9400 South safety study (SR-209, 1300 East to Wasatch Boulevard)
Public Works study of safety on 9400 South. It found 76% of crashes occur between 1300 East and 2300 East and recommended a pedestrian crossing structure near 1300 East, signal changes, advanced warnings, raised medians, enhanced bike lanes and roundabouts. Presented Oct. 28, 2025.
Proposed
- Type
- Road project
- Applicant
- Sandy Public Works
- Location
- 9400 South between 1300 East and Wasatch Boulevard
In brief
9400 South safety study (SR-209, 1300 East to Wasatch Boulevard) appears on one recorded agenda: the City Council meeting of October 28, 2025.
Follow the money and project delivery
9400 South safety study (SR-209, 1300 East to Wasatch Boulevard)
- Council action
No approval or denial linked in the records collected.
- Money in the record
No itemized amount linked in the records collected.
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
October 28, 2025 · City Council
Solutions development study for SR-209 (9400 South) from 1300 East to Wasatch Boulevard
Discussed
Britney Ward said 76% of crashes on 9400 South occur between 1300 East and 2300 East. Recommendations include a pedestrian over- or underpass near 1300 East, signal timing changes, advanced warning signals, raised medians, enhanced bike lanes and roundabouts. A Zoom failure occurred; residents were directed to a call-in number.