Thursday, October 15, 2026The Utah Ledger

Everything Utah, every day.

Sandy development tracker

9400 South safety study (SR-209, 1300 East to Wasatch Boulevard)

Public Works study of safety on 9400 South. It found 76% of crashes occur between 1300 East and 2300 East and recommended a pedestrian crossing structure near 1300 East, signal changes, advanced warnings, raised medians, enhanced bike lanes and roundabouts. Presented Oct. 28, 2025.

Where it stands
Proposed
Type
Road project
Location
9400 South between 1300 East and Wasatch Boulevard
Applicant
Sandy Public Works

Every hearing and vote

  1. October 28, 2025 · City Council

    Solutions development study for SR-209 (9400 South) from 1300 East to Wasatch Boulevard

    Discussed

    Britney Ward said 76% of crashes on 9400 South occur between 1300 East and 2300 East. Recommendations include a pedestrian over- or underpass near 1300 East, signal timing changes, advanced warning signals, raised medians, enhanced bike lanes and roundabouts. A Zoom failure occurred; residents were directed to a call-in number.