Beaver approves about $47,900 water advance for Baker Canyon line, structured as a loan
Beaver's council approved a Drinking Water Hardship Fund advance of about $47,900 to plan and engineer repairs to the culinary waterline damaged at the base of Baker Canyon. The agreement is a loan for now; the city intends to seek conversion to a grant.

Continuing storyBeaver: Baker Canyon water line, FEMA consultant and EV chargers
Beaver's City Council voted Sept. 8, 2026 to take a Drinking Water Hardship Fund advance of approximately $47,900 to plan and engineer work on the culinary waterline damaged at the base of Baker Canyon, according to the meeting minutes. [1]
City Manager Monte Hawkins described the agreement as funding to establish a project scope. The minutes say the agreement is currently structured as a loan and that the city intends to apply to convert it to grant funding when it requests the related booster pump project. [1]
The vote
Council Member Lance Cox moved to approve the advance agreement and Council Member Randy Hunter seconded. The motion passed unanimously. [1]
The minutes record the amount as approximately $47,900. A separate note in the same item reads 47,000. [1]
The council approved the Sept. 8 minutes at its Sept. 22 meeting on a motion by Council Member David Albrecht, seconded by Council Member Hunter Holt. [2]
An approved advance structured as a loan is not a grant. The amount is described in the minutes as approximate, and one note in the same item reads 47,000.
Sources
- Beaver City Council · Sept. 8, 2026 minutes utah.gov
- Beaver City Council · Sept. 22, 2026 minutes (posted) utah.gov
Reporting by The Utah Ledger from the public records above. AI-assisted; paragraphs link to their sources.
No corrections or significant updates to this story. Report an error · Corrections log


