Published by Paul Ivinskas · Politically neutral. No endorsements.
Thursday, November 5, 2026

Utah, on the record.

Same sections for every candidate. Every fact linked to its source. How we stay neutral →

Holladay development tracker

Murray Holladay Road lane-width text amendment

A resident-sought text amendment to Title 13.02.040 would allow narrower travel lanes (11.5 to 10 feet) and phased sidewalk work on part of Murray Holladay Road to reduce speeding. The Planning Commission voted 7-0 to deny; the council closed its hearing on Feb. 6, 2025 without action and the mayor preferred other options.

In review

Type
Code change
Location
Murray Holladay Road
  1. Feb 6, 2025City Council: Public hearing: Murray Holladay Road dimensional standards (Title 13.02.040)
  2. Feb 6, 2025City Council: Work meeting: speeding, lighting, Title 11, bike lane parking

In brief

Murray Holladay Road lane-width text amendment appears on one recorded agenda: the City Council meeting of February 6, 2025.

Follow the money and project delivery

Murray Holladay Road lane-width text amendment

In review

  1. Council action

    No approval or denial linked in the records collected.

  2. Money in the record

    budget: $25,000 — Phase 1 restriping, applicant estimate; budget: $5,000 — Phase 2 sidewalk start, applicant estimate, to be covered by a bond; budget: $120,000 — Phase 3 sidewalk extension, applicant estimate Record → · Feb. 6, 2025

  3. Signed agreement and payments

    Execution and project-level disbursements are not verified by this tracker. They require separate records; meeting approval alone does not establish either.

  4. Work and operating costs

    Check the linked records for completion and recurring operating costs; this tracker does not verify them. Record →

Every hearing and vote

  1. February 6, 2025 · City Council

    Public hearing: Murray Holladay Road dimensional standards (Title 13.02.040)

    No action

    The applicant proposed phased changes to a section of Murray Holladay Road: restriping to narrow travel lanes from 11.5 feet to 10 feet (phase 1, about $25,000), starting a new sidewalk (phase 2, about $5,000, covered by a bond) and extending it to the road end (phase 3, about $120,000). He framed the issue as public safety and speeding. The Planning Commission voted 7-0 to deny, and the packet held 15 public comments. Mayor Dahle said he needed convincing that narrowing lanes and removing the center line improves safety and preferred other options first. The hearing was closed and the minutes record no motion.

    • Planning Commission: 7-0 to deny
    • Lane width: 11.5 feet to 10 feet proposed
  2. February 6, 2025 · City Council

    Work meeting: speeding, lighting, Title 11, bike lane parking

    Discussed

    City staff reported an 85th-percentile speed of about 30 mph on the Murray Holladay Road section. Council Member Quinn said narrowing would not slow vehicles; Mayor Dahle favored other options. The council also reviewed a draft lighting chapter (13.84), the definition of a low-profile motorized vehicle (under 36 inches; Brewer proposed a speed link above 25 mph), a spring container priority system for waste service, and state bill HB 290 on parking in bike lanes. No votes.