calming and pedestrian safety improvements

Sidewalk gap fills, striping and bulb-out crosswalks on 100 West and near schools, with $200,000 in FY27 Transportation Tax funds. Staff proposes doing the work through a change order with the 300 South Trail contractor.

Where it stands
Proposed
Type
Road project
Location
100 West; 910 South; Mill Road
Follow the money and project delivery

Traffic calming and pedestrian safety improvements

Proposed

  1. Council action

    No approval or denial linked in the records collected.

  2. Money in the record

    change-order: $200,000 — Traffic calming and pedestrian safety improvements (budget figure, not a bid) Record → · Oct. 20, 2026

  3. Signed agreement and payments

    Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.

  4. Work and operating costs

    Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →

Every hearing and vote

  1. October 20, 2026 · City Council

    Traffic calming and pedestrian safety improvements

    Pending

    Staff proposes striping and sidewalk gap fills on the west side of 100 West between 600 South and 1000 South (about 1,100 linear feet of 5-foot sidewalk), school crosswalks with bulb-outs at 910 South and 100 West and at 910 South and 300 West (the latter with pedestrian-activated flashing beacons), and bulb-outs near 640 North and 380 North Mill Road and near Willow Way and Valley Hills Drive. Street parking would be lost where bulb-outs and a turn lane go in. Staff proposes a change order with the contractor already building the 300 South Trail, whose bid was 12% below the next bidder and 27% below the average, and asks for an exception to the three-quote rule for change orders of this size.

    • Staff recommendation: approve if agreeable terms are reached with existing contractors

Saved on this device. Statewide news and alerts remain available.