Power District Transportation Study
Wasatch Front Regional Council study of multimodal transportation options within a mile of the Power District site, including a below-grade rail crossing at 200 South/650 West and street extensions. Council Members raised its dependence on a proposed baseball stadium and Westside transit needs on August 19, 2025.
In review
- Type
- Public project
- Location
- North Temple between I-215 and 1000 West
In brief
Power District Transportation Study appears on one recorded agenda: the City Council work session meeting of August 19, 2025.
Follow the money and project delivery
Power District Transportation Study
- Council action
In review according to the dated project source. Record → · Aug. 19, 2025
- Money in the record
No itemized amount linked in the records collected.
- Signed agreement and payments
Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.
- Work and operating costs
Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →
Every hearing and vote
August 19, 2025 · City Council work session
Power District Transportation Study
Discussed
The Wasatch Front Regional Council and a consultant presented a study of transportation options within a mile of the Power District along North Temple between I-215 and about 1000 West. Council Members raised the plan's limited scope and dependence on a baseball team and stadium, unsafe crossings and bottlenecks, lack of Westside transit investment, and coordination with the West-East Connection Study. Council Member Dugan preferred an alternative to a steep grade at the proposed 200 South/650 West below-grade rail crossing, Council Member Puy noted the Navajo Street extension could create a dead end, and Council Member Petro raised safety risks of the South Temple extension west.